Loading...
HomeMy WebLinkAboutORD 78-09 - Fees for Permits21064 ORDINANCE NO. 78-9 AN ORDINANCE RESCINDING CURRENT BUILDING, PLUMBING, MECHANICAL, AND ELECTRICAL PERMIT FEES AND ESTABLISHING NEW FEES. WHEREAS, the City of Georgetown, Texas, has adopted by ordinance Building, Plumbing, Mechanical and Electrical Codes and, WHEREAS, these coes do not establish Permit fees but indicate that these fees will be established by the authority having jurisdiction and, WHEREAS, each Code requires the issuance of permits and certificates, performance of inspections and maintenance of records and, WHEREAS, the currently established Permit Fees are insufficient to meet inspection and administrative cosh, THEREFORE BE IT ORDAINED BY the City Council of the City of Georgetown that the following permit fees shall be in effect. All ordinances and resolutions inconflict are hereby rescinded. Part I Schedule of Building Permit Fees (a) Permit Fees Total Valuation $100.00 and less $101.00 to $2,000.00 $2,001.00 to $15,000.00 $15,001.00 to $50,000.00 $50,001.00 to $100,000.00 $100,000.00 to $500,000.00 $500,001.00 and up (b) Moving of Building or Structures Fee No fee, unless inspection required, in which case a $3.00 fee for each inspection shall be charged. $3.00 per thousand or fraction thereof. $6.00 for the first $2,000.00 plus $2.10 for each additional thousand or fraction thereof, to and including $15,000.00. $33.30 for the first $15,000.00 plus $1.50 for each additional thousand or fraction thereof, to and including $50,000.00, $85.80 for the first $50,000.00 plus $1.00 for each additional thousand or fraction thereof, to and including $100,000.00. $135.80 for the first $100,000.00 plus $.75 for each additional thousand or fraction thereof, to and including $500,000.00. $435.80 for the first $500,000.00 plus $.50 for each additional thousand or fraction thereof. For the moving of any building or structure, the fee shot l be $50.00.- (c) 50.00. (c) Demolition of Building or Structures For the demolition of any building or structure, the fee shall be $15.00. (d) Where work for which a permit is required by this Code is started or proceeded with prior to obtaining said permit, the fees herein specified shall be doubled, but the pay- ment of such double fee shall not relieve any persons from fully complying with the re- quirements of this Code in the execution of the work nor form any other penalties pres- cribed herein. (e) Plan -Checking Fees 09 When the valuation of the proposed construction exceeds $1,000.00 and a plan is required to be submitted by Section105.3, a plan -checking fee shall be paid to the Building Official at the time of submitting plans and specifications for checking. Said plan -checking fee shall be equal to one-half of the building permit fee as set forthin Section 107.4. Part II Schedule for Plumbing Permit Fees For issuing each permit In addition For each Plumbing Fixture, Floor Drain or Trap (including Water & Drainage Piping) For Each House Sewer For Each Building Sewer Replaced or Repaired For Each Septic Tank and Seepage Pit or Drain Field For Each Water Heater and/or Vent Gas Piping System 1-4 outlets Each Additional outlet For Installation., Alteration or Repair of Water Piping System For Installation, Alteration or Repair of Water Treating Equipment Cr For Repair or Alteration of Drainage or Vent Piping For Vacuum Breaker, etc (1-5) Each Additional Part I II Schedule for Mechanical Permit Fees For issuing each permit First $1,000.00 valuation Each additional $1,000.00 or fraction thereof Part IV Schedule for Electrical Permit Fees Electrical Permit Fees Service Equipment Single Phase Three Phase Sub Panel (10) Sub Panel (30) Dwelling Units Receptacles Swi tches Light Fixtures Commercial Buildings Receptacles Swi tches Light Fixtures Sign Rough $5.00 1.25 2.00 2.00 2.00 1.25 1.50 .50 1.25 2.00 1.25 1.00 .20 $5.00 10.00 2.00 Wiring Method Copper Aluminum 2.00 2.00 3.00 3.00 1.50 1.50 2.00 2.00 .15 .30 .15 .30 .15 .30 .25 .50 .25 .50 .25 .50 .20 .50 Mechanical Equipment Copper Aluminum Resistant Duct Heater per 5 kw .50 .50 Motor and Control per HP 1.00 1.00 (1200 BTU = 1 HP) Water Heater per 5kw .35 .70 Special Appliance or Equipment .35 .70 Construction Power Temporary Power Pole 1.25 1.25 P ermanent Construction Service 1.00 1.00 (Loop Inspection) Issuing Fee 3.00 3.00 Part V Swimming Po7Permit Fees For each swimming pool: Public Pool Private Pool $40.00 $25.00 Part VI Re -Inspection Fees Where Contractor requests an inspection and the job fails inspection, a re -inspection Fee of $5.00 is authorized. PASSED AND APPROVED on the first reading this the 10th day of January, 1978. PASSED AND APPROVED on the second reading this the 14th day of February, 1978. ATTEST: City Secretary G_ J hn C. Doerfler, fAayor