Loading...
HomeMy WebLinkAbout05 - Community Owned UtilitiesCommunity Owned Utilities Community Owned Utilities Division consists of Administration, Customer Service (Meter Readers), Energy Services (Electric), Pump Maintenance, Transportation Services (Streets and Stormwater Drainage), Systems Engineering, Water Services (Wastewater Collection, Water Distribution and Wastewater and Water Treatment). This division constructs, maintains, and operates the City's utility infrastructure. The Division also coordinates contracts with the private sector. Division Financial Summary: Administration Customer Service Electric Electric Contracts Pump Maintenance Stormwater Drainage Streets Systems Engineering Water Distribution Water Treatment Facilities Water Contracts Wastewater Collection Wastewater Treatment Facilities Wastewater Contracts 94/95 Art„ai 253,419 122,274 728,338 9,365,303 298,936 208,855 568,244 136,783 458,978 501,350 1,045,436 296,080 457,324 508,340 95/96 Budget 299,887 123,289 739,038 10,700,645 346,046 276,759 666,192 190,564 497,546 554,034 1,203,002 315,618 557,788 700,402 TOTAL 14,949,660 17,170,810 Percent change of 96/97 Adopted from 95/96 Projected Actual " Percent change of 97/98 Projected Base from 96/97 Adopted Source of Funding: Electric Fund General Fund Joint Services Fund Special Revenue Fund Stormwater Drainage Fund Wastewater Fund Water Fund TOTAL 95/96 Projected Actual 292,994 122,779 735,945 10,700,645 320,376 275,789 653,692 179,310 495,919 554,034 1,194,822 304,893 557,788 7rn dr1� 17,089,388 95/96 94/95 95/96 Projected Actual Budget Actual 10,093,641 11,439,683 11,436,590 568,244 666,192 653,692 811,412 959,786 915,459 0 0 0 208,855 276,759 275,789 1,261.744 1,573,808 1,563,083 2,005,764 2,254,582 2,244,775 14,949,660 17,170,810 17,089,388 Percent change of 96/97 Adopted from 95/96 Projected Actual •• Percent change of 97/98 Projected Base from 96/97 Adopted 97/98 Projected Base (% Change '•) 269,372 133,418 937,891 11,795,099 343,267 278,120 862,329 171,290 525,623 704,054 1,524,414 347,693 695,720 870,402 19,458,692 (-7.8%) (0.0%) (1.3%) (3.7%) (0.0%) (-2.3%) (-0.8%) (0.0%) (0.0%) (5.8%) (-17.4%) (-3.4%) (5.7%) (-42.4%) (-2.5%) 97/98 Projected Base (% Change ") 12,732,990 (3.5%) 0 (N/A) 917,347 (-2.4%) 862,329 (-0.8%) 278,120 (-2.3%) 1,913,815 (-24.4%) 2,754,091 (-9.3%) 19,458,692 (-2.5%) COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1996/97 71 Ends & Means Economic Development Policy End 1.0. Georgetown's economy is self-sustaining through diversified growth, a broad tax base with minimal impact from economic fluctuation, enhanced business opportunity and job creation. Focus End 1.1. Existing undeveloped sites in Georgetown are put to beneficial use. Focus End 1.2. Georgetown recruits small to mid-sized commercial/industrial firms from all areas of the production process (i.e., research and development, assembly, production, distribution, warehousing, and retailing). Means (96-98) Provide utility data base loading information -to -the -Information Resources Division of the Geographic Information System (IMAGE). (All Departments) Education Policy End 2.0. Diverse and comprehensive educational opportunities are available through public and private cooperative efforts. Means (96-01) Promote Public Power through the distribution of educational book covers, signs and posters to local schools during Public Power Week. (Energy Services) Means (96-01) Promote a community -wide program for National "Water Week". (Pump Maintenance, Water Services) Means (96-01) Establish utility information booths at various local festivals. (Administration, Energy Services, Pump Maintenance, Water Services) Means (96-01) Promote safety awareness of high voltage lines through continued use of arcing demonstrations at Georgetown schools. (Energy Services) Environmental & Resource Conservation Policy End 3.0. The physical qualities that make Georgetown attractive are protected. Focus End 3.1. Georgetown's water resources system provides a sufficient water supply of high quality to meet future City needs, to meet economic development and recreational requirements, and to conserve wildlife. Means (96-01) Coordinate with the Fire Prevention department to enforce the City's weed ordinance. (Transportation Services) Means (96-01) Obtain the American Public Power Association's (APPA) Golden Tree Award and enhance the City's landscape. (Energy Services) COMMUNITY OWNED UTILITIES 72 ANNUAL OPERATING PLAN ELEMENT 1996/97 Means (96-97) Work with the Development Services Division to implement a Water Resource Management Plan to reduce peak water demands, through public education and incentives, and encourage practice of good conservation methods. (Administration, Water Services) Means (96-01) Explore the use of alternative water sources to irrigate City parks. (Pump Maintenance, Water Services) Means (96-01) Maximize ground water well production from all well fields. (Water Services) Means (96-97) Identify long-term water needs and obtain additional water rights from the Brazos River Authority. (Administration) Means (96-01) Plan for and establish a wastewater system in Serenada Subdivision. (Water Services) Means (96-97) Acquire wastewater treatment plant permit for Pecan Branch Wastewater Treatment Plant. (Water Services) Means (96-01) Construct wastewater facilities into the Williams Drive area north of Briarwood. (Water Services) Facilities & Services Policy End 4.0. The City provides for the safety of its citizens and supports the responsive delivery of coordinated services by the City and other public agencies. Means (96-97) Coordinate and implement the redesigned development review and approval process. (Administration, Systems Engineering) Focus End 4.1. The City centralizes and co -locates services on existing City -owned property whenever possible. Means (96-01) Construct satellite staging areas for crews. (Transportation Services, Water Services, Energy Services) Focus End 4.6. The City meets the needs of internal and external customers through innovative acquisition and use of information resources. Means (96-01) Review potential broadband services as an on-going strategy to maintain competitiveness in a deregulated electric market. (Administration, Energy Services) Means (96-98) Support Development Services and Information Resources divisions in preparing and implementing a comprehensive strategy to address the Geographic Information System (GIS) needs of the City. (Administration, Systems Engineering, Energy Services) Focus End 4.7. There is trust and harmony between the City's public safety providers and all segments of the community. COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1996/97 73 Means (96-01) Assist the Building Official and Fire Marshal in enforcing city codes by reporting suspected violations and providing direct assistance in their efforts to correct code violations. (All Departments) Focus End 4.9. Georgetown's fire protection is adequate and equitable throughout the City. Means (96-01) Maintain flow-related, color -coded paint on fire hydrants to improve fire fighting ability throughout the service area. (Water Services) Focus End 4.10. Georgetown is prepared to respond to large scale natural and technological emergencies. Means (96-97) Maintain the Incident Command System for emergency procedures. (Administration, Customer Service, Energy Services, Pump Maintenance, Water Services) Means (96-01) Review and revise divisional responsibility requirements contained in the Emergency Operations Plan. (Administration) Finance Policy End 5.0. All municipal operations are conducted in an efficient business -like manner and sufficient financial resources for both short-term and long-term needs are provided. Focus End 5.1. Each utility system is a self -supported operation that provides a desirable and affordable level of service. Focus End 5.5. The City has a method for funding street and street scape improvements. Means (96-01) Utilize a preventative maintenance program to minimize the need for long term capital expenditures. (Administration, Energy Services, Pump Maintenance, Water Services) Means (96-01) Maintain five year capital improvements program to plan long-term financing for infrastructure improvements. (Administration, Energy Services, Transportation Services, Water Services) Means (96-97) Maintain, with the Development Services Division, amended capital recovery fees calculations for financing of system capital improvements. (Administration) Governmental Affairs Policy End 6.0 A high level of cooperation and involvement exists among Georgetown's citizens and governmental organizations. Means (96-01) Maintain positive working relationships with the Texas Natural Resources Conservation Commission and Texas Department of Transportation. (Administration, Systems Engineering, Transportation Services, Water Services) COMMUNITY OWNED UTILITIES 74 ANNUAL OPERATING PLAN ELEMENT 1996/97 Focus End 6.2. The City develops and coordinates service delivery policies with Williamson County, the Georgetown Independent School District and other organizations that provide services to Georgetown. Focus End 6.3. The City is a strong and visible participant in developing comprehensive solutions to issues of concern on a regional level. Means (96-01) Cooperate and coordinate with the Williamson County Unified Road District to provide an organized transportation roadway system. (Administration, Systems Engineering, Transportation Services) Historic Preservation Policy End 9.0. Prehistoric, historic, and cultural resources are preserved, protected and promoted. Means (96-01) Promote the use of visually non -intrusive design, repairs and signage in historic areas of Georgetown. (Energy Services, Transportation Services) Housing Policy End 10.0. The City cooperates with builders, developers and property owners to provide safe and adequate housing opportunities for all citizens. Means (96-01) Promote LCRA's Cooling Efficiency Program by qualifying 36 homes per year. (Energy Services) Means (96-01) Promote LCRA's Good Cents Program by qualifying 450 homes per year. (Energy Services) Recreation & Cultural Affairs Policy End 11.0. All citizens actively participate in community -wide social, cultural, and recreational activities. Focus End 11.3 Georgetown has an attractive and coordinated system of hike and bike trails. Means (96-97) Assist the Parks and Recreation Division in the construction of the River Corridor hike and bike trails. (All Departments) Transportation Policy End 12.0. Georgetown's transportation system provides for the safe and efficient movement of traffic, promotes the economic interests of the community, and adequately serves the personal needs of individuals. Means (96-97) Construct 21st Street, 22nd Street, Northwest Blvd., Leander Street and Railroad Street. (Systems Engineering, Transportation Services) COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1996/97 75 Means (96-97) Complete the following: (Systems Engineering, Transportation Services) • Construct Northwest Boulevard from Benold Middle School to Serenada Drive. • Widen Lakeway Drive from Williams Drive to Northwest Boulevard. • Widen San Jose Street at 22nd Street. • Re -construct 15th Street from Hutto Road to Church Street • Extend Rockmoor Drive to Interstate Highway 35 frontage road. • Widen and realign intersection of San Jose Street and Holly Street at the traffic island. Focus End 12.1. The City maintains a Transportation Functional Plan that includes all modes of transportation. Means (96-01) Establish database information for an Urban Roadway Management System. (Transportation Services) Means (96-97) In cooperation with the Development Services Division, prepare a more detailed transportation strategy to upgrade the local roadway system and reduce traffic congestion. (Administration, Systems Engineering, Transportation Services) Focus End 12.2. The City supports an area -wide transportation effort through coordination with other public and private organizations. Means (96-98) Complete state construction projects including the Leander Road (FM 2243) extension to FM 1460 and Spring Street and Valley, Highway 29 widening and River Oaks Shopping Center connection. (Administration, Energy Services, Transportation Services, Water Services) Focus End 12.3. The City has sidewalks and crosswalks throughout the City, especially around and between schools and parks. Means (96-01) Maintain marked pedestrian crossings in coordination with the Texas Department of Transportation and schools. (Transportation Services) Means (96-01) Develop and maintain urban design standards for sidewalks. (Transportation Services) Utilities / Energy Policy End 14.0. Georgetown's utility systems provide safe and reliable service which meets the needs of all citizens and promotes the economic health of the community. Means (96-01) Develop a partnership with Williamson County Cablevision to acquire channels dedicated for service delivery use. (Administration, Energy Services) Focus End 14.1. Customers of the City's electric utility have a range of choices with respect to rates, service levels and power supply options. Means (96-01) Assist internal departments in the development, implementation, and operation of a load management system for peak analysis and prediction of energy/water loads. (Administration, Energy Services) COMMUNITY OWNED UTILITIES 76 ANNUAL OPERATING PLAN ELEMENT 1996/97 Means (96-01) Maintain power factor above 92% by implementing Milsoft Electric System model. (Energy Services) Means (96-99) Work with Information Services to install the Customer Choice & Control System. (Administration, Customer Service, Energy Services, Water Services) Means (96-97) Work with Pedernales Electric Cooperative (PEC) to obtain the remainder of the Sun City, Georgetown electric service area. (Administration) Focus End 14.2. Water and wastewater services exceed state and federal standards and are provided to all certified areas. Means (96-01) Improve wastewater lines to reduce inflow and infiltration. (Pump Maintenance, Water Services) Means (96-01) Maintain wastewater lines, through scheduled flushing and video inspection of mains, and upkeep of inverted syphons. (Pump Maintenance, Water Services) Means (96-97) Work with other water suppliers to ensure a Regional Water Supply System with the City of Round Rock and the Jonah Special Utility District. (Administration, Water Services) Focus End 14.3. The stormwater drainage system efficiently and effectively protects the health and safety of Georgetown's residents and minimizes the negative effects of standing water and urban runoff. Means (96-97) Reduce stormwater runoff impact on the San Gabriel River by constructing detention and retention ponds and filter beds, installing and replacing curbs and gutters in the Old Town area, and updating the stormwater drainage system on Dunman Drive and in the Railroad Street and Leander Street areas. (Transportation Services, Water Services) COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1996/97 77 This page intentionally left blank. COMMUNITY OWNED UTILITIES 78 ANNUAL OPERATING PLAN ELEMENT 1996/97 ADMINISTRATION CITY OF GEORGETOWN Founded in 1848 Administration LTY1IT- LI ver -301-3 The Community Owned Utilities Administration Department manages financial operations and personnel services supplied by the departments within the division including: Customer Service, Systems Engineering, Energy Services (Electric), Stormwater Drainage, Streets, Wastewater Collection, and Water Distribution. The Department also handles customer relations, reception, record keeping, and secretarial support for the entire division. The Administration Department also participates with the Safety Manager to provide safety training workshops. Administration is responsible for coordination and operation of the Utilities Annex that is needed for Emergency Management situations. How to Reach Us: The Community Owned Utilities offices are located at 1101 North College. Hours are from 8:00 a.m. to 5:00 p.m. Monday through Friday, excluding holidays. Staff may be contacted by phone at 512/930-3555 or by fax at 512/930-3509. After hour emergency calls may be made to 512/930-3532. What We Accomplished in 1995196: • Began permitting process to build the Pecan Branch Wastewater Treatment Plant to provide wastewater services for Sun City. • In cooperation with Jonah Water Supply, revised the Water Certificate of Convenience & Necessity (CCN) to include a portion of the Jonah Water Supply service area, including Katy Crossing. • Bid, awarded, and initiated the Customer Choice & Control (CCC) contract and program. • Developed a division calendar to more closely coordinate projects/schedules. • Coordinated contract and financing of the Indian Mound Subdivision water line construction. • Provided input to the Development Process Redesign Team relating to construction procedures, costs, and customer friendly process. • Participated in an organizational management evaluation process. What We Plan to Accomplish in 1996/97 (Significant Means): • Implement the automated meter reading and SCADA phase of the Customer Choice & Control (CCC). • Develop a Transportation Master Plan for the City. • Complete the permitting process for the Pecan Branch Wastewater Treatment Plant. • Reorganize support staff structure to more efficiently provide administrative support for all departments. COMMUNITY OWNED UTILITIES 80 ANNUAL OPERATING PLAN ELEMENT 1996197 o Hire a Secretary/Receptionist to handle incoming customers and phone calls and to perform routine tasks associated with administrative support. • Upgrade/reclassify one employee, and train to perform administrative functions, in order to streamline office processes and enhance division support. o Provide cross -training for all administrative support staff to increase division productivity. o Coordinate the location and development of utility satellite staging areas in strategic areas of the City. The staging areas will allow stocking of materials and supplies in various areas of the City and thereby reduce man-hours used in traveling to the main warehouse. 1996/97 Adopted Budget and 1997/98 Projected Budget: Employees: full time / part time ' Percent change of 96/97 Adopted from 95/96 Projected Actual Percent change of 97/98 Projected Base from 96/97 Adopted 400 300 N V C l9 7 200 O t F- 100 100 0 ® 94/95 Actual ® 95/96 Projected Actual ® 96/97 Adopted ® 97/98 Projected Base 97/98 Projected Base (% Change ") 5/0 182,703 (o.o%) 86,669 (-M3%) 0 (-100.0%) 269,372 (a.a%) Source of Revenues: Community Owned Utilities Administration Department is funded from the Joint Services Fund. COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1996/97 81 95196 94/95 95196 Projected Actual Budget Actual 5/0 5/0 5/0 173,068 199,962 199,069 80,351 95,925 89,925 0 4,000 4,000 253,419 299,887 292,994 Employees: full time / part time ' Percent change of 96/97 Adopted from 95/96 Projected Actual Percent change of 97/98 Projected Base from 96/97 Adopted 400 300 N V C l9 7 200 O t F- 100 100 0 ® 94/95 Actual ® 95/96 Projected Actual ® 96/97 Adopted ® 97/98 Projected Base 97/98 Projected Base (% Change ") 5/0 182,703 (o.o%) 86,669 (-M3%) 0 (-100.0%) 269,372 (a.a%) Source of Revenues: Community Owned Utilities Administration Department is funded from the Joint Services Fund. COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1996/97 81 Other Comments: Increasing emphasis on environmental issues has created the need to keep abreast of changing regulations. Wastewater regulation is now moving toward control of Non -Point Source Pollution contained in stormwater runoff. Changes in State and Federal regulations, along with expanded service areas, will continue to force cost of service delivery upward. Management control and innovative operational methods must be implemented in order to keep future utility costs within a reasonable range. Beginning in 1996/97, the Energy Services Manager will be moved to the Electric department. COMMUNITY OWNED UTILITIES 82 ANNUAL OPERATING PLAN ELEMENT 1996/97 CUSTOMER SERVICE CITY OF GEORGETOWN Founded in 1848 Customer Service What We Do: The Customer Service Department provides timely and accurate readings of all city -owned utility meters each month. The staff record readings on hand-held, pre-programmed computers. Customer Service also carries out all work orders requiring connection of new accounts, disconnection of discontinued accounts, and cut-offs due to non-payment. Customer Service monitors and tests the functioning of meters and looks for abuse or theft of services by customers. The Customer Service field representatives handle customer complaints about their utility service and check for leaks. In addition, the field representatives watch for safety hazards in the field, (i.e., low hanging electric lines, etc.) and report unknown meters as they are discovered. The Customer Service Department, in conjunction with the Safety Manager, provides safety training workshops. How to Reach Us: Customer Service is located in the Municipal Building at 113 East Eighth Street. Hours are from 8:00 a.m. to 5:00 p.m. Monday through Friday, excluding holidays. Staff may be contacted by phone at 512/930-3555. After hour emergency service calls may be made to 512/930-3532. What We Accomplished in 1995/96: • Began review process to convert unmetered City water lines to metered water lines. • Provided customer service training to meter reader staff. What We Plan to Accomplish in 1996/97 (Significant Means): • Assist with the installation of a City-wide automated meter reading system and implementation of the "remote read" style water and electric meters. • Incorporate Sun City into Georgetown's utilities service meter reading routes and billing cycles. • Continue process of converting unmetered City water lines to metered water lines, by identifying "free" lines and installing water meters to reduce the City's water losses. COMMUNITY OWNED UTILITIES 84 ANNUAL OPERATING PLAN ELEMENT 1996/97 1996/97 Adopted Budget and 1997/98 Projected Budget: 94/95 Actual 4/0 95,671 26,603 0 95/96 Budget 4/0 98,391 24,898 0 95/96 Projected Actual 4/0 98,011 24,768 0 122,274 123,289 122,779 Employees: full time / part time Percent change of 96/97 Adopted from 95/96 Projected Actual " Percent change of 97/98 Projected Base from 96/97 Adopted 150 y c 100 0 ® 94/95 Actual ® 95/96 Projected Actual ® 96/97 Adopted ® 97/98 Projected Base 97/98 Projected Base (% Change ") 4/0 104,119 (o.o%) 29,299 (o.o%) 0 (N/A) 133,418 (o.o%) Source of Revenues: The Customer Service Department is funded from the Joint Services Fund. COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 9996/97 85 86 This page intentionally left blank. COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1996/97 ENERGY SERVICES Electric CITY OF GEORGETOWN Founded in 1848 Electric What We Do: The Electric Department constructs and maintains a complete system of electric conductors, switches, lines and transformers used for the distribution of electricity purchased wholesale from the Lower Colorado River Authority (LCRA). In addition, the Electric Department reviews plans for construction of new lines (overhead and underground), and develops design specifications that meet all safety and construction requirements. The Electric Department installs and maintains street lights. The department administers a tree trimming maintenance program to prevent damage to electric distribution equipment and lines. To heighten residential and commercial customers' awareness of energy, load management and safety; the department conducts educational programs. The Electric Department staff researches alternate energy sources and methods of reducing peak demand through load management. This department also includes Conservation/Load Management which develops, coordinates, implements, markets, and directs City electric conservation and load management (CLM) programs. Conservation/Load Management, as primary contact for customers, provides an interface for the City, its customers, and the Lower Colorado River Authority (LCRA). The Conservation/Load Manager operates the load management system (SCADA) for peak analysis and prediction of electric load. The Electric Department participates with the Safety Manager to provide safety training workshops. How to Reach Us: The Electric Department is located in the Community Owned Utilities complex at 1101 North College. Hours are from 8:00 a.m. to 5:00 p.m. Monday through Friday, excluding holidays. Staff may be reached by phone at 512/930-3555. After hour emergency service calls may be made to 512/930-3532. What We Accomplished in 1995/96: • Constructed new three-phase circuit, along Shell Spur, for the Sun City Lift Station project. • Reinsulated 795 three-phase circuit and converted the primary voltage from 7.2 KV to 14.4 KV, and built a 24 KV line along F.M. 2338 to provide electrical service for Sun City. • Installed two (2) new breaker bays at San Gabriel Substation to increase electrical capacity in the western part of Georgetown. • Added an additional breaker bay at the Chief Brady Substation for commercial growth in the southern area of town. • Installed electric service to. Crystal Knoll to provide for residential growth. • Promoted LCRA's Improved Home Program by qualifying 40 homes. • Promoted LCRA's Good Cents Program by qualifying 402 homes. • Actively participated in the City's Development Process Redesign Team. COMMUNITY OWNED UTILITIES 88 ANNUAL OPERATING PLAN ELEMENT 1996/97 J What We Plan to Accomplish in 1996/97 (Significant Means): • Upgrade facilities in the Northwest Quadrant of the service area to provide for increased efficiency. • Reinsulate GB -20 three-phase circuit and convert the primary voltage from 7.2 KV to 14.4 KV from San Gabriel Substation to Serenada to serve the area more reliably and efficiently by: • Replacing approximately 242 7.2 KV distribution secondary transformers with 14.4 KV distribution transformers. • Reinsulating 12.0 miles of single phase, 7.2/12.5 KV line to 14.4/24.9 KV capacity on GB -30 circuit north of Lakeway. • Promote LCRA's Improved Home Program by qualifying 40 homes. • Promote LCRA's Good Cents Program by qualifying 450 homes. • Install a peaking generator in order to provide 1.5 MW of generation for system load management during high usage periods, therefore reducing purchased power costs and enabling us to gain long- term electric service contracts in a deregulated energy market. • Install underground electric services at Sun City for 600 new residents. • Add a second electric feeder from the Sun City Lift Station to new areas of the Sun City development. 1996/97 Adopted Budget and 1997/98 Projected Budget: 95/96 94/95 95/96 Projected Actual Budget Actual 11/0.25 12/0.25 12/0.25 390,390 461,820 459,027 337,948 275,071 274,771 0 2,147 2,147 728,338 739,038 735,945 Employees: full time / part time Percent change of 96/97 Adopted from 95/96 Projected Actual Percent change of 97/98 Projected Base from 96/97 Adopted 1000 800 N Ca 600 N 7 r 400 H 200 0 ® 94/95 Actual ® 95/96 Projected Actual ® 96/97 Adopted ® 97/98 Projected Base COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1996/97 97/98 Projected Base (% Change ") 16/0.25 613,614 (4.0%) 324,277 (o.o%) 0 (-100.0%) 937,891 (1.3%) 89 Source of Revenues: The Electric Department is funded from the Electric Fund. Other Comments: The Electric Department will add two lineman and one groundsman in January 1997 in order to maintain the rapidly expanding customer base. By September 30, 1996 the City will have over 10,000 electric customers, a 22% increase over the last two years. The department will also transfer the review of new construction lines to the new Development Process Team. The Customer Choice & Control System (CCC) will enable the Electric Department to monitor for the first time, the system's real time performance from the substation level, the feeder level, and the individual customer level. The project is included in the five year Electric CIP schedule on page 319. • The Automatic Meter Reading function will enable several departments to monitor outage detection, load profiles, real time meter reads, customized billing, and time of use rates. • The SCADA (System Control and Data Acquisition) function will enable the Electric Department to monitor system performance in a proactive manner rather than the historically reactive manner. It will enable a more rapid response to trouble areas in this fast growing electric environment. COMMUNITY OWNED UTILITIES 90 ANNUAL OPERATING PLAN ELEMENT 1996/97 Electric Contracts What We Do: The Electric Fund transfers to the General Fund and Streets Special Revenue Fund two percent of its gross billings for utility services. This transfer has been viewed as a payment of franchise fees which would have been payable to the General Fund from a non -City provider of such services. This department also accounts for the contractual obligations not specific to an individual department of the fund, such as purchased power costs paid to the City's wholesale provider. 1996/97 Adopted Budget and 1997/98 Projected Budget: 9,365,303 10,700,645 10,700,645 ` Percent change of 96/97 Adopted from 95/96 Projected Actual Percent change of 97/98 Projected Base from 96/97 Adopted 13 12 v� 11 c 0 10 9 8 7 97/98 Projected Base (% Change ") 141,745 (-26.1%) 95/96 94/95 95/96 Projected Actual Budget Actual 130,000 130,000 130,000 4,588 37,750 37,750 8,214,880 9,320,011 9,320,011 371,975 423,047 423,047 351,813 454,280 454,280 21,799 22,500 22,500 257,309 298,057 298,057 12,939 15,000 15,000 9,365,303 10,700,645 10,700,645 ` Percent change of 96/97 Adopted from 95/96 Projected Actual Percent change of 97/98 Projected Base from 96/97 Adopted 13 12 v� 11 c 0 10 9 8 7 97/98 Projected Base (% Change ") 141,745 (-26.1%) 35,000 (0.0°x) 10,272,227 (5.3%) 711,633 (4.2%) 306,332 (4.9%) 0 (N/A) 306,162 (0.0°x) 22,000 (0.0%) ® 94!95 Actual ® 95/96 Projected Actual ® 96/97 Adopted ® 97/98 Projected Base 11,795,099 (3.7%) COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1996197 91 This page intentionally left blank. COMMUNITY OWNED UTILITIES 92 ANNUAL OPERATING PLAN ELEMENT 1996/97 PUMP MAINTENANCE CITY OF GEORGETOWN Founded in 1848 Pump Maintenance What We Do: The Pump Maintenance Department regularly maintains booster and lift stations; city swimming pool pumps, motors, valves, and chlorine control systems; public water supply wells; and water and wastewater service equipment. The department also performs TV camera work on wastewater lines in the system and repairs jet trucks, system components, and tests and rebuilds meters. The Pump Maintenance Department provides scheduled and unscheduled preventive maintenance of all system facilities, as well as expanded facilities. The Pump Maintenance shop is equipped with a computer system to assist in Operations & Maintenance activities. In addition, the Department assists the Water/Wastewater Departments during peak times. Operators are on-call 24 hours a day to provide emergency assistance for pump maintenance operations._ The Pump Maintenance Department participates with the Safety Manager to provide safety training workshops. The Department also offers tours of facilities and demonstrations to students, instructors, scout troops and other groups to promote safety and conservation awareness. How to Reach Us: Pump Maintenance is located at the Community Owned Utilities complex at 1101 North College. Hours are from 7:30 a.m. to 4:30 p.m. Monday through Friday, excluding holidays. Staff may be contacted by phone at 512/930-3558. After hour emergency service calls may be made to 512/930-3532. What We Accomplished in 1995/96: • Reactivated Wells No. 7 and No. 8 to provide non -potable landscape irrigation for Sun City. • Installed new lift station at River Ridge to improve the quality of wastewater collection in the high growth area. • Installed new 6 -inch suction line for Rabbit Hill Booster Station. • Upgraded and moved River View Lift Station to River Down. • Rebuilt Well No. 5 and Well No. 9. • Installed altitude valve at Rabbit Hill. What We Plan to Accomplish in 1996/97 (Significant Means): • Rebuild Williams Drive Lift Station building. • Conduct wastewater camera inspections of all new transmission lines in the wastewater system. • Rebuild Well No. 2. COMMUNITY OWNED UTILITIES 94 ANNUAL OPERATING PLAN ELEMENT 1996/97 • Install pressure tank at Rabbit Hill. • Install new lift station at Katy Crossing. 1996/97 Adopted Budget and 1997/98 Projected Budget: 400 100 0 ® 94/95 Actual ® 95/96 Projected Actual ® 96/97 Adopted ® 97/98 Projected Base 97/98 Projected Base (% Change ") 7/0.25 210,044 (o.o%) 133,223 (o.o%) 0 (WA) 343,267 (o.o%) Source of Revenues: The Pump Maintenance Department is funded from the Joint Services Fund. Other Comments: Beginning in 1996/97, developers constructing new water and sewer lines will be responsible for the cost of the camera inspection. COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1996/97 95 95/96 94/95 95/96 Projected Actual Budget Actual 7/0.25 7/0.25 7/0.25<Eizplyees 192,847 223,806 207,840ecsnel>€«i 106,089 121,240 112,536 90.00 0 1,000 0apEal> »< »> 298,936 346,046 _320 ,376 Employees: full time / part time ' Percent change of 96197 Adopted from 95/96 Projected Actual " Percent change of 97/98 Projected Base from 96/97 Adopted 400 100 0 ® 94/95 Actual ® 95/96 Projected Actual ® 96/97 Adopted ® 97/98 Projected Base 97/98 Projected Base (% Change ") 7/0.25 210,044 (o.o%) 133,223 (o.o%) 0 (WA) 343,267 (o.o%) Source of Revenues: The Pump Maintenance Department is funded from the Joint Services Fund. Other Comments: Beginning in 1996/97, developers constructing new water and sewer lines will be responsible for the cost of the camera inspection. COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1996/97 95 This page intentionally left blank. COMMUNITY OWNED UTILITIES 96 ANNUAL OPERATING PLAN ELEMENT 9996/97 SYSTEMS ENGINEERING CITY OF GEORGETOWN Founded in 1848 Systems Engineering What We Do: The Systems Engineering Department manages and maintains the system models for division departments: Water, Electric, Stormwater Drainage, Streets and Wastewater. In addition, the Systems Engineering Department provides engineering support for the entire City, customer relations, record keeping, deed files, and maintenance of engineering plan files. The department also provides support to the Georgetown Industrial Foundation in their recruitment of new firms by providing engineering services related to current utility capacity and proposed utilities. The Systems Engineering Department coordinates Capital Improvements Projects (C.I.P.'s) with outside engineering firms, handles easement negotiations and acquisitions. The department also administers contracts for C.I.P.'s. The Systems Engineering Department participates with the Safety Manager to provide safety training workshops. How to Reach Us: The Community Owned Utilities offices are located at 1101 North College. Hours are from 8:00 a.m. to 5:00 p.m. Monday through Friday, excluding holidays. Staff may be contacted by phone at 512/930-3555 or by fax at 512/930-3509. After hour emergency calls may be made to 512/930-3532. What We Accomplished in 1995/96: • Installed the existing Wastewater Model onto the Hydra modeling system. • Installed GeoDesk software to link all systems models into a Windows/AutoCad format, for maintenance and management of utility systems. • Coordinated the design and construction of approximately $1,500,00 in Water and Wastewater Maintenance and Systems Improvement Projects. • Completed City Construction Standard Details for streets, drainage, electric, water and wastewater improvements. • Completed engineering review of over 30 construction projects within the City. • Completed engineering review of over 120 subdivisions, detail development plans, sketch plans, concept plans, preliminary plats and final plats. • Completed a City-wide horizontal and vertical control map, showing 14 key survey control points, location, and descriptions, to reduce the design cost of private and public construction projects. • Installed ColorView computer software to view, plot and draw vector maps onto raster maps and images (i.e., aerial photos). COMMUNITY OWNED UTILITIES 98 ANNUAL OPERATING PLAN ELEMENT 1996/97 • Utilizing our ColorView software, completed installation of a 500 plus acre aerial and topographic map covering the West 22nd Street Drainage Project area and a 900 plus acre aerial and topographic map, covering the Pecan Branch Interceptor, Phase II Route and the proposed Pecan Branch Wastewater Treatment Plant site. ® Participated on the Development Process Redesign Team. ® Coordinated the design and construction of approximately $2,000,000 in Street and Drainage Systems Capital Improvement Projects. What We Plan to Accomplish in 1996/97 (significant Means): • Complete revision of narrative to City Construction Standards and Specifications for street, drainage, electric, water and wastewater improvements. • Assist in the implementation of the redesigned development process. 1996/97 Adopted and 1997/98 Projected Budget: 136,783 190,564 179,310 Employees: full time / part time Percent change of 96/97 Adopted from 95/96 Projected Actual Percent change of 97/98 Projected Base from 96/97 Adopted 250 200 N `m 150 N 7 O F 100 50 0 ®94/95 Actual ®95/9=Proj�ectedActual ®96/97 Adopted ®97/9 97/98 Projected Base (% Change ") 3/0 130,427 (0.0%) 40,863 (0.0%) 0 (N/A. 171,290 (o.o%) COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1996/97 99 95/96 94/95 95/96 Projected Actual Budget Actual 3/0 4/0 4/0 108,926 150,376 139,468 27,857 39,151 38,805 0 1,037 1,037 136,783 190,564 179,310 Employees: full time / part time Percent change of 96/97 Adopted from 95/96 Projected Actual Percent change of 97/98 Projected Base from 96/97 Adopted 250 200 N `m 150 N 7 O F 100 50 0 ®94/95 Actual ®95/9=Proj�ectedActual ®96/97 Adopted ®97/9 97/98 Projected Base (% Change ") 3/0 130,427 (0.0%) 40,863 (0.0%) 0 (N/A. 171,290 (o.o%) COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1996/97 99 Source of Revenues: The Systems Engineering Department is funded from the Joint Services Fund which is comprised of revenues from all funds receiving services. Other Comments: Beginning in 1996/97, the review, approval and inspection of all utility, street, and drainage projects for new developments will be transferred to the Development Process Team. One utility inspector will be transferred to the Inspection Services department in the Development Services division as part of this change. COMMUNITY OWNED UTILITIES 100 ANNUAL OPERATING PLAN ELEMENT 1996/97 TRANSPORTATION SERVICES Stormwater Drainage Streets CITY OF GEORGETOWN Founded in 1848 Stormwater Drainage What We Do: The Stormwater Drainage Utility provides a stable revenue source to meet current and future fiscal demands independent of the General Fund. The utility addresses growing environmental concerns over in -stream water quality, increased regulatory demands in stormwater run-off control, increased infrastructure operation and maintenance costs, and a backlog of drainage/flood control related capital project needs. How to Reach Us: Stormwater Drainage is monitored and directed from the Community Owned Utilities complex located at 1101 -North College. Hours are from 8:00 a.m. to 5:00 p.m. Monday through Friday, excluding holidays. Staff may be contacted by phone at 512/930-3555. What We Accomplished in 1995/96: • Installed approximately 5560 feet of concrete curb in Old Town area to continue the Concrete Curb and Gutter project. This included: • College Street, between 2nd Street and 5th Street and between 16th Street and 19th Street • Ash Street at 17th Street • 13th Street, between Olive Street and Maple Street • 3rd Street, between Business 81 and Rock Street • 14th Street at Hart Street. • Corrected drainage problems on Airport Road by widening the road, and increasing the drainage capacity by installing a larger drainage pipe at Pecan Branch. • Widened College Street from 3rd Street to 4th Street, and added storm drain boxes to correct drainage. • Alleviated drainage problems in the Railroad and Leander Street area by constructing a storm water drainage pipe. • Began safety related bridge repairs on Quail Valley that will be completed in Fall 1996. What We Plan to Accomplish in 1996/97 (Significant Means): • Correct drainage on Dunman Drive. • Initiate a schedule (including costs) to replace all stand-up curbs with curb and gutter, west of Interstate Highway 35 in the Williams Drive area. • Correct drainage on Country Club Road and prevent future pavement failures. COMMUNITY OWNED UTILITIES 102 ANNUAL OPERATING PLAN ELEMENT 1996/97 • Continue installation of approximately 2000 feet (per year) of concrete curb in Old Town area, as needed: • 13th Street from College Street to Ash Street. • 14th Street from Elm Street to College Street. • College Street from 12th Street to 13th Street (includes widening of 12th Street intersection.) • 4th Street from Rock Street to Austin Avenue. • College Street at 19'2 Street. • Walnut Street beginning north of Highway 29. 1996/97 Adopted Budget and 1997/98 Projected Budget: Employees: full time / part time Percent change of 96/97 Adopted from 95/96 Projected Actual " Percent change of 97/98 Projected Base from 96/97 Adopted TI 1 N 200 a c m N 7 O L F- 100 0 ® 94195 Actual ® 95/96 Projected Actual ® 96/97 Adopted ® 97/98 Projected Base 97/98 Projected Base (% Change ") 2/0.5 79,399 (o.o%) 198,721 (-3.2°x) O (WA) 278,120 (-2.3%) Source of Revenues: Stormwater Drainage is funded from the Stormwater Drainage Fund through a $1.25 per residential unit equivalent fee. COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1996/97 103 95196 94/95 95/96 Projected Actual Budget Actual 2/0.5 2/0.5 2/0.5 71,099 85,761 85,693 137,756 190,998 190,096 0 0 0 208,855 276,759 275,789 Employees: full time / part time Percent change of 96/97 Adopted from 95/96 Projected Actual " Percent change of 97/98 Projected Base from 96/97 Adopted TI 1 N 200 a c m N 7 O L F- 100 0 ® 94195 Actual ® 95/96 Projected Actual ® 96/97 Adopted ® 97/98 Projected Base 97/98 Projected Base (% Change ") 2/0.5 79,399 (o.o%) 198,721 (-3.2°x) O (WA) 278,120 (-2.3%) Source of Revenues: Stormwater Drainage is funded from the Stormwater Drainage Fund through a $1.25 per residential unit equivalent fee. COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1996/97 103 Streets What We Do: The Streets Department manages and maintains City streets. The department schedules, coordinates, and performs necessary street repairs and maintenance projects. Work performed is dedicated to the highest quality workmanship at the lowest cost. Extra activities include traffic control, emergency operations, special events, and participation in code enforcement. Daily, the department inspects roadways for sign repair, pavement management, and visible obstructions. The Street Department participates with the Safety Manager to provide safety training workshops. How to Reach Us: The Street Department is located at the Community Owned Utilities Complex at 1101 North College. Staff may be contacted by phone at 512/930-3555. Hours are from 7:30 a.m. to 4:30 p.m. Monday through Friday. After hour call out is available for emergencies by calling 512/930-3532. What We Accomplished in 1995/96: • Seal coated approximately 10 miles of roadway: • Old Town (Northeast quarter) • Leander Road area • North side of the City (West of San Gabriel Blvd.) • Completed overlay of 1 mile of roadway in Old Town area. • Reconstructed roadways: • Seventh and Eight Streets from Church to Main, including brick crosswalks. • 13th Street from Olive Street to Maple Street. • 16th Street at Pine Street. • 20th Street at Ash Street. • 3rd Street at Austin Avenue. • Constructed Dawn Drive from Riverbend Drive to Park Meadow Blvd. • Extended Quail Valley Drive from FM 1460 to Maple Street. • Connected Northwest Blvd. to Lakeway Drive. • Constructed 2,000 feet of sidewalk on Leander Road. What We Plan to Accomplish in 1996/97 (Significant Means): • Complete Street Capital Improvements Projects: • Seal Coat approximately 15 miles of roadway: COMMUNITY OWNED UTILITIES 104 ANNUAL OPERATING PLAN ELEMENT 1996/97 • Streets between Andice Highway and Interstate Highway 35 (bounded by Park Meadow Blvd. and the Golden Oaks Subdivision.) • Streets between F.M. 2243 and University, Scenic to Church • Churchill Farms • Other streets as needed • Install and repair sidewalks in school and park areas. • Overlay two miles of roadway. • Reconstruct Fifteenth Street, from Hutto Road to Church Street. • Reconstruct Country Club Drive from Williams Drive to Gabriel View. • Reconstruct and rehabilitate Airport Road from Lakeway to Vortac. • Extend Rockmoor Drive from Luther Drive to IH 35 Frontage Road. ® Acquire right-of-way for the Leander Road extension. • Construct Northwest Blvd. extension from Lakeway Drive to Serenada Drive. • Widen Lakeway Drive from F.M. 2338 (Williams Drive) to Northwest Blvd. • Reconstruct Haven Lane. • Construct Railroad Street from F.M. 2243 (Leander Road) to Highway 29 (University Avenue). • Widen San Jose Street at 22nd Street and widen and realign intersection of San Jose Street at Holly Street. • Rehabilitate parking lot at 9th Street and Rock. • Complete engineering and site work for the parking lot at 6th Street and Main. COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1996/97 105 1996/97 Adopted Budget and 1997/98 Projected Budget: Employees: full time / part time Percent change of 96/97 Adopted from 95/96 Projected Actual " Percent change of 97/98 Projected Base from 96/97 Adopted 1000 Soo N L m 600 N 7 F 400 200 0 ® 94/95 Actual ® 95/96 Projected Actual ® 96/97 Adopted M97/98 Projected Base 97/98 Projected Base (% Change ") 11/1.25 335,299 (o.o%) 527,030 (-1.3%) 0 (N/A) 862,329 (-o.8%) Source of Revenues: The Street Department is funded from the Streets Special Revenue Fund. Other Comments: As part of the City's commitment to improve roadway expansion, repairs, and maintenance and to also increase financial resources available for transportation, two new items are implemented in 1996/97. (A) The Street Department has been transferred to a special revenue fund with dedicated revenues. These revenues include the 4¢ of property tax revenues (will increase to 5¢ by 1998/99) and franchise fees paid to the City by utility providers for the use of city -owned right-of-way. (B) A two person Rapid Response Team is added to increase customer service and improve efficiency of existing staff. The crew will be responsible for utility patches, pothole repairs, curb and sidewalk repairs, emergency response calls, sealing cracks in roadways, and aiding the maintenance of drainage ditches and detention ponds. These additional staff, working with existing staff in this department will handle all of the smaller maintenance projects, and will prevent the shut- down or delay of larger construction projects such as rehabilitation of streets, curbs and sidewalks. COMMUNITY OWNED UTILITIES 106 ANNUAL OPERATING PLAN ELEMENT 1996/97 95/96 94/95 95/96 Projected Actual Budget Actual 8/1.25 9/1.25 9/1 222,762 277,222 277,124 345,482 388,970 376,568 0 0 0 568,244 666,192 653,692 Employees: full time / part time Percent change of 96/97 Adopted from 95/96 Projected Actual " Percent change of 97/98 Projected Base from 96/97 Adopted 1000 Soo N L m 600 N 7 F 400 200 0 ® 94/95 Actual ® 95/96 Projected Actual ® 96/97 Adopted M97/98 Projected Base 97/98 Projected Base (% Change ") 11/1.25 335,299 (o.o%) 527,030 (-1.3%) 0 (N/A) 862,329 (-o.8%) Source of Revenues: The Street Department is funded from the Streets Special Revenue Fund. Other Comments: As part of the City's commitment to improve roadway expansion, repairs, and maintenance and to also increase financial resources available for transportation, two new items are implemented in 1996/97. (A) The Street Department has been transferred to a special revenue fund with dedicated revenues. These revenues include the 4¢ of property tax revenues (will increase to 5¢ by 1998/99) and franchise fees paid to the City by utility providers for the use of city -owned right-of-way. (B) A two person Rapid Response Team is added to increase customer service and improve efficiency of existing staff. The crew will be responsible for utility patches, pothole repairs, curb and sidewalk repairs, emergency response calls, sealing cracks in roadways, and aiding the maintenance of drainage ditches and detention ponds. These additional staff, working with existing staff in this department will handle all of the smaller maintenance projects, and will prevent the shut- down or delay of larger construction projects such as rehabilitation of streets, curbs and sidewalks. COMMUNITY OWNED UTILITIES 106 ANNUAL OPERATING PLAN ELEMENT 1996/97 Streets Special Revenue Fund What We Do: The Streets Special Revenue Fund (SRF) was created to account for dedicated property tax and franchise fee revenues designated for street improvements and maintenance. These revenues, along with the Streets department, were moved from the General Fund to this SRF beginning in 1996/97. Any funds remaining in this SRF at the end of the year are transferred to the General Capital Projects - Streets fund to aid in financing major street capital projects. Fund Summary: REVENUES Dedicated Property Taxes Franchise Fees - Outside sources Franchise Fees - City Utilities Interest Transfer In- General Fund Total Revenues EXPENDITURES Streets Department Transfers Out, CIP Total Expenditures Excess (Deficiency) of Revenues over Expenditures ..................................... iWis 6rfcal'AnaWsfsff ......................................................... 312,000 (23.3%) 240,620 .............. 508,768 (6.8%) 10,818 (13.9%) 102,123 (-39.4%) 1,174,329 174;468 E i `:' J4A4f4 E ' !: 200 671: 312,000 ... .. .9. ...: ... . ......:.::.....:::.:........................................:::.....:..... .0 .... :::::::::::::6:000: 0 (N/A) :b (WA) "809,464' `':::::x:653;692: 73:819 ......:190.000::......... 190; 000: 642; 063 ::::::::::::: 856,192:::::::::::7:W,692 , Fund Balance at Beginning of Year 00.4T062 Fund Balance at End of Year (1) Shown for comparative purposes only Percent change of 97/98 Adopted from 96/97 Projected Actual Percent change of 97/98 Projected Base from 97/98 Adopted COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1996/97 97/98 Projected Base (% Change —) 312,000 (23.3%) 240,620 (4.6%) 508,768 (6.8%) 10,818 (13.9%) 102,123 (-39.4%) 1,174,329 (4.0%) 862,329 (-o.8%) 312,000 (20.4%) 1,174,329 (4.0%) 0 (N/A) 0 (N/A) O (WA) 107 This page intentionally left blank. COMMUNITY OWNED UTILITIES 108 ANNUAL OPERATING PLAN ELEMENT 1996/97 WATER SERVICES Water Distribution Water Treatment Facilities Water Contracts Wastewater Collection Wastewater Treatment Facilities Wastewater Contracts CITY OF GEORGETOWN Founded in 1848 Water Distribution What We Do: The Water Distribution Department is responsible for routine inspection of water distribution lines, installation of new water taps, setting of water meters, rehabilitation of damaged water lines, replacement of inefficient water meters and fire hydrants, and replacement of non-functional water main valves. In addition, the Department performs water utility locates for other utilities and inspects for proper materials/methods. Staff advise customers when non-City/customers' water problems are discovered. Staff are on-call to respond to emergency problems 24 hours a day. The Water Distribution Department takes routine water samples to test the safety and efficiency of the system. The Department will continue maintaining water system lines and equipment as well as continue recognizing, following, and meeting all Environmental Protection Agency and Safe Drinking Water Act regulations. The Water Department participates with the Safety Manager to provide safety training workshops. How to Reach Us: Water Distribution is located at the Community Owned Utilities complex at 1101 North College. Hours are from 8:00 a.m. to 5:00 p.m. Monday through Friday, excluding holidays. Staff may be contacted by phone at 512/930-3555. After hour emergency service calls may be made to 512/930-3532. What We Accomplished in 1995/96: • Coordinated with the Fire Services Division to repair out -of -service fire hydrants, and raise hydrants that do not comply with State codes throughout the City • Completed Water Capital Improvements Projects: • Constructed a 12 -inch water line on North Business Interstate Highway 35, from Parkview Estates to Industrial Park, with the intent to provide an alternative supply of water to the area. • Completed construction of a 12 -inch water line to connect the Berry Creek Subdivision to the City water system. • Constructed a portion of the 20 -inch water line from Highway 29 to D.B. Wood Road to improve water supply in the area. • Coordinated construction of 6 -inch and 4 -inch water lines to provide City water services to the Indian Mound Subdivision residents (this project was funded by the residents of the Indian Mound Subdivision) COMMUNITY OWNED UTILITIES 110 ANNUAL OPERATING PLAN ELEMENT 1996/97 What We Plan to Accomplish in 1996/97 (Significant Means): U, Coordinate with the Fire Services Division to repair out -of -service hydrants, and raise fire hydrants that do not comply with State codes throughout the City. Complete Water Capital Improvements Projects: • Install a booster pump at Sequoia Spur Booster Station to provide water to Sun City to prevent low pressure problems in the water distribution system. • Construct a portion of the West Loop 20 -inch water line from D.B. Wood Road to Oakcrest to improve water supply in the area and provide transmission routes to other parts of the system. • Implement the Customer Choice & Control (CCC) to save expenses on reading meters and provide better service to customers. • Replace old or damaged water system lines on Austin Avenue, from 12th to 17th Streets, to improve water service in this area. • Expand the water plant at the Lake Georgetown Water Treatment Plant to add 1.5 MGD capacity to conserve funds and to postpone the building of another water treatment plant. • Install SCADA system to improve operation and control of the water distribution system. • Paint exterior of the Southside Water Tank to prevent tank corrosion. 1996/97 Adopted Budget and 1997/98 Projected Budget: 95/96 94/95 95/96 Projected Actual Budget Actual 7/0 7/0 7/0 199,084 213,626 213,393 259,894 283,920 282,526 0 0 0 458,978 497,54& 495,919 Employees: full time / part time Percent change of 96/97 Adopted from 95/96 Projected Actual Percent change of 97/98 Projected Base from 96/97 Adopted 600 400 m N O L 200 /�/� F 0 CM 94/95 Actual ® 95/96 Projected Actual ttm 96/97 Adopted ® 94/95 Projected Base 97/98 Projected Base (% Change "') 7/0 221,346 (o.o%) 304,277 (o.o%) O (WA) 525,623 (0.0%) Source of Revenues: The Water Distribution Department is funded from the Water Fund. COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1996/97 111 Water Treatment Facilities What We Do: The City of Georgetown operates three water treatment plants: the Lake Water Treatment Facility, the San Gabriel Water Treatment Facility, and the Berry Creek Water Treatment Facility. These plants provide high quality water, in compliance with applicable State Laws and Federal standards, to meet the demands of the Georgetown service area. The City of Georgetown contracts for the operations of its water treatment facilities with a private contractor. The City closely monitors the operations and retains ownership of these plants. In 1995, the City Of Georgetown purchased Berry Creek Utilities--The-City is continuing its efforts to maintain and enhance the Berry Creek water system. Currently one-half of the subdivision is connected to the newly constructed 12 -inch water line, while the remainder of the subdivision is connected to the original ground water facility. This arrangement has greatly increased the dependability and supply of the Berry Creek water system, and is in compliance with the dual source provisions of the Texas Natural Resource Conservation Commission. 1996/97 Adopted Budget and 1997/98 Projected Budget: 95/96 94195 95/96 Projected Actual Budget Actual N/A N/A N/A N/A N/A N/A 501,350 554,034 554,034 N/A N/A N/A 501,350 554,034 554.034 Employees: full time / part time Percent change of 96/97 Adopted from 95/96 Projected Actual " Percent change of 97/98 Projected Base from 96/97 Adopted Soo W 600 97/98 Projected Base (% Change ") N/A N/A (NIA) 704,054 (5.8%) N/A (NIA) 704.054 (5.8%) 200 ®94/95 Actual 095/96 Projected Actual ® 96/97 Adopted E097/98 Projected Base COMMUNITY OWNED UTILITIES 112 ANNUAL OPERATING PLAN ELEMENT 1996/97 Water Contracts What We Do: The Water Utility transfers two percent of its gross billings to the General Fund and Street Special Revenue Fund. This transfer is a payment of franchise fees which would have been payable to the General Fund from a non -City provider of such services. This department is also used to account for the contractual obligations not specific to any individual department of the fund. 1996/97 Adopted Budget and 1997/98 Projected Budget: 94/95 136,853 0 185,111 142,734 86,298 448,572 45,868 0 95/96 Budget 246,010 0 191,000 43,065 140,273 525,073 0 0 95/96 Projected Actual 246,010 0 191,000 43,065 139,619 525,073 0 0 1,045,436 1,203,002 1,194,822 Percent change of 96/97 Adopted from 95/96 Projected Actual Percent change of 97/98 Projected Base from 96/97 Adopted 01 1.5 N C O = 1 0.5 0 ® 94195 Actual ® 95/96 Projected Actual ® 96/97 Adopted ® 97/98 Projected Base 97/98 Projected Base (% Change ") 470,483 (-7.8%) 0 (-100.0%) 375,000 (o.o%) 125,000 (o.o%) 150,340 (6.o%) 323,591 (3.2%) 60,000 (o.o%) 0 (-100.0%) 20,000 (o.o%) 1,524,414 (-17.4%) COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1996/97 113 This page intentionally left blank. COMMUNITY OWNED UTILITIES 114 ANNUAL OPERATING PLAN ELEMENT 1996/97 i 1 Wastewater Collection What We Do: The Wastewater Collection Department maintains and rehabilitates the wastewater collection system, through routine inspections of the system facilities for preventive maintenance and restoration of broken or collapsed mains. The Department provides maintenance services including: setting wastewater taps, Gearing sewer chokes, jet cleaning of wastewater lines, camera checks of lines, troubleshooting customer problems and locating City wastewater lines. The Wastewater Collection Department also provides scheduled and unscheduled preventive maintenance and rehabilitation of the utility service area, and performs maintenance of the expanded collection system. The Wastewater Collection Department participates with the Safety Coordinator to provide safety training workshops. How to Reach Us: The Wastewater Collections Department is located at the Community Owned Utilities complex at 1101 North College. Hours are from 8:00 a.m. to 5:00 p.m. Monday through Friday, excluding holidays. Staff may be contacted by phone at 512/930-3555. After hour emergency service calls may be made to 512/930-3532. What We Accomplished in 1995/96: • Wastewater Capital Improvements completed in 1995-1996: Replaced 12 -inch wastewater line with 20 -inch wastewater line at Quail Valley to Maple Street in Phase 1 of the Smith Branch project. Replaced approximately 1,800 feet of 6 -inch deteriorated clay tile wastewater line with 6 -inch PVC wastewater line in the Oakcrest Subdivision. Began easement acquisitions for the Pecan Branch Wastewater Treatment Plant facilities. • Began manhole restoration project using concrete sealer and epoxy. What We Plan to Accomplish in 1996/97 (Significant Means): • Up-size the Hart Street wastewater line to accommodate the increase of flow. • Wastewater Capital Improvements to be completed in 1996-1997: Complete permitting and design of the Pecan Branch Wastewater Treatment Plant to supply wastewater treatment to Sun City. COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1996/97 115 • Implement the Customer Choice & Control System (CCC) for wastewater system management. • Complete engineering and easement acquisition for the Pecan Branch Interceptor, Phase II, to provide continued wastewater capacity in northwest Georgetown. • Complete the Smith Branch Interceptor project to provide upgraded wastewater capacity in southern part of town and reduce inflow/infiltration. • Construct the Pecan Branch Feeder Line to serve North Austin Avenue commercial properties. • Complete the Williams Drive wastewater line from Cedar Breaks Road to Country Club lift station to provide for commercial growth. • Install slipliner into existing Oakcrest wastewater line to improve existing service. • Install SCADA system to improve operations and control of the wastewater collection system. • Complete the San Gabriel River nutrient study being performed by the Brazos River Authority. 1996/97 Adopted Budget and 1997/98 Projected Budget: 95/96 94/95 95/96 Projected Actual Budget Actual 5/1 5/1 5/1 141,342 152,207 152,091 154,738 163,411 152,802 0 0 0 296,080 315,618 304,893 Employees: full time / part time ' Percent change of 96/97 Adopted from 95/96 Projected Actual " Percent change of 97/98 Projected Base from 96/97 Adopted 400 300 a c 0 200 L r 100 0 ® 94/95 Actual ® 95/96 Projected Actual ® 96!97 Adopted ® 97/98 Projected Base 97/98 Projected Base (% Change'*) 5/1 152,653 (o.o%) 195,040 (0.0%) 0 (-X00.0%) 347,693 (-3.4%) Source of Revenues: The Wastewater Collection Department is funded from the Wastewater Fund. COMMUNITY OWNED UTILITIES 116 ANNUAL OPERATING PLAN ELEMENT 1996197 Wastewater Treatment Facilities What We Do: The City of Georgetown operates three wastewater treatment plants: the Dove Springs Wastewater Treatment Facility, the San Gabriel Wastewater Treatment Facility and the Berry Creek Wastewater Treatment Facility (purchased in 1995). These plants treat domestic and industrial effluent according to statutory regulations, and provide environmentally safe disposal of wastewater materials. The City of Georgetown contracts with a private contractor to provide for the operation of the wastewater plants. The private contractor conducts routine wastewater bio -monitoring, nitrogen removal and dechlorination. The City continues to closely monitor and evaluate these operations and retains ownership of the plants. During 1995/96 the City began the permitting process for the Pecan Branch Wastewater Treatment Plant, planned for 1998/99. The permitting process will be completed and construction will commence during 1997/98. This plant will provide additional system capacity and service for Sun City. 1996197 Adopted Budget and 1997198 Projected Budget: Employees: full time / part time Percent change of 96/97 Adopted from 95/96 Projected Actual '* Percent change of 97/98 Projected Base from 96/97 Adopted 800 600 0 400 r 200 0 ®94/95 Actual 99951'96 Projected Actual ®96/97 Adopted ®97/98 Projected Base 97/98 Projected Base (% Change **) N/A N/A (N/A) 695,720 (5.7%) N/A (N/A) 695,720 (5.7%) COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1996/97 117 95/96 94/95 95/96 Projected Actual Budget Actual N/A NIA N/A N/A N/A N/A 457,324 557,788 557,788 N/A N/A N/A 457,324 557,788 557,788 Employees: full time / part time Percent change of 96/97 Adopted from 95/96 Projected Actual '* Percent change of 97/98 Projected Base from 96/97 Adopted 800 600 0 400 r 200 0 ®94/95 Actual 99951'96 Projected Actual ®96/97 Adopted ®97/98 Projected Base 97/98 Projected Base (% Change **) N/A N/A (N/A) 695,720 (5.7%) N/A (N/A) 695,720 (5.7%) COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1996/97 117 Wastewater Contracts What We Do: The Wastewater Utility transfers two percent of its gross billings to the General Fund and Street Special Revenue Fund. This transfer is a payment of franchise fees which would have been payable to the General Fund from a non -City provider of such services. This department is also used to account for the contractual obligations not specific to an individual department of the fund. 1996197 Adopted Budget and 1997/98 Projected Budget: 95/96 94/95 95/96 Projected Actual Budget Actual 90,000 48,000 48,000 52,786 78,503 78,503 89,991 181,858 181,858 250,520 362,041 362,041 0 0 0 25,043 30,000 30,000 508,340 700,402 700,402 ' Percent change of 96/97 Adopted from 95/96 Projected Actual Percent change of 97/98 Projected Base from 96/97 Adopted 2000 1500 500 500 0 ® 94/95 Actual ® 95196 Projected Actual ® 96/97 Adopted ® 97/98 Projected Base 97/98 Projected Base (% Change ") 0 (N/A) 85,702 (6.o%) 365,533 (-9.7%) 398,367 (-1.9%) 0 (-100.0%) 20,800 (o.o%) 870,402 (42.4%) COMMUNITY OWNED UTILITIES 118 ANNUAL OPERATING PLAN ELEMENT 1996/97