HomeMy WebLinkAboutRES 082719-S - Building Permit FeesRESOLUTION NO. &&jL-S
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
GEORGETOWN, TEXAS APPROVING AND ADOPTING THE
ATTACHED FEE SCHEDULE FOR CERTAIN BUILDING PERMITS AND
INSPECTIONS; PROVIDING A CONFLICT CLAUSE AND
SEVERABILITY CLAUSE; AND ESTABLISHING AN EFFECTIVE DATE.
WHEREAS, House Bill 852, enacted by the Texas Legislature on May 8, 2019 and signed
into law by the Governor on May 21, 2019, prohibits municipalities from considering the value of
a dwelling or the cost of constructing or improving a dwelling in determining the amount of a
building permit or inspection fee required in connection with the construction or improvement of
a residential dwelling; and
WHEREAS, the City Council finds it necessary to adopt a revised fee schedule for certain
residential building permits and inspection fees in order to comply with House Bill 852 as set out
herein.
NOW THEREFORE BE IT RESOLVED:
SECTION ONE. The facts and recitations contained in the preamble of this resolution are
hereby found and declared to be true and correct, and are incorporated by reference herein and
expressly made a part hereof, as if copied verbatim.
SECTION TWO. The following Construction Fee Schedule, attached to this Resolution, is
approved and adopted:
Exhibit A - "Construction Fee Schedule"
SECTION THREE. If any provision of this Resolution or application thereof to any person or
circumstance, shall be held invalid, such invalidity shall not affect the other provisions, or
application thereof, of this Resolution which can be given effect without the invalid provision or
application, and to this end the provisions of this Resolution are hereby declared to be severable.
SECTION FOUR. This Resolution shall be effective immediately upon passage by the City
Council.
SECTION FIVE. The Mayor is hereby authorized to sign this Resolution and the City
Secretary to attest.
Resolution Number:
Description: Residential Building Permit Fees
Date Approved: �l 2019
Page 1 of 2
PASSED AND APPROVED on the day of k;6'f- , 2019.
ATTEST:
Robyn ansmore, City Secretary
APPROVED AS TO FORM:
Charlie McNabb, City Attorney
Resolution Number:
Description: Residential Building Permit Fees
Date Approved: 2019
CITY OF GEORGETOWN, TEXAS
6.,e"CCz.,
Dale Ross, Mayor
Page 2 of 2
I. ,..:. Inspectio
City of Georgetown
Fees Included:
Building Permits and Inspections Fee Schedule
Water and Wastewater Impact Fees
US S Water and Wastewater Connection & Engineering Fees
Electrical Connection Fees
11T, 1848
GEORGETOWN
TEYAS
IN 5PECT
ar, n;croxoe,—
Glr+t�ri ltn�� CONSTRUCTION FEE SCHEDULE
BUILDING PERMIT FEES
New Residentilill
'Nola: Bullding perml[leea ne?s+•Yn•••� :-•••••enfeminrM Rylhrafol.tt�.are
feet of he shwu a to Indude:INass porch & 0a-W
ILi•{Wlwrwwr,alCWnLes„NiWOi�MMraWnlYa*+iifitr�Mt�N` �]
!k ✓Yk�:rSo rt 0.rrn �.,r„[rtlr.ws_WLYIe
ssF l4ola — •Wo
FreaWeitoaoe4y{1�Leafl - �•i.'10054FJe
From)1a-512b001-to-g50B-B41B . itlO— - iYG]
Miscellaneous Residential
JWp Fee
Permit F,.
Tech Fee
=fa.Fl elute)e•..�,.T,e-•.y�i+.ei•%f9lS
Remodel, repair, alteration, addition, sunr..m, enclosure, accessary/storage building, patio,
mrl'"��dw.wyem�oeldoaamf:oWanne.r enR 1�►e.++TkH.h�kiwrarnl;.._
Ydew ,Y
$35 00
'cam
;.Q40•
s -k
$6.011
r aaw�f>rirrhlw.16-1,
$9 .9
WA
36.90
Fe -to dulasi. lien kolsovas
N/A
1 $25.00
1. 6.00
Re -roof (n. change in pitch), water heater, solar tubes, solar attic an, patio cover, pergola,
"!Lw, tmel lhnl
N/A
$35-00
$6,00
Ixmevron.
erou.d
N/A
S65.00
$6.00
swlmml nppl - in inuna above a/hot tub
NIA
$55.00
$10.00
Now. ouh,cotecer-eedwL
NIA
$100,00
$6.00
New Commercial
App Fee
Permit Fee
Tech Fee
New commercial
.40W,."mildieg pesrrut(M sodnOd 0.*011,i wlu.loa dmmminnd 6y i4r 1.144 yQ ft
feet of the structure wh lch ..dudes: parking lot, driveway and sidewalk mueiplied by the
ncount found on [he ICC tnternatlOnal Cade Council) BVD (Building Valuation Data) Table
ordin to Occu anc T .and Conslruc[ionT a
$100.00
ejee note
$50.00
Tollyero4tlon hr Sefr' 9osa Oatoredd,b'n�I55500
WAfd600
Up t. $Sb,000 $250 SS 00
FromAOS501001 to Sim," 53SO $400
From/to$100,001 to$500,000 $460 $300
Over S5ctkp00 $le6rh S31x1
For all plans of new residential buildings no more than two stories high and four living units, no fees will be
charged Far Residential buildings three stories in height and more than four living units, the plans review fee shall
be one-half of the building permit Fee payable at the time of issuance of the building permit
For all plans of new commercial buildings, as classified by the building code as commercial occupancy types and
remodels, additions or alterations, the plan review fee shall be one-half of the total building permit Fee, plus a Fire
Services review fee of $250 00
All other buildings, including residential structures and in excess of four stories high, commercial building three
stories and higher, schools and all other buildings are subject to forwarding to the International Code Council, Inc,
(ICC), for plans review at the discretion of the Building Official For those plans forwarded to ICC for review, the
fees as determined by ICC at the time of submittal, shall be paid directly to ICC by the applicant and be
nonrefundable, The Building Permit, Fire Services review fee of $250.00, and Utility Connect fees shall be paid
directly to the City of Georgetown as prescribed in this fee schedule before the building permit will be issued
■vAKMA�SYlf�hwl�ll. 1
Miscellaneous Commercial
APP.F.0
P.rmltfe.
Tab Ft.
Commercial Remodel, alteration, addition, tenant finish out' r,0a/s It
$75.00
•175.00
$15,00
Certificate of Occupancy (New construction, change of name, change owner of
business, than a of name and owner of business,lease soace expansion)
N/A
$80.00
96.00
Demolition Commerclal per sto -per structure
N/A
$115.00
$6.00
Temp use permit link, troller, sales trailer, seasonal sales)
WA
$100.00
S10.00
Swimming pool and -pa
N/A
995.00
$10.00
• PF+m.IstM IL 'WA -mast
N/A
S75.00
$6.00
5 ns rtempora -banners Good lnr a5 calendar da sfrnm date ofissuaaFe
A
1 $25.20
$6,00
si ns tam o ants om •SS BB additmnal over Ss ns
A
I "$25.00
1 $6-00
Miscellaneous Permits
Am F..
Permit Fee
T.pbF..
Individual trade)sdb-contractor permits nectr-1, hvac mechanical and plumbing
AbTY_ rr.dtjWo,&I JbtdfrW aparPul.hsaAl .round up arc lnrluded with building perm11
however val[d.1hm is -Ind.
N/A
•535,00
56.00
MdMdwlla.tli/slrAtq.aM.[ prsreslp k [.F rTl V".. Terrines IseRdrtlknk
Electrical hvac, mechanical an d plumbi rnrNFWressidential and rovuoe,cialmasseraiav
WA
$15f.L00
$10.M
Flood Plain Review
WA
$100-00
S10.00
Nd wMes
A
100-00
56.00
Movin abuildin -'oar b.11,14
N/A
*590.00
510.00
Building Standards Commission:
Variance ora cal to the Buildin Code
N/A
$250.00
$"00
Pho[ovol[alc/solar panels .
rove sewr.ee�vctrrr,rura. n a.d
S35.00
45.00
$6.00
Temp Ic-t pf.p.ny owner/I�ndlord
Rnldmd
atitma.nrnlx
fmibr;es nol;n service mare monbmonrns
N/A
$35.00
$b.00
Re -Inspection/ Trip Charge Fees
Residential 1st time
$35.00
Residential ]nd time
970.00
R-d.n{ulI'd iIm.'Alin! grd Time, 2. Iwtd oa W synr
*5140-00
Tpip chligeFff per[ for P.0ai& Moftw •AOMI.m .ore
$50-00
commercial n model etc) 1st time
S50-00
Commercial)new, remodel etc end time
$10000
Commercial 3rd time'After 3rd time, 2 day hold on 1.5als joas
*S200.00
CrmHc.-fQrcuaanCV
$50.00
Commercial Construction Plan Review Of Revisions Or Plan Review Comments
Ut and 2nd rare) tol Ian corrections byapplicant
Nochar e
3rd-eip[or Ian carrettlonsb Ilcanf
$50.00
4[h rece._ of Dian corretions b )icon[
$75.00
Sxh taro) of mrnW.s .rH
$100.00
Utility Application Fees (Applies to New Utility Connections Outside of the C�lp
Utility Connect Application Fee
$75.00
GEORGETOWN UTILITY SYSTEMS CONNECT FEES
Water Meter Connections
Residential and Commercial (based on water meter size)
Inside City Limits
Outside City Limits
3/4" Water Meter
$350.00
$500.00
1" Meter
$500.00
$650.00
1 1/2" Meter
$650.00
$800.00
2" Meter
$950.00
$1,100.00
Greater than 2" Meter
*$50.00
*$200.00
** Fee plus meter and actual cost of materials and labor
Water Engineering and Inspection Fee
Single Family - Per dwelling unit
$500.00
Multi Family (2 or more units) - Per dwelling unit
$250.00
Commercial
$.20/Sq ft area
Waste Water Connections
Residential and Commercial (based on wastewater line)
Inside City Limits
Outside City Limits
4"
$300.00
$450.00
6"
$450.00
$600.00
8"
$650.00
$800.00
Greater than 8"
**$50.00
**$50.00
Liberty Hill with Western District(Formally Chisholm Trail
$600.00
** Meter plus actual cost of materials and labor
Waste Water Engineering and Inspection Fee
Single Family - Per dwelling unit
$500.00
Multi Family-(2 or more units - Per dwelling unit
$250.00
Liberty Hill with Western District Water (Formally Chisholm Trail)
$60.00
Commercial
$.06/Sq ft area
Industrial
$.10/Sq ft area
Electric Utility Connect
Single Phase
0-200 amps
$400.00
201-400 amps
$600.00
Greater than 400 amps
Actual cost of materials and labor
Three Phase
0-200 amps
$1,550.00
201-400 amps
$2,500.00
Greater than 400 amps
Actual cost of materials and labor
Note: In some cases, cost of electrical connections may have to be calculated by Electrical Engineering Department
IMPACT FEES
PER CITY ORDINANCE CHAPTER 13.32 WATER AND WASTEATER IMPACT FEES:
Sec. 13.32.070. - Assessment of impact fees:
A. The approval of any subdivision of land or of any new development within the impact fee service area shall include as a condition of development the
assessment of the impact fee applicable to such development.
B. Assessment of the water and wastewater impact fees for any new development shall he made as follows:
1. For ad eve lopmentwhich is submitted for approval pursuant to the Clty's subdivision regulations following the effective date of the ordinance
codified in this chapter, assessment shall beat the time a preliminary plat is approved by City Council and shall be in the amount of the assessed
fee per service unit then in effect asset forth in Exhibit B, attached to the ordinance codified in this chapter, on record in the office of the City
Secretary, except as provided in subsections B.2., 3., and 4. of this section;
2. For ad eve lopment for which no plat is required or issued, assessment shall occur at the time of building permit application, For development for
which no building permit is issued, assessment shall beat the time of utility connect permit application;
3, For a development for which a preliminary plat was approved, but which has expired, assessment shall occur at the time a new preliminary plat
approval is sought;
4. For septic tank cutovers, assessment shall be at the time of utility connect permit application.
C. Following assessment of the impact fee hereunder, the amount of the impact fee per service unit may not be increased above the assessed fee unless
the owner redevelops or seeks approval of new plan required as a result of an approved development plan expiration.
D. An application for an amended plat made pursuantto Texas Local Government Code Section 212.016 (Vernon) or the City's subdivision rules is not
subject to a reassessment of the impact fee,
(Ord- No, 2005-61, § 6; Ord, No. 2003-39, §§ 2, 3(Exh. A); Ord. 96-1 § 2 (Att. A) (part))
-Note: Use of S/8" meter for limited application to small residential units (<1,200 square feet of air conditioned heated space) where no automatic landscape
irrigation system will be installed- Other potential applications are public facilities such as restrooms in parks.
Pre October 2003 Impact
Fees
Meter Size
Multiplier
Residential
Water
Residential
Wastewater
Non Residential
Water
Non Residential
Waste -water
5/811'
0.667
$825
$600
$1325
$1.098
3/4"
1
S825
$600
$1,325
$1,098
1"
1.667
$1,375
$1,000
$2,209
$1,830
1.5"
3.333
$2,750
$2,000
$4,416
$3,660
2"
6.667
$5,500
$4,000 1
$8,834
57,320
3" J
16
$13,200
$9,600
2 200
$17,568
October 2003 impact Fees
Meter Size
Multiplier
Water
Waste Water
5/8"'
0.667
$1,530
51..247
3/4"
1
$2,295
$1,869
1"
1.667
$3,826
$3,116
1.5"
3.333
$7,649
$6,229
2"
6.667
$15,301
S12,461
3"
16
$36,720
$29,904
4"
28
$42,840
$34,916
October 20051mpact Fees
Meter Size
Multiplier
Water
Waste Water
South Fork Waste Water
5/8""
0.667
$1,530
$1,255
$2,077
3/4"
1
$3,324
$1,881
$3,114
1"
1.667
$5,541
$3,136
$5,191
1.5"
3.333
$1 ,079
$6,269
$10,379
6.667
$22,161
$12,541
$20,761
3" 1
16
1 $53,184
1 $30,096
$49,824
November 2010 Impact Fees
Meter Size
Multiplier
Water
Waste Water
South Fork Waste Water
5/81,*
0.667
$2,342
51,130
$1,952
3/4"
1
$3,511
$1,694
$2,927
1"
1.667
$5,853
$2,824
$4,579
1,51
3.333
$11,702
$5,646
$9,756
2"
6.667
$23,408
$11,294
$19,514
3"
1 16
$56,176
$27,104
$46,832
October 2025 Impact Fees
Meter Size
Multiplier
Water
Waste Water
South Fork Waste Water
5/811'
0.667
$5,139
52.997
$4.452
3/4"
1
$5,139
52.997
$4,452
1" •
1.667
$8,566.71
$4,996
$7421.48
1.5"
3.333
$17,128.29
$34,261,71
$9,989
$19,981
$14,838.52
$29,691.48
2"
6.667
3"
16
$82,224.00
$47,952
$71,232
4"
28
$143,89200
$83916.00
$124,656.00
6"
61.333
5315,190.29
$183,815.00
$273,054.52
8"
106.667
1 5548.161.71
5319,681.00
$474,881.48
October 2016 Impact Fees
Meter Size
Multiplier
Water
Waste Water
South Fork Waste Water
5/8"'
0.667
$6,139
$2 997
$4,452
3/4"
1
$6,139
52.,997
$4,452
1"
1.667
$10,233.71
$4,996
$7421.48
1.5"
3.333
$20,461.29
$9,989
$14,838.52
2"
6.667
$40,928.71
$19,981
$29,681.48
3"
16
$98,224.00
$47,952
$71,232
4"
28
$171,892.00
$83916.00
$124,656.00
6"
61.333
$375,523.29
$183,815.00
$273,054.52
8"
106.667
$654,828.71
$319,681.00
$474,881.48
October 2027 Impact Fees
Meter Size
Multiplier
Water
Waste Water
South Fork Waste Water
5/8"'
0.667
$7,039.00
$2,997
$4,452
3/4"
1
$7,039.00
2,997
$4,452
1"
1.667
$11,734,01
$4,996
$7421.48
1.5"
3.333
$23,460.99
$9,989
$14,838.52
2"
6.667
$46,929.01
$19.981
529,681.49
3"
16
$112,624.00
$47,952
$71,232
4"
28
$197,092.00
$83916.00
$124,656.00
6"
61.33
$431,722.99
$183,815.00
$273,054.52
8"
106.667
$750,829.01
$319,681.00
$474,881,48
October 2018 Impact Fees
Meter Size
Multiplier
Water
Waste Water
South Fork Waste Water
5/81,*
0.667
$4,616.31
$2,077.71
52,900.12
3/4"
1
$6,921.00
53,115.00
$4,348.00
1"
1.667
$11,537.31
$5,192.71
57.248.12
1.5"
3.333
$23,067.69
$10 382.30
$14,491.88
2"
6.667
$46,142.31
$20,767.71
$28,988.12
3"
16
$110,736.00
$49,840.00
569,568.00
4"
28
2193,788.00
$87,220.00
5121,744.00
6"
61.333
$427.5.69
$191,052.30
$266,675.88
8"
106.667
$738,242.31
$332,267.71
5462,788.12
'Note: Use of 5/8" meter for limited epplitWon to small residential Wits [t1,200 square rest of nir cpttdmarwd111t tdEpnccp rvhcrc no automatic landscape
irrigation system will be installed. Other potential applications are public [ucilittes such as restrooms in parks.
INTERNATIONAL CODE COUNCIL BUILDING VALUATION DATA
A-1 Assembly, theaters, with sta a
244.21
236,18
230.55
221.01
207.82
201.82
214.02
189.83
182.71
A-1 Assembly, theaters, without stage
223.45
215.42
209.80
200.25
187.31
181.32
193.26
169.33
162.21
A-2 Assembly, nightclubs
190,08
184.73
160.34
172.99
163.33
158,82
166.99
147.83
142.92
A-2 Assembly, restaurants, bars, banquet halls
189.08
183.73
178.34
171.99
161.33
157.82
165.99
145,83
141.92
A-3 Assembly, churches
224.47
216.44
210.82
201.27
189.73
183.73
194.28
171.74
164.62
A-3 Assembly, general, community halls, libraries,
museums
188.77
180.74
174.11
165.57
151.59
146.63
158.58
133.64
127.52
A-4 Assembl,arenas
222.45
214.42
207.80
199.25
185.31
180.32
192.26
167.33
161.21
B Business
195.88
188.76
182,90
173.98
159.08
153.13
167.31
139.76
133.67
E Educational
207.44
200.32
195,11
186.22
173.62
164.85
179.83
151.63
147.30
F-1 Factory and industrial, moderate hazard
115.30
109,99
103.87
99.84
89.72
85.56
95 69
73,79
69.57
F-2 Factory and industrial, low hazard
114.30
108.99
103.87
98.84
89.72
84.56
94.69
73.79
68.57
H-1 High Hazard, explosives
107.85
102.54
97.43
92.40
83.50
78.33
88.25
67.57
NP
H234 High Hazard
107.85
102.54
97.43
92.40
83.50
78.33
88.25
67.57
62.34
H-5 HPM
195.88
188.76
182.90
173.98
159.08
153.13
167,31
139.76
133.67
1-1 Institutional, supervised environment
194.98
188.36
182.90
175.20
161.40
157.01
175,29
144.58
140,08
1-2 Institutional, hospitals
327.69
320.57
314.72
305.80
289.87
0.00
299.12
270,56
KIP
1-2 Institutional, nursing homes
227.45
220.33
214.47
205.56
191.65
0.00
198.88
172.34
NP
1-3 Institutional, restrained
222.66
215.54
209.69
200.77
187.11
180.16
194.09
167.80
159.71
1-4 Institutional, day care facilities
194.98
188.36
182.90
175.20
161.40
157.01
175.29
144.58
140.08
M Mercantile
141.54
136.19
130.80
124.45
114.24
110.73
118.45
98.74
94.83
396-81
3-99:20
i84.74
i;z?,93
462.97
338-58
i4- 43
i4645
A-a
394-94
14A RR
44&.88
34-2,-32
1�14 3b
�9
i3J' -98
I�p P9
i29:7-5
ii-" ^••,^•:a ' ly .Ikyies
39498
M8.36
M2.90
175 P
161 49
457,"
3-79.29
44438
140.09
S-1 Storage, moderate hazard
106.85
101.54
95.43
91.40
81.50
77.33
87.25
65.57
61.34
5-2 Storage, low hazard
105.85
100.54 1
95.43 1
90.40
81.50 1
76.33
86.25
65.57
60.34
U Utility, miscellaneous
83.66
79.00
74.06 1
70.37 1
63.47 j
59.32 t
67,24 1
50.19
47.80
Non•Resldentlal Permit Fees are based on total building valuation as determined by current area square foot valuation data
published periodically by the International Code Council (ICC). This fee varies dependent upon the occupancy use and type of
construction.
Updated 498.24482019
FIRE PERMIT FEES
Please contact Fire Department for Fee Schedule at (512) 930-3473 or visit website at htt s: fire. eor etown.or
( Formatted Table