Raymond Frias, a city employee for 32 years,
inspects a $1.3 million wastewater project.
COU employee performing annual maintenance
on water valve.
COU employee cleaning a sewer blockage.
Community Owned Utilities
Wastewater
Page 90
COMMUNITY OWNED UTILITIES
The Community Owned Utilities Division consists of Administration, Energy Services (Electric), Pump Maintenance,
Transportation Services (Streets and Stormwater Drainage), Systems Engineering, Water Services (Wastewater
Collection, Water Distribution and Wastewater and Water Treatment). This division constructs, maintains, and
operates the City's utility infrastructure. The Division is responsible to maintain positive working relationships with
outside organizations including, the Texas Natural Resources Conservation Commission and the Texas Department
of Transportation. The Division also coordinates contracts with the private sector.
DIVISION FINANCIAL SUMMARY:
Employees - Full Time Equivalents
17 Electric
7.25 Pump Maintena
3.5 Stormwater Drainage
8 Water Distnbutic
12.75 Streets
5 Administration
7 Wastewater Collection
:ems Engineering
64 Total Employees
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00 63
98199
97/98
98/99
Projected
99/00
00101
Actual
Budget
Actual
Adopted
Projected Base
Administration
301,730
310,235
285,992
311,059
311,059
Electric
984,676
1,062,279
1,062,279
1,146,630
1,146,630
Electric Contracts
12,502,221
13,056,466
13,053,333
13,282,621
13,811,076
Pump Maintenance
328,271
366,732
365,851
382,921
382,921
StormwaterDrainage
296,530
397,731
396,696
434,157
424,497
Streets
934,565
1,046,427
1,004,230
1,116,112
1,116,112
Systems Engineering
167,016
172,529
169,929
199,991
228,976
Water Distribution
502,613
531,498
527,466
643,327
643,327
Water Treatment Facilities
925,057
815,690
815,690
807,266
822,116
Water Contracts
1,320,961
1,392,777
1,392,777
2,233,101
2,150,531
Wastewater Collection
359,690
452,716
444,972
493,438
493,438
Wastewater Treatment Facilities
791,556
739,082
721,332
718,496
938,646
Wastewater Contracts
1,220,516
851,314
850,081
964,947
892,392
TOTAL
20,635,402
21,195,476
21,090,628
22,734,066
23,361,721
Employees - Full Time Equivalents
17 Electric
7.25 Pump Maintena
3.5 Stormwater Drainage
8 Water Distnbutic
12.75 Streets
5 Administration
7 Wastewater Collection
:ems Engineering
64 Total Employees
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00 63
This page intentionally left blank.
761
COMMUNITY OWNED UTILITIES
64 ANNUAL OPERATING PLAN ELEMENT 1999/00
ENDS & MEANS
Economic Development
Policy End 1.00 Citizens of Georgetown experience a stable, self-sustaining economy with expanding job
opportunities.
Focus End 1.06 Financial and non-financial barriers to economic development in the City are removed.
1.06.01 The downtown is economically viable.
Means (97-00) Construct a City parking lot on the Heritage Baptist Church property. (Systems
Zn
Engineering, Transportation Services)
Environmental & Resource Conservation
Policy End 2.00 Georgetown's natural and physical resources are managed so that citizens enjoy the benefits
of economic and social development.
Means (99-04) Work with Parks and Recreation Division to obtain the American Public Power
Association (APPA) Golden Tree Award and enhance the City's landscape. (Energy Services)
Focus End 2.01 Sufficient, high quality water is available to meet the current and future needs of citizens
and businesses in Georgetown. Priority is given to:
1) human consumption
2) businesses
3) recreation
Means (98-03) Develop an irrigation/effluent utility ordinance and reuse policy to expand the use of
effluent water sources to irrigate City parks, open spaces, and area golf courses, and to reduce
removal of water from the Edward's Aquifer. (Administration, Pump Maintenance, Systems
Engineering, Water Services)
Means (99-01) Review, make recommendations to Council and implement program, if appropriate, to
transfer Texas Natural Resource Conservation Commission water quality reviews from the state
to the City. (COU Administration, Systems Engineering, City Manager's Office, Development
Process Team)
Means (99-04) Work with the Brazos River Authority (BRA), Chisholm Trail Special Utility District
(CTSUD) and Jonah Special Utility District on regional water supply planning with the emphasis
on meeting long-term water supply needs. (Administration, Water Services)
Means (99-04) Continue cooperative partnership with CTSUD; including modifying service area
boundaries, selling treated water, providing wastewater services, and extending leases for Lake
Georgetown property. (Administration, Systems Engineering, Water Services)
Means (99-04) Continue cooperative partnership with Jonah Special Utility District on the purchase of
treated water, plant expansion, and wastewater service. (Administration, Water Services)
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00
65
Focus End 2.02 Wildlife is conserved.
Means (99-00) Investigate the mitigation plan alternatives for the proposed listing of the Georgetown
Salamander on the Endangered Species List. (Administration, Systems Engineering,
Transportation Services, Water Services)
Growth. and Physical Development
Policy End 3.00 Citizens, business owners and organizations enjoy the benefits of well-planned land usage in
which conflicting needs are balanced
Means (96-01) Support Development Services and Information Resources divisions in preparing and
implementing a comprehensive strategy to address the Geographic Information System (GIS)
needs of the City, by assisting with the coordination of a GIS task force. (Administration, Energy
Services, Systems Engineering)
Means (97-04) Through comprehensive efforts with Georgetown Independent School District (GISD),
assist in utility and traffic flow issues related to the location of new school sites and provide other
utility and conservation solutions as necessary. (Administration, Energy Services, Systems
Engineering, Transportation Services, Water Services)
Public Information and Education
Policy End 7.00 City owned, sponsored or managed public information and education services enhance the
quality of life of the citizens of Georgetown.
Means (96-04) Promote and provide public education and information regarding utility issues and
programs through:
• The distribution of educational book covers, signs and posters to local schools during
Public Power Week. (Energy Services)
• The promotion of a community -wide program for National "Water Week." (Pump
Maintenance, Water Services)
• The coordination of utility information booths at the Red Poppy Festival, July 4th
celebration, Christmas Stroll, and other local festivals. (All Departments)
• The continued use of safety programs at Georgetown schools which provides
information regarding high voltage lines. (Energy Services)
• The promotion of the Safe Place Program at Georgetown schools to educate students that
assistance is available to them. (All Departments)
• The broadcast of the City's Water Conservation Video to establish public awareness and
compliance with water conservation principles. (Administration, Water Services)
COMMUNITY OWNED UTILITIES
66 ANNUAL OPERATING PLAN ELEMENT 1999/00
r--�
O
0
ED
Ci
C
U
C
U
U
L)
Li
L�
Public Safety
Policy End 8.00 Citizens of Georgetown feel safe and are well protected from crime and disorder, natural
disasters and emergencies.
Means (96-04) Expand the Safe Place Program, with the focus on the Georgetown Project's 40
Developmental Assets for Healthy Communities and Healthy Youth, and provide for the safety
of youth by providing educational programs in area schools, and by expanding training to
employees of other divisions, including Police Services and Development Services. (All
Departments)
Policy End 8.04 Georgetown is prepared to respond to large-scale natural and technological emergencies.
Means (98-00) Provide coordinated, responsive city services through the century date change by
ensuring all city systems are ready and by preparing for possible community needs. (All
Departments)
Recreation & Cultural Affairs
Policy End 9.00 Parks, open space, recreation facilities and services, and social and cultural activities
contribute to an enhanced quality of life for the citizens of Georgetown.
Focus End 9.01 Park facilities meet the leisure needs of citizens while minimizing the negative impact on
adjacent properties. priority is given to:
1) Blue Hole/Imhoff Dam
2) A coordinated system of hike/bike and equestrian trails along the San Gabriel
Rivers and their tributaries
Means (98-00) Assist the Parks & Recreation division to complete the construction of the hike/bike
trail along the North Fork of the San Gabriel River Corridor and the athletic complex. (All
Departments)
Transportation
Policy End 10.00 Citizens and commercial goods move safely and efficiently throughout all parts of the City.
Means (97-00) Complete the following traffic improvements: (Systems Engineering, Transportation
Services)
• Improve traffic for Annie Purl School from Olive to Maple
• Construct a roadway to connect College and Holly Streets
• Reconstruct 7th and 8th Streets, between Maple Street and the IOOF Cemetery
• Improve the traffic island at the intersection of San Jose Street and Holly Street
• Resurface Power Road
• Realign Country Club Road at Williams Drive
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00
67
Means (97-01) Work with Williamson County, Management Services, and Development Services on
the alignment of the following roadways: (All Departments)
• Inner Loop Road
• D.B. Wood Road
• Booty's Road
• Remaining segments of Inner Loop Road
Means (97-01) Work with Williamson County, Management Services, and Development Services on
the construction of the following bridges: (All Departments)
Below the dam at Lake Georgetown
Between State Highway 29 and Williams Drive (including bridge crossings to improve
traffic flow west of IH -35)
Spring Valley Road bridge
Means (97-02) Identify, jointly with Police and Fire Services, traffic flows and emergency vehicle
access to reduce accidents and improve traffic movement. (Systems Engineering, Transportation
Services)
Means (98-00) Engineer and construct an underground storm drain extension and sidewalks to connect
the downtown square to the hike and bike trail at Second Street and Main Street.
(Administration, Stormwater Drainage, Systems Engineering, Transportation Services)
Means (98-01) Arrange early coordination with the Texas Department of Transportation to: (Systems
Engineering, Transportation Services)
• Widen Austin Avenue, from 2nd Street to Williams Drive, including the two bridges
spanning the North and South San Gabriel Rivers
• Widen Williams Drive, from Cedar Breaks Road to Del Webb Boulevard
• Extend Leander Road (FM 2243) to FM 1460 from Austin Avenue
• Install traffic signal at the intersection of Austin Avenue and Highway 971
• Install traffic signal at the intersection of Williams Drive and Shell Road
Means (99-00) Revitalize sidewalks in various parts of the downtown area, and construct new
sidewalk from the Square to Martin Luther King, Jr. Blvd. (Systems Engineering, Transportation
Services)
Means (99-01) Design and construct the Rivery Bridge. (Administration, Systems Engineering,
Transportation Services)
Means (99-02) Establish database information for a Right -of -Way Management System to more
clearly identify maintenance activity. (Systems Engineering, Transportation Services)
Means (99-04) Cooperate and coordinate with the Williamson County Unified Road District to
provide an organized transportation roadway system. (Administration, Systems Engineering,
Transportation Services)
COMMUNITY OWNED UTILITIES
68 ANNUAL OPERATING PLAN ELEMENT 1999/00
�1
D
L
l
L
L
L
L
U
L
L
U
L)
U
L:►
L)
F)
Means
Urban Design
(00-03) Arrange early coordination with the Texas Department of Transportation to: (Systems
Engineering, Transportation Services)
• Widen 0.75 miles on Leander Road west of Georgetown Independent School District
property
• Widen Highway 971 east of Business 35 to FM 1105
• Install traffic signal at Austin Avenue and Morrow Street
• Widen and reverse the direction of entrance/exit ramps on Interstate Highway 35
• Install traffic signal at Inner Loop Road and State Highway 29
• Install traffic signal at Inner Loop Road and FM 1460
Policy End 11.00 Georgetown's citizens and businesses enjoy an attractive community with a unique sense of
place and a positive, identifiable image, at a cost which is consistent with other City social and
economic priorities.
Focus End 11.08 The City is well maintained and citizens enjoy a high standard of community urban
design.
Means (98-02) Work with Legal Services, the Building Standards Commission and Fire Services for
the enforcement of nuisance codes and ordinances through Inspection Services for the removal
of sub -standard structures. (Streets)
Means (99-00) Revise the Code Enforcement process to implement one-stop calling point and provide
more aggressive identification and correction of violations. (COU, Development Services, Fire
Services, Information Resources, Police Services)
Utilities/Energy
Policy End 12.00 City owned, sponsored or managed utilities provide safe, adequate and reliable services to
all customers.
Means (98-00) Provide coordinated, responsive City services through the century date change by
ensuring all City systems are ready and by preparing for possible community needs. (All
Departments)
Means (98-01) Develop requirements, and request proposals to evaluate options, and implement an
integrated financial, human resources and utility customer information system. (Administration,
Energy Services, Finance & Administration, Information Resources, Employee &
Organizational Services)
Means (98-04) Assist in location, design and construction of a new Community Owned Utilities
compound, as identified in the citywide 10 -year plan, to promote efficient and safe city
operations, improve access by citizens, and exemplify urban design standards. (All
Departments)
Means (99-00) Complete map and inventory of the electric system to ensure a Federal Energy
Regulatory Commission (FERC) compliant system. (Energy Services, Systems Engineering)
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00 69
Means (99-01) Establish a partnership with a full service utility distribution provider. (All
Departments, City Manager's Office, Legal Services)
Focus End 12.01 Customers of the City's electric utility have a range of choices with respect to rates,
service levels and power supply options.
Means (96-00) Complete the installation of the Customer Choice & Control System. (Administration,
Energy Services, Water Services)
Means (96-01) Work with Georgetown Independent School District (GISD), Williamson County
Cablevision, and General Telephone (GTE), and the Information Resources Division to develop
a telecommunications infrastructure throughout the City. (Administration, Energy Services)
Means (96-03) Become a BETA test site (in cooperation with C3 Communications) to evaluate
broadband services as an on-going strategy to maintain competitiveness in a deregulated electric
market. (Administration, Energy Services)
Focus End 12.02 City water and wastewater customers in all certified areas receive services which exceed
state and federal standards.
Means (95-01) Obtain a permit for the Pecan Branch Wastewater Treatment Plant and complete
construction of the facility. (Administration, Systems Engineering, Water Services)
Means (96-00) Extend the scope of the Water Resource Management Plan to reduce peak water
demands, through public education and incentives, and to encourage the practice of good
conservation methods. (Administration, Water Services)
Means (96-01) Work with other water suppliers to ensure a Regional Water Supply System with the
City of Round Rock and the Jonah Special Utility District. (Administration, Water Services)
Means (96-04) Plan for and establish wastewater system facilities in the Serenada Subdivision.
(Administration, Systems Engineering, Water Services)
Means (97-02) Expand the wastewater collection system to provide wastewater service opportunities
to residents in the Booty's Road and Cedar Breaks/Williams Drive areas (including: Turtle
Bend and Oakcrest Subdivisions). (Administration, Systems Engineering, Water Services)
Means (98-04) Continue to be active participants to create long-range water supply strategies with the
Lower Colorado River Authority, Brazos River Authority, Trans -Texas and Senate Bill 1.
(Administration, Water Services)
Means (99-03) Work with Development Services to implement and enforce the Cross -Connection
Control Regulations (backflow installation and inspection) for water quality through plumbing
codes and ordinances. (Administration)
COMMUNITY OWNED UTILITIES
70 ANNUAL OPERATING PLAN ELEMENT 1999/00
Focus End 12.03 The City's stormwater drainage system efficiently and effectively protects the health and
safety of Georgetown's residents and minimizes the negative effects of standing water and urban
runoff.
Means (96-01) Reduce stormwater runoff impact on the San Gabriel River by constructing detention
and retention ponds and filter beds, installing and replacing curbs and gutters in the Old Town
area, and construction of drainage facilities. (Systems Engineering, Transportation Services,
Water Services)
• TXDOT Retaining Wall 0 4th and Ash Street
• Smith Branch Clean Out 0 Serenada
• Norwood West a Sierra Vista
• Churchill Farms Ditch Elm Street and 9th Street
• Wagon Wheel/Western Trail
Means (98-00) Create a Drainage Policy and Manual, and formulate a Regional Stormwater
Management Plan consistent with State and Federal guidelines. (Administration, Systems
Engineering, Transportation Services)
Means (99-00) Install a high water alarm system at the Berry Creek low water crossing bridge.
(Systems Engineering)
For an explanation of the Ends & Means, seepages one and two in the City Summary section.
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00
71
WHAT WE DO:
The Community Owned Utilities Administration
Department manages financial operations and
personnel services for all departments in the division.
The Department also provides administrative support,
including customer relations, reception, record
keeping, and secretarial services, to all departments
within the division. Long-term system planning is
coordinated by this department. Administration is
responsible for coordination and operation of Utilities
during Emergency Management situations.
WHAT WE ACCOMPLISHED IN 1998/99:
• Coordinated the input from Community Owned
Utilities into the facilities plan for office space
expansion.
WHAT WE PLAN TO ACCOMPLISH IN 1999/00:
• Implement the second phase of the Integrative
Culture, focusing on training for second level
management.
• Support facility planning and construction
process of a new City Service Center.
• Complete the process of revising and formalizing
internal operating procedures.
• Assisted the Georgetown Independent School
District (GISD) recommending solutions to utility •
conservation efforts, assisted in utility and traffic
flow needs for the new Pat Cooper Elementary
school site, located near Katy Crossing.
• Implemented the emergency outdoor early
warning system for the City in cooperation with
the Fire Services Division.
• Expanded partnership with Drug Awareness
Resistance Education (DARE), the Georgetown
Project, GISD, and the Head Start Program, of the
Safe Place Program with the focus on the 40
Developmental Assets for Healthy Communities
and Healthy Youth.
• Coordinated construction of the Safe Place
childrens' art display in San Gabriel Park, to
permanently display 3,000 tiles.
• Implemented the first phase of Integrative
Culture, through training and regular meetings;
with the focus on managing to the future and
emphasis on human resources.
• Coordinated the City's Mayfair booth.
• Enhanced project management by creating a new
position and adding a Capital Improvement
Project Coordinator to staff.
72
Work with GISD to recommend solutions to
various utility conservation efforts, assist in
solving utility and traffic flow needs, and in
developing school sites for a new middle school,
a new elementary school, and renovation of the
Williams Elementary school.
• Continue support for the Safe Place Program
through screening and training of new employees,
and employees in other divisions in partnership
with DARE, the Georgetown Project, GISD, and
Williamson County.
• Negotiate and successfully implement a
maintenance agreement with C3 Communi-
cations for operation and maintenance of the
fixed wireless network.
• Provide a higher level of coordination with
Williamson County and the Texas Department of
Transportation in planning transportation
projects.
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00
1999/00 ADOPTED BUDGET AND 2000/01 PROJECTED BUDGET:
ACTUAL
ACTUAL
BUDGETED
PROJECTED
PROPOSED
ACTIVITY INDICATORS
FY 96/97
FY 97/98
FY 98/99
FY 98/99
Ey 99/00
1) Work orders completed
12,678
14,472
14,400
14,500
15,000
2) Customer calls processed
33,897
36,457
35,396
46,000
48,000
3) Contracts negotiated
22
36
31
34
36
CITIZEN SURVEY
5) Percentage of citizens
satisfied or better with
reliability of City water
and electric
N/A
94%
80%
92%
92%
6) Percentage of citizens
satisfied or better with cost
of COU:
Electric
N/A
78%
78%
78%
83%
Water
N/A
66%
66%
66%
72%
Wastewater
N/A
68%
68%
68%
70%
1999/00 ADOPTED BUDGET AND 2000/01 PROJECTED BUDGET:
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00
99/00
98/99
97/98 98/99
Projected
Actual Budget
Actual
5/0 5/0
5/0 # Employees
196,817 219,096
216,353 Personnel
104,913 91,139
69,639 Operations
301,730 310,235
285,992
Employees: full time / part time
311,059 (o.o%)
* Percent change of 99/00 Adopted from 98/99 Projected Actual
** Percent change of 00/01 Projected Base from 99/00 Adopted
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00
99/00
00/01
Adopted
Projected Base
(% Change *)
(% Change **)
5/0
5/0
218,414 (1.0%)
218,414 (0.0%)
92,645 (33.0%)
92,645 (0.0%)
311,059 (8.8%)
311,059 (o.o%)
73
WHAT WE DO:
The Electric Department constructs and maintains a
complete system of electric conductors, switches, lines
and transformers used for the distribution of electricity
purchased wholesale from the Lower Colorado River
Authority (LCRA). In addition, the Electric
Department reviews plans for construction of new
lines (overhead and underground), and develops
design specifications that meet all safety and
construction requirements. The Electric Department
installs and maintains street lights. The department
administers a tree trimming maintenance program to
prevent damage to electric distribution equipment and
Ilines. The department promotes public education and
provides information through safety and conservation
programs. This department develops, coordinates,
implements, markets, and directs City electric
Conservation and Load Management (CLM)
programs.
WHAT WE ACCOMPLISHED IN 1998/99:
• Mapped and inventoried one-fourth of the electric
system in order to meet deregulation with a
Federal Energy Regulatory Commission (FERC)
valued system.
• Completed Phase Two of a four year Right of
Way Maintenance (Tree Trimming) schedule to
iiiiprove System reliability.
• Installed additional lighting in San Gabriel Park
and other neighborhood parks to assist Police
Services in reducing crime.
• Completed conductor size upgrade on Gabriel
Substation feeder GB -90 to improve system
reliability and service.
• Installed capacitors on the Georgetown
Substation feeders GT -20 through GT -60 to aid
in maintaining the power factor above 95%.
• Developed and implemented an Electric System
Maintenance Agreement between Southwestern
University and the City of Georgetown.
74
• Worked with Police Services Division, Fire
Services Division, and C3 Communications to
develop and implement a city-wide outdoor early
warning system.
• Worked with Information Resources and C3
Communications to expand the City's internal
fiber optic network.
• Created an Energy Code and incorporated it into
the existing building codes to replace the current
"Good Cents" program.
WHAT WE PLAN TO ACCOMPLISH IN 1999/00:
• Map and inventory remainder of the electric
system in order to meet deregulation with a
Federal Energy Regulatory Commission (FERC)
valued system.
• Install underground electric services for new
residents at Sun City (425), Berry Creek Reserve
(60), Georgetown Village (55), Katy Crossing
(50), and Crystal Knoll (50) Georgian Place (40)
Chisholm Park (45).
• Convert load served from Gabriel Substation
Feeder GB -40 to 25 KV for increased reliability.
Areas included in this conversion are Crystal
Knoll Subdivision, Katy Crossing Subdivision,
and the Industrial Park area.
• Install additional lighting in San Gabriel Park and
other neighborhood parks to assist Police Services
in reducing crime.
• Work with the Georgetown Independent School
District to recommend solutions to various utility
issues and conservation efforts at their existing
and proposed sites.
• Construct tie and feeder line extension from
County Road 151 along the railroad, south to
State Highway 971 to the new Pecan Branch
Wastewater Treatment Plant.
• Continue with Phase Three of the Right of Way
Maintenance Schedule.
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00
ACTUAL ACTUAL BUDGETED PROJECTED PROPOSED
ACTIVITY INDICATORS FY 96/97 FY 97/98 FY 98/99 FY 98/99 FY 00
1) Temporary Power Connections
373
500
591
760*
800*
2) Permanent Power Connections
371
450
492
790*
830*
3) Street Light Repairs
291
260
350
500
550
4) Underground Locates
479
450
500
1,500
2,500
* Includes contract labor work orders not
previously included.
(0.0%)
1999/00 ADOPTED BUDGET AND 2000/01 PROJECTED BUDGET:
SIGNIFICANT CHANGES:
99/00
98/99
97/98 98/99
Projected
Actual Budget
Actual
15.75/0.25 17/0.25
16/0.25 # Employees
596,067 636,829
636,829 Personnel
388,609 411,950
411,950 Operations
0 13,500
13,500 Capital
984,676 1,062,279
1,062,279
Employees: full time / part time
(0.0%)
* Percent change of 99/00 Adopted from 98/99 Projected Actual
** Percent change of 00/01 Projected Base from 99/00 Adopted
SIGNIFICANT CHANGES:
99/00
00/01
Adopted
Projected Base
(% Change *)
(% Change **)
17/0
17/0
736,039 (15.6%)
736,039
(0.0%)
410,591 (-0s°io)
410,591
(0.0%)
0 (-100.0%)
0
(N/A)
1,146,630 (7.9%)
1,146,630
(0.0%)
Underground utility locates have increased dramatically since passage of the Texas Line Locate Bill,"ONE CALL"
on October 1,1998, making it mandatory for anyone who does any digging to call for underground utility locates
before digging. This law pertains not only to the commercial excavation businesses but to all residential digging as
well. The number of requests for locates will increase even more dramatically as the public becomes aware of the law.
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00
75
ELECTRIC CONTRACTS
The Electric Fund transfers to the General Fund and Streets Special Revenue Fund two percent of its gross billings
for utility services. This transfer has been viewed as a payment of franchise fees which would have been payable to
the General Fund from a non -City provider of such services.
This department also accounts for the contractual obligations not specific to an individual department of the fund, such
as purchased power costs paid to the City's wholesale provider. Special Projects and Services includes programs such
as public education, energy and contracts not attributable to the Electric Department. The City maintains 176 miles
of overhead electric distribution lines, 72 miles of underground distribution lines, and has a 100 megawatt capacity.
ACTUAL
ACTUAL
BUDGETED
PROJECTED
PROPOSED
ACTIVITY INDICATORS FY 96/97
FY 97/98
FY 98/99
FY 98/99
FY 00
1) Electric Utility Customers 10,827
11,534
11,800
12,580
13,450
2) mWh sold 233,530 255,190 256,100 275,430 294,478
3) System Load Factor 44% 49% 46% 48% 50%
4) Percent Compliance with
95% Power Factor Goal N/A 100% 93% 100% 100%
1999/00 ADOPTED BUDGET AND 2,000/01 PROJECTED BUDGET:
98/99
99/00
00/01
97/98
98/99
Projected
Adopted
Projected Base
Actual
Budget
Actual
(% Change *)
(% Change **)
0
0
0 CCC Maintenance
100,000
(NIA)
100,000
(0.0%)
10,547,383
11,285,253
11,285,050 Purchased Power
11,597,040
(2.8%)
12,113,640
(4.5%)
815,156
412,581
411,032 Admin Allocations
409,296
(-0.4%)
409,296
(0.0%)
332,132
703,585
702,796 Joint Svc Allocations
703,940
(0. 21/6)
703,940
(0.0%)
352,519
370,042
369,455 Franchise Fees
383,145
(3.7%)
400,000
(4.4%)
455,031
285,005
285,000 Special Projects & Svcs
89,200
(-68.7"x,)
84,200
(-5.6'x,)
12,502,221
13,056,466
13,053,333
13,282,621
(1.8%)
13,811,076
(4.0%)
* Percent change of 99/00 Adopted from 98/99 Projected Actual
** Percent change of 00/01 Projected Base from 99/00 Adopted
COMMUNITY OWNED UTILITIES
76 ANNUAL OPERATING PLAN ELEMENT 1999/00
This page intentionally left blank.
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00
77
WHAT WE D O :
The Pump Maintenance Department maintains booster
and lift stations; city swimming pool pumps, motors,
valves and chlorine control systems; public water
supply wells; water and wastewater service equipment.
The department also performs video camera work on
wastewater lines in the system, and tests and rebuilds
water meters.
The Department provides scheduled preventive
maintenance of all system facilities, as well as
expanded facilities. The Maintenance shop is
equipped with a Supervisory Control and Data
Acquisition system (SCADA) to assist in Operations
& Maintenance activities. The Department shares
workload with the Water/Wastewater Department
during peak times. Operators are on-call 24 hours a
day to provide quality service.
The Pump Maintenance Department participates with
the Safety Manager to provide safety training
workshops. The Department also offers tours of
facilities and demonstrations to students, instructors,
scout troops and other groups to promote safety and
conservation awareness.
WHAT WE ACCOMPLISHED IN 1998/99:
• Replaced pump control valve at Southside
Booster station.
• Rerouted well piping on Wells No. 7 and No. 8 to
flow directly into the Airport storage tank for
non -potable irrigation.
• Rebuilt high service pump No. 1 at Southside
Booster Station.
• Installed odor control system at Sun City &
Interceptor Lift Station.
• Installed a package lift station for the restroom at
Blue Hole.
• Established 24 hour monitoring of the SCADA
system.
78
• Brought Westinghouse Lift Station on line.
• Rebuilt control panels at River Ridge & Katy Lift
Stations to be compatible with the SCADA
system.
• Installed outdoor tornado warning sirens at Berry
Creek and Sun City.
• Evaluated and purchased Pump Maintenance
Software to document repairs and system
maintenance.
WHAT WE PLAN TO ACCOMPLISH IN 1999/00:
• Install increased pumping capacity at Rabbit Hill
Booster station.
• Replace bypass valve at the Southside Booster
station.
• Install and program a computer aided
maintenance package.
• Rebuild high service pump #3 at Southside
Booster Station.
O install transfer switches at major lift stations.
• Install a spare irrigation pump/motor at Sun City
Irrigation Station.
• Continue support for the Safe Place Program
through screening and training of new employees
and employees in other divisions in partnership
with DARE, the Georgetown Project, GISD and
Williamson County.
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00
ACTIVITY INDICATORS
1)
Linear feet of wastewater
PROJECTED
lines inspected by camera
2)
Motor rebuilds & rewinds
3)
Pump rehabilitations
4)
Lift and booster station
130,110 Operations
physical inspections
ACTUAL
ACTUAL
BUDGETED
PROJECTED
PROPOSED
FY 96/97
FY 97/98
FY 98/99
FY 98/99
FY 00
125,190 130,960
130,110 Operations
328,271 366,732
42,240
28,000
28,000
20,000
20,000
19
23
15
20
15
16
25
20
25
25
10,415
9,500
7,000
10,500
11,680
1999/00 ADOPTED BUDGET AND 2000/01 PROJECTED BUDGET:
99/00
98/99
97/98 98/99
Projected
Actual Budget
Actual
7/0.25 7/0.25
7/0.25 # Employees
203,081 235,772
235,741 Personnel
125,190 130,960
130,110 Operations
328,271 366,732
365,851
Employees: full time / part time
* Percent change of 99/00 Adopted from 98/99 Projected Actual
** Percent change of 00/01 Projected Base from 99/00 Adopted
99/00
00/01
Adopted
Projected Base
(% Change *)
(% Change **)
7/0.25
7/0.25
242,285 (2.8%)
242,285 (0.0%)
140,636 (8.10A)
140,636 (o.00io)
382,921 (4.7%)
382,921 (0.0%)
SIGNIFICANT CHANGES:
The decrease in linear feet of wastewater lines inspected by camera is due to a change in policy in 1998, which
requires developers to be responsible for camera inspection of new wastewater lines.
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00
79
A NTAr /•.
The Systems Engineering Department manages and
maintains utility system models for departments within
the Community Owned Utilities Division: including
Water, Electric, Stormwater Drainage, Streets and
Wastewater.
The department provides engineering services related
to grant applications for the Georgetown Industrial
Foundation in their recruitment of new firms. This
department also coordinates and administers Capital
Improvement Projects (C.I.P.'s) with outside
engineering firms, and handles easement and right-of-
way negotiations and acquisitions. Systems
Engineering supports the review of approximately 150
development plans and reviews annually.
WHAT WE ACCOMPLISHED IN 1998/99:
• Acquired digital Right-of-way Management
• Assisted with the application, coordination and
completion of Economic Development and other
grant projects including Texas Electric
Cooperative, the Rivery, Advanced Metals, Don
Hewlett Chevrolet, and Texas Community
Development Program Grant.
• Created and managed the Detailed Development
Plan for the Safe Place Tile Exhibit in San
Gabriel Park.
WHAT WE PLAN TO ACCOMPLISH IN 1999/00:
• Complete revision of the narrative to City
Construction Standards and Specifications for
street, drainage, electric, water and wastewater
improvements.
• Implement a citywide digital transportation
model to better identify C.I.P.'s.
System (RMS), also known as Pavement • Develop a Regional Stormwater Drainage &
Management System (PMS), software for Detention Policy and a City of Georgetown
improved cost-effective maintenance and Stormwater Drainage Manual.
infrastructure inventory.
• Evaluated and implemented a City wide utility
work order system.
• Managed the development of a City wide
Transportation Model to better identify Capital
Improvement Projects.
• Coordinated and managed the construction of
Northwest Boulevard, Country Club Road,
Railroad Street, Downtown Parking Lot, Holly
Street, 7th & 8th Streets, San Gabriel Overlook
Drainage, Gabriel View Drainage, and Thousand
Oaks Drainage Capital Improvement Projects.
• Implement a citywide digital Right-of-way
Management System (RMS) for improved cost-
effective maintenance and inventory of
pavements, curbs, drainage structures,
sidewalks, valves, manholes, signs, trees, water
lines, wastewater lines, power poles, etc.
• Continue maintenance of infrastructure maps
that are tied to true horizontal and vertical
coordinates for future input into a citywide
Geographical Information System (GIS).
• Support the development and implementation of
work teams within the Community Owned
Utilities Division.
• Coordinated and managed the construction of
Williams Drive Wastewater Line, Smith Branch • Participate in the Safe Place Program.
Wastewater Line, Escalera Water line and
Sequoia/Berry Creek Water Line Capital
Improvement Projects.
80
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00
ACTIVITY INDICATORS
1) Information requests
processed
2) Easement/Right-of-
Way Acquisitions
3) Project Management
of Capital Improve-
ment Projects
4) Computer Mapping
modeling, hours
* Improved tracking method.
** Started tracking in November 1997.
ACTUAL ACTUAL BUDGETED PROJECTED PROPOSED
FY 96/97 FY 97/98 FY 98/99 FY 98/99 FY 00
312 1,500* 1,400* 1,900* 2,300
20 30 21 77 44
11 17 30 30 26
$2,925,000 $4,350,000 $4,600,000 $4,600,000 $6,895,000
0** 244** 244** 250** 260
1999/00 ADOPTED AND 2000/01 PROJECTED BUDGET:
Employees: full time / part time
* Percent change of 99/00 Adopted from 98/99 Projected Actual
** Percent change of 00/01 Projected Base from 99/00 Adopted
SIGNIFICANT CHANGES:
The addition of a Chief CIP Construction Field Representative in June 2000 to assist in the inspection of City
construction projects will ensure quality standards for infrastructure projects.
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00
81
98/99
99/00
00/01
97/98
98/99
Projected
Adopted
Projected Base
Actual
Budget
Actual
(% Change *)
(% Change **)
3/0
3/0
3/0 # Employees
3.5/0
4/0
135,377
145,946
145,346 Personnel
168,231 (15.7%)
197,216 (17.2%)
31,639
26,583
24,583 Operations
31,760 (29.2%)
31,760 (0.0%)
167,016
172,529
169,929
199,991 (17.7%)
228,976 (14.5%)
Employees: full time / part time
* Percent change of 99/00 Adopted from 98/99 Projected Actual
** Percent change of 00/01 Projected Base from 99/00 Adopted
SIGNIFICANT CHANGES:
The addition of a Chief CIP Construction Field Representative in June 2000 to assist in the inspection of City
construction projects will ensure quality standards for infrastructure projects.
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00
81
WHAT WE DO:
The Stormwater Drainage Utility addresses
environmental concerns over in -stream water quality,
regulatory demands related to stormwater run-off
controls, infrastructure operation and maintenance, and
drainage/flood control related capital project needs.
Other duties include assisting Police and Fire Services
on Code Enforcement issues.
WHAT WE ACCOMPLISHED IIT 1998/99:
• Installed 2,500 linear feet of curb and gutter on
the north end of College Street and Walnut Street.
• Replaced 3,828 linear feet of curb and gutter on
Power Road in conjunction with the
Transportation overlay project.
• Performed drainage work to relieve flooding in
Berry Creek Subdivision, Section One.
• Alleviated flooding problems on Highview Drive
with curb work and landscaping.
• Installed a drainage flume to correct drainage on
Ridgecrest Drive.
• Corrected drainage issues along Gabriel View
rte_:_...
1111 v c.
• Completed construction for correction of drainage
problems on San Gabriel Overlook.
• Corrected drainage issues on Country Club Road
in conjunction with street rehabilitation.
• Completed West 22nd Street drainage extension
at Georgetown Hospital.
• Corrected drainage at 708 Golden Oaks.
• Cleaned drainage ditches at Wagon
Wheel/Westem Trail to alleviate flooding.
• Installed safety gates at the low water crossing
bridge in San Gabriel Park.
82
• Placed flood gauges at various low water
crossings prone to flooding.
• Corrected flooding on Thousand Oaks by
completing the installation of stormdrains in the
area.
WHAT WE PLAN TO ACCOMPLISH IN 1999/00:
• Install 2,000 linear feet of concrete Curb and
Gutter and 8,000 linear feet of concrete ribbon
curb. This will include the following areas:
• College Street from 2nd Street to the low
water bridge in San Gabriel Park;
• Holly Street from 3rd Street to 7th Street; and
• Walnut Street from 8th Street to 12th Street.
• Correct excessive erosion damage on Norwood
West.
• Replace deteriorated stormdrain at 9th Street and
Elm Street to correct flooding of homes on Elm.
• Develop a regional stormwater detention system.
• Rehabilitate stormwater system along 4th Street
and Ash Street.
• Develop stormwater control measures in
compliance witli the Enviroranentai Protection
Agency Phase II Stormwater Program.
• Install a high water alarm system at the Berry
Creek low water crossing bridge.
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00
^1
l
u
CD
CJ
CD
L)
0
L)
Li
Li
Ll
L,
F)
ACTUAL BUDGETED PROJECTED PROPOSED
FY 97/98 FY 98/99 FY 98/99 FY 99/00
9
ACTUAL
ACTIVITY INDICATORS
FY 96/97
1) Number of storm drains
20.5
cleaned
4
2) Miles of Public Right -of -Way
1,820
mowed and cleaned
20.5
3) Hours of street sweeper
396,696
operation
340
4) Linear feet of curb and gutter
** Percent change of 00/01 Projected Base from 99/00 Adopted
installed/replaced City wide
a. Old Town construction
N/A
b. Other replacement
N/A
c. Annual curb & gutter
installation/construction
3,200
* Curb replacements will not have gutters
- ribbon curb only.
ACTUAL BUDGETED PROJECTED PROPOSED
FY 97/98 FY 98/99 FY 98/99 FY 99/00
9
6
3
6
20.5
20.5
20.5
20.5
1,200
1,820
1,500
1,600
16,800
13,500
13,500
14,000*
1,700
5,000
5,000
0
2,500
2,500
2,500
2,500
1999/00 ADOPTED BUDGET AND 2000/01 PROJECTED BUDGET:
99/00
98/99
97/98 98/99
Projected
Actual Budget
Actual
2.75/0.5 3/0.5
3/0.5 # Employees
84,918 123,245
122,241 Personnel
211,612 274,486
274,455 Operations
296,530 397,731
396,696
Employees: full time / part time
* Percent change of 99/00 Adopted from 98/99 Projected Actual
** Percent change of 00/01 Projected Base from 99/00 Adopted
99/00
00/01
Adopted
Projected Base
(% Change *)
(% Change **)
3/0.5
3/0.5
122,037 (-0.2%)
122,037 (0.0%)
312,120 (13.7%)
302,460 (-3.10/.)
434,157 (9.4%)
424,497 (-2.2%)
SIGNIFICANT CHANGES:
An additional $10,000 is included for Phase II of the Environmental Protection Agency Stormwater Drainage
Compliance Program.
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00
83
LY1I•
The Street Department manages, maintains and repairs
City streets and rights-of-way. Responsibilities include
traffic control, emergency response operations, special
events, and assistance in code enforcement. Daily, the
department inspects roadways for sign repair,
pavement management, and sight obstructions. The
Street Department is a Safe Place Department.
The Street Department participates with the Safety
Manager to provide safety training workshops.
WHAT WE ACCOMPLISHED IN 1998/99:
• Seal coated 4 lane miles on College Street.
• Asphalt overlayed 4 lane miles:
• Maple Street from 7th to 15th;
• Paige, Main and Brushy Streets;
• Railroad Street from 10th to University;
• Martin Luther King, Jr. Street from 10th to
University; and
• Power Road.
• Asphalt microsurfaced 23 lane miles:
• Park View Estates and portions of San
Gabriel Heights and Sierra Vista.
• Remodeled 7th and 8th Streets from Maple to
IOOF cemetery and the downtown area.
• Constructed Holly Street to College Street.
• Built cross streets from Olive to Maple at 16th
and Annie Purl Elementary School.
• Completed a parking lot at 6th and Main.
• Constructed Railroad Street.
• Coordinated with Inspection Services and Fire
Services on code enforcement processes with the
removal of three substandard structures.
• Participated in presentation and expansion of the
Safe Place Program, including construction of the
Safe Place display at the playscape.
84
• Expanded application of brick paver designs on
sidewalk projects.
• Overlayed Inner Loop at Churchill Farms.
WHAT WE PLAN TO ACCOMPLISH IN 1999/00:
• Seal Coat 3 lane miles of roadway in River Hills
Subdivision.
• Asphalt microsurface approximately 23 lane
miles of roadway:
• Reata Trails Subdivision;
• Berry Creek, Section One;
• A portion of San Gabriel Heights;
• Berry Creek, Section One;
• West Old Town area, bound by 2nd Street to
9th Street and Rock Street to Scenic.
• Asphalt overlay approximately 10 lane miles of
roadways.
• Mimosa Street;
• Pecan Street;
• Areas bound by 16th Street to 19th Street and
Hutto Road to Annie Purl School;
• Overlay and level Hutto Road.
• Asphalt overlay and install concrete curb on
College Street between 2nd Street and San
Gabriel Park.
• Construction and Reconstruction Projects:
• D.B. Wood Road to Oakcrest Subdivision;
• Realign Country Club Road/Construct Rivery
Boulevard to Williams Drive;
• Extend Maple Street;
• Sidewalk from the square to the Hike and
Bike Trail at 2nd Street;
• 3,500 linear feet of sidewalk in the
downtown area;
• Reconstruct 13th and 14th Streets between
College and Myrtle.
• Assist in the development of a Transportation
Model in coordination with Systems Engineering.
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00
i
LD
ED
0
ED
0
r �
ACTUAL ACTUAL BUDGETED PROJECTED PROPOSED
ACTIVITY INDICATORS FY 96/97 FY 97/98 FY 98/99 FY 98/99 FY 98/99
1) Lane miles of sealcoat,
1999/00 ADOPTED BUDGET AND 2000/01 PROJECTED BUDGET:
overlay or microsurfacing
20
12
13
20**
43
2)
Square feet of roadway
401,008 Personnel
588,540 591,706
591,650 Operations
5,520 11,600
11,572 Capital
934,565 1,046,427
patching
58,700
35,000
30,000
30,000
30,000
3)
Traffic signs repaired/
installed
140
140
200
200
300
4)
Lane miles of streets
maintained*
N/A
325
335
335
345
CITIZEN SURVEY
5)
Percentage of citizens
satisfied or better with:
a) Safe movement of vehicles
N/A
55%
55%
62%
62%
b) Street layout & traffic flow
N/A
64%
64%
66%
66%
c) Local street maintenance
N/A
77%
77%
80%
80%
d) Sidewalks
N/A
74%
74%
67%
67%
e) Streets & traffic overall
N/A
68%
68%
62%
62%
**Microsurfacing contract extends into 99/00 (23 additional miles by December 1, 1999)
1999/00 ADOPTED BUDGET AND 2000/01 PROJECTED BUDGET:
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00
99/00
98/99
97/98 98/99
Projected
Actual Budget
Actual
11/0.75 12/0.75
11.25/0.75 # Employees
340,505 443,121
401,008 Personnel
588,540 591,706
591,650 Operations
5,520 11,600
11,572 Capital
934,565 1,046,427
1,004,230
Employees: full time / part time
1,116,112 (o.o%)
* Percent change of 99/00 Adopted from 98/99 Projected Actual
** Percent change of 00/01 Projected Base from 99/00 Adopted
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00
99/00
00/01
Adopted
Projected Base
(% Change *)
(% Change **)
12/0.75
12/0.75
457,232 (14.0°/6)
457,232 (o.o%)
658,880 (11.4%)
658,880 (o.o6i6)
0 (-100.06/6)
0 (N/A)
1,116,112 (11.1616)
1,116,112 (o.o%)
85
WHAT WE DO:
The Water Distribution Department is responsible for
routine inspection of water distribution lines;
installation of new water taps and meters;
rehabilitation and replacement of damaged or
inefficient water lines, meters, fire hydrants and valves.
The Department performs water utility locations and
inspections for proper materials/methods. Staff advise
customers of non -City water problems, when
discovered. Staff are on-call to respond to emergency
problems 24 hours a day.
The Water Distribution Department takes routine water
samples to test the safety and efficiency of the system.
The Department will continue to maintain water
system lines and equipment as well as continue to
recognize, follow, and meet all Environmental
Protection Agency and Safe Drinking Water Act
regulations.
The Water Department participates with the Safety
Manager to provide safety training workshops, and
with the Building Inspection Department to ensure
water system protection.
WHAT WE ACCOMPLISHED IN 1998/99:
• Completed construction of the water line on
Booty's Road.
• Upgraded the chemical feed system at the Park
Water Treatment Plant.
• Installed new water meter registers on all meters
replaced in 1998/99 to allow remote readings.
• Implemented Team Leader management to allow
for employee problem solving and empowerment.
• Worked with the Georgetown Independent
School District (GISD) on various utility issues at
new Pat Cooper Elementary site.
• Completed construction of a water line on FM
2243 for the Escalera Ranch Subdivision.
• Constructed new restrooms at the Playscape,
using donations and labor from volunteers.
WHAT WE PLAN TO ACCOMPLISH IN 1999/00:
• Complete the following Water Capital
Improvement Projects:
• Purchase and install hypochlorite system for
disinfection at wastewater plants as required
by the Environmental Protection Agency.
• Relocate 8 inch water line on Hutto Road in
coordination with Texas Department of Public
Safety road improvements.
• Replace and upsize casing, and replace pump
and motor in Well #2.
• Construct a portion of the West Loop 20 -inch
water line to improve water supply and
provide transmission routes to other parts of
the system.
• Replace an 8 -inch water line with a 12 -inch
line to increase flows to Berry Creek.
• Complete construction of the Sun City Pump
Station and the Rabbit Hill Pump Station.
• Continue support for the Safe Place Program
through screening and training of new employees
and employees in other divisions in partnership
with DARE, the Georgetown Project, GISD, and
Williamson County.
• Install a micro -filtration system at the Southside
wells to increase system capacity up to 2 MGD
without costly construction at the water treatment
plant.
• Develop an irrigation/effluent utility ordinance
and reuse policy to expand the use of effluent
water sources to irrigate City parks, open spaces,
and area golf courses, and to reduce removal of
water from the Edward's Aquifer.
COMMUNITY OWNED UTILITIES
86 ANNUAL OPERATING PLAN ELEMENT 1999/00
^1
^1
�l
L
L
C
L
L
L
L
L
L
ci
L)
L)
(C.J
V
BUDGETED PROJECTED PROPOSED
FY 98/99
ACTUAL
ACTUAL
ACTIVITY INDICATORS
FY 96/97
FY 97/98
1) Water leaks repaired
744
230
2) Water taps installed
720
450
3) Line locations completed
597
530
4) Fire hydrant meters installed
143
100
CITIZEN SURVEY
8/0
8/0
5) Percentage of citizens satisfied
201,538
201,538 Personnel
or better with reliability of City
285,044 (0.0%)
348,736
water and electric
N/A
94%
BUDGETED PROJECTED PROPOSED
FY 98/99
FY 98/99
FY 00
230
324
595
450
450
438
525
950
1,200
100
95
90
80% 92% 92%
1999/00 ADOPTED BUDGET AND 2000/01 PROJECTED BUDGET:
Employees: full time / part time
* Percent change of 99/00 Adopted from 98/99 Projected Actual
** Percent change of 00/01 Projected Base from 99/00 Adopted
SIGNIFICANT CHANGES:
Underground utility locates have increased dramatically since passage of the Texas Line Locate Bill,"ONE CALL"
on October 1, 1998, making it mandatory for anyone who does any digging to call for underground utility locates
before digging. This law pertains not only to commercial excavation businesses but to all residential digging as well.
The number of requests for locates will increase even more dramatically as the public becomes aware of the law.
As part of the implementation of the Customer Choice and Control System (automated meter reading), two of four
meter reader positions were transferred during 1998/99 from the Utility Office (Finance & Administration) to COU.
One position was moved to Water Distribution and one to Wastewater Collection.
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00 87
98/99
99/00
00/01
97/98
98/99
Projected
Adopted
Projected Base
Actual
Budget
Actual
(% Change*)
(% Change **)
6/0
6.75/0
7.5/0 # Employees
8/0
8/0
153,877
201,538
201,538 Personnel
285,044 (41.4%)
285,044 (0.0%)
348,736
329,960
325,928 Operations
358,283 (9.9%)
358,283 (0.0%)
502.613
531,498
527,466
643,327 (22.0%)
643,327 (0.0%)
Employees: full time / part time
* Percent change of 99/00 Adopted from 98/99 Projected Actual
** Percent change of 00/01 Projected Base from 99/00 Adopted
SIGNIFICANT CHANGES:
Underground utility locates have increased dramatically since passage of the Texas Line Locate Bill,"ONE CALL"
on October 1, 1998, making it mandatory for anyone who does any digging to call for underground utility locates
before digging. This law pertains not only to commercial excavation businesses but to all residential digging as well.
The number of requests for locates will increase even more dramatically as the public becomes aware of the law.
As part of the implementation of the Customer Choice and Control System (automated meter reading), two of four
meter reader positions were transferred during 1998/99 from the Utility Office (Finance & Administration) to COU.
One position was moved to Water Distribution and one to Wastewater Collection.
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00 87
WATER TREATMENT FACILITIES
The City of Georgetown operates three water treatment plants: the Lake Water Treatment Facility, rated at 7.5 million
gallons per day (MGD); the San Gabriel Water Treatment Facility, rated at 5.45 MGD.
The City of Georgetown retains ownership of these plants and contracts for their operation with a private contractor.
During 1998/99 the City entered into a partnership agreement with Chisolm Trail Special Utility District (CTSUD)
that provides for joint long-term water supply planning. The agreement gives CTSUD 840 acre feet of water supply
and 2.18 mgd of off-peak water treatment capacity in exchange for service area and compliance with city -level fire
flow requirements as CTSUD expands it water system.
ACTIVITY INDICATORS
1) Water Utility Customers
2) Water Usage (MGD):
Average Flow
Peak Flow
Total Flow (MG)
3) Water Treated for Chisholm
Trail Special Utility District
(MGD)
CITIZEN SURVEY
4) Percentage of citizens
satisfied or better with:
a) Water Quality
b) Water Cost
ACTUAL
ACTUAL
BUDGETED
PROJECTED
PROPOSED
FY 96/97
FY 97/98
FY 98/99
FY 98/99
FY 00
10,264
10,650
11,850
11,000
11,600
5.15
5.13
5.5
6.4
7.5
12.09
12.89
12.50
12.50
13.28
1,880
1,877
1,895
1,895
2,326
N/A
N/A
N/A
N/A
.203
N/A 80% 80% 74% 75%
N/A 66% 66% 66% 72%
1999/00 ADOPTED BUDGET AND 2000/01 PROJECTED BUDGET:
98/99
97/98 98/99 Projected
Actual Budget Actual
99/00 00/01
Adopted Projected Base
(% Change *) (% Change **)
925,057 815,690 815,690 Operations 807,266 (-1.o%) 822,116 (1.80/.)
925,057 815,690 815,690 807,266 (-1.o%) 822,116 (1.80/6)
* Percent change of 99/00 Adopted from 98/99 Projected Actual
** Percent change of 00/01 Projected Base from 99/00 Adopted
COMMUNITY OWNED UTILITIES
88 ANNUAL OPERATING PLAN ELEMENT 1999/00
-1
WATER CONTRACTS
The Water Utility transfers two percent of its gross billings to the General Fund and Street Special Revenue Fund.
This transfer is a payment of franchise fees which would have been payable to the General Fund from a non -City
provider of such services.
This department is also used to account for the contractual obligations not specific to any individual department of
the fund. Special Projects and Services includes programs such as public education on water conservation, as well
as contracts and professional services.
This department also includes payments to the Brazos River Authority for the City's surface water supply. The City
has water rights to 6,720 acre feet in Lake Georgetown and 15,488 acre feet in Lake Stillhouse Hollow. These water
rights are expected to meet the needs of Georgetown's current certificated water service area through full build out.
1999/00 ADOPTED BUDGET AND 2000/01 PROJECTED BUDGET:
98/99
97/98 98/99 Projected
Actual Budget Actual
99/00 00/01
Adopted Projected Base
(% Change *) (% Change **)
428,105
156,294
161,810
Admin Allocations
157,889
(-2.4^x,)
157,889
(o-0%)
0
0
0
CCC Maintenance
150,000
(N/A)
150,000
(0.0%)
272,813
316,998
360,000
BRA - Water Purchases
365,000
(1.4%)
375,000
(2.7%)
81,731
155,000
121,500
Council Contingency
150,000
(23.5%)
125,000
(-16.7%)
148,807
143,447
1517575
Franchise Fee
152,525
(0.6%)
155,180
(1.7%)
319,896
596,038
571,592
Joint Svc Allocations
601,162
(5.2%)
601,162
(0.0%)
0
0
0
CIS System
300,000
(N/A)
300,000
(0.0%)
69,609
25,000
26,300
Special Projects & Svcs
356,525
(1255.6"x,)
286,300
(-19.7%)
1,320,961 1,392,777 1,392,777
* Percent change of 99/00 Adopted from 98/99 Projected Actual
** Percent change of 00/01 Projected Base from 99/00 Adopted
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00
2,233,101 (60.3%) 2,150,531 (-3.7%)
89
WHAT WE DO:
The Wastewater Collection Department maintains and
rehabilitates the wastewater collection system, through
routine inspections of system facilities and restoration
of broken or collapsed mains. The Department
provides maintenance services including: the
installation of wastewater taps, the clearing, jet
cleaning and camera inspection of lines,
troubleshooting customer problems, and locating City
wastewater lines. In addition, the Department
performs preventive maintenance functions of the
expanded collection system. This department
coordinates with Building Inspection to ensure a safe
and functioning wastewater system
WHAT WE ACCOMPLISHED IN 1998/99:
• Constructed the Williams Drive wastewater line
from Country Club lift station to Booty's Road to
provide for commercial growth.
• Completed the design, easements and permitting
process for the Pecan Branch Wastewater
Treatment Plant.
• Installed lift station on Blue Hole Park restroom.
• Installed new 6 inch sub -main sewer line at Main
Street.
• Constructed new sewer line to new restroom in
San Gabriel Park.
• Constructed new sewer line to new restroom at
Little League Baseball complex in San Gabriel
Park.
• Completed engineering drawings and obtained
easements for the second phase of the Pecan
Branch Wastewater Line to extend gravity sewer
from County Road 152 to FM 971, for flow into
Pecan Branch.
• Constructed the Smith Branch Feeder to divert
wastewater from 15th Street, and to reduce load
from the San Gabriel Wastewater Treatment
Plant.
90
• Assisted in the design, approval process and
coordination for the placement of the Safe Place
tiles for the columns at the Recreation Playscape
area.
WHAT WE PLAN TO ACCOMPLISH IN 1999/00:
• Wastewater Capital Improvements to be
completed in 1999/00:
• Begin construction of the Pecan Branch
Wastewater Treatment Plant.
• Purchase and install hypochlorite system for
disinfection at wastewater plants as required
by the Environmental Protection Agency.
• Install wastewater line to Pecan Branch to
relieve overuse of Williams Drive Lift
Station.
• Design and extend gravity wastewater lines
to Sinuso Drive, Serenada Drive and Toledo
Trail.
• Install effluent return line from the San
Gabriel Wastewater Treatment Plant to Park
Storage Tank to reuse water for irrigation.
• Continue support for the Safe Place Program
through screening and training of new employees
and employees in other divisions (in partnership
with Drug Awareness Resistance Education
(DARE), the Georgetown Project, Georgetown
Independent School District (GISD) and
Williamson County.
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00
SIGNIFICANT CHANGES:
Underground utility locates have increased dramatically since passage of the Texas Line Locate Bill,"ONE CALL"
on October 1,1998, making it mandatory for anyone who does any digging to call for underground utility locates
before digging. This law pertains not only to commercial excavation businesses but to all residential digging as well.
The number of requests for locates will increase even more dramatically as the public becomes aware of the law.
As part of the implementation of the Customer Choice and Control System (automated meter reading), two of four
meter reader positions were transferred during 1998/99 from the Utility Office (Finance & Administration) to COU.
One position was moved to Water Distribution and one to Wastewater Collection.
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00
91
ACTUAL ACTUAL
BUDGETED PROJECTED
PROPOSED
ACTIVITY INDICATORS
FY 96/97 FY 97/98
FY 98/99
FY 98/99
FY 99/00
1) Sewer blockages cleared
239 165
165
165
324
2) Manholes repaired
39 6
6
6
5
3) Line locations completed
45 50
50
50
1,200
4) Wastewater taps installed
324 300
300
300
438
1999/00 ADOPTED BUDGET AND 2000/01 PROJECTED BUDGET:
98/99
99/00
00/01
97/98 98/99
Projected
Adopted
Projected Base
Actual Budget
Actual
(% Change *)
(% Change **)
5/1 5/1
6/1 # Employees
6/1
6/1
171,405 192,296
192,296 Personnel
213,713 (11.1%)
213,713
(o.o%)
188,285 247,036
239,292 Operations
279,725 (16.9%)
279,725
(o.o%)
0 13,384
13,384 Capital
0 (-100.0%)
0
(N/A)
359,690 452,716
444,972
493,438 (1o.9%)
493,438
(o.o%)
Employees: full time / part time
* Percent change of 99/00 Adopted from 98/99 Projected Actual
** Percent change of 00/01 Projected Base from 99/00 Adopted
SIGNIFICANT CHANGES:
Underground utility locates have increased dramatically since passage of the Texas Line Locate Bill,"ONE CALL"
on October 1,1998, making it mandatory for anyone who does any digging to call for underground utility locates
before digging. This law pertains not only to commercial excavation businesses but to all residential digging as well.
The number of requests for locates will increase even more dramatically as the public becomes aware of the law.
As part of the implementation of the Customer Choice and Control System (automated meter reading), two of four
meter reader positions were transferred during 1998/99 from the Utility Office (Finance & Administration) to COU.
One position was moved to Water Distribution and one to Wastewater Collection.
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00
91
WASTEWATER TREATMENT FACILITIES
The City of Georgetown operates three wastewater treatment plants: the Dove Springs Wastewater Treatment Facility,
rated at of 1.25 million gallons per day (MGD); the San Gabriel Wastewater Treatment Facility, rated at of 2.5 MGD; and
the Berry Creek Wastewater Treatment Facility, rated at 100,000 gallons per day. These award winning plants treat
domestic and industrial effluent according to statutory regulations, and provide environmentally safe disposal of
wastewater materials.
The City of Georgetown contracts with a private contractor to provide for the safe operation of the wastewater plants. The
private contractor conducts routine wastewater bio -monitoring, nitrogen removal and dechlorination. The City continues
to closely monitor and evaluate these operations and retains ownership of the plants.
The Pecan Branch Wastewater Treatment Plant will be constructed in 1999/00 to provide additional system capacity and
service for Sun City.
CITIZEN SURVEY
Percentage of Citizens satisfied or
better with:
a) Wastewater Service cost N/A 68% 68% 68% 70%
X999/00 ADOPTED BUDGET AND 2000/01 PROJECTED BUDGET:
98/99
97/98 98/99 Projected
Actual Budget Actual
791,556 739,082 721,332 Operations
791,556 739,082 721,332
* Percent change of 99/00 Adopted from 98/99 Projected Actual
** Percent change of 00/01 Projected Base from 99/00 Adopted
SIGNIFICANT CHANGES:
99/00
Adopted
(% Change *)
00/01
Projected Base
(% Change **)
718,496 (-0.4%) 938,646 (30.6%)
718,496 (-0.4%) 938,646 (30.6%)
Operating costs for plant operation will increase significantly when the Pecan Branch Wastewater Treatment Plant is
brought on-line in Spring 2001. Costs for wastewater plant operations will increase 25-30% or $300,000 to $325,000
annually. The costs for the partial year of operations in 2000/01 are estimated at $220,150.
COMMUNITY OWNED UTILITIES
92 ANNUAL OPERATING PLAN ELEMENT 1999/00
ACTUAL
ACTUAL
BUDGETED
PROJECTED
PROPOSED
ACTIVITY INDICATORS
FY 96/97
FY 97/98
FY 98/99
FY 98/99
EY 00
1) Wastewater Utility Customers
8,065
8,700
9,500
9,000
9,300
2) Average Daily Flow (MGD)
2.6
2.6
3.2
2.9
3.0
3) Peak Daily Flow (MGD)
9.8
5.0
8.0
8.0
9.7
4) Million gallons treated
933
1,065
1,300
1,300
1,300
CITIZEN SURVEY
Percentage of Citizens satisfied or
better with:
a) Wastewater Service cost N/A 68% 68% 68% 70%
X999/00 ADOPTED BUDGET AND 2000/01 PROJECTED BUDGET:
98/99
97/98 98/99 Projected
Actual Budget Actual
791,556 739,082 721,332 Operations
791,556 739,082 721,332
* Percent change of 99/00 Adopted from 98/99 Projected Actual
** Percent change of 00/01 Projected Base from 99/00 Adopted
SIGNIFICANT CHANGES:
99/00
Adopted
(% Change *)
00/01
Projected Base
(% Change **)
718,496 (-0.4%) 938,646 (30.6%)
718,496 (-0.4%) 938,646 (30.6%)
Operating costs for plant operation will increase significantly when the Pecan Branch Wastewater Treatment Plant is
brought on-line in Spring 2001. Costs for wastewater plant operations will increase 25-30% or $300,000 to $325,000
annually. The costs for the partial year of operations in 2000/01 are estimated at $220,150.
COMMUNITY OWNED UTILITIES
92 ANNUAL OPERATING PLAN ELEMENT 1999/00
WASTEWATER CONTRACTS
The Wastewater Utility transfers two percent of its gross billings to the General Fund and Street Special Revenue
Fund. This transfer is a payment of franchise fees which would have been payable to the General Fund from a non -
City provider of such services.
This department is also used to account for the contractual obligations not specific to an individual department of the
fund.
1999/00 ADOPTED BUDGET AND 2000/01 PROJECTED BUDGET:
98/99
99/00
00/01
97/98
98/99
Projected
Adopted
Projected Base
Actual
Budget
Actual
(%o Change *)
(% Change **)
79,460
84,259
86,440
Franchise Fees
90,240 (4.49/6)
92,685 (2.7%)
324,197
101,376
105,286
General Fund Allocations
103,838 (-1.4%)
103,838 (0.0%)
394,518
644,879
638,355
Joint Svc Allocations
675,869 (5.9%)
675,869 (0.0%)
422,341
20,800
20,000
Spec. Svc / Legal
95,000 (375.0)
20,000 (-78.9^/6)
1,220,516 851,314 850,081
* Percent change of 99/00 Adopted from 98/99 Projected Actual
** Percent change of 00/01 Projected Base from 99/00 Adopted
COMMUNITY OWNED UTILITIES
ANNUAL OPERATING PLAN ELEMENT 1999/00
964,947 (13.5%) 892,392 (-7.sio)
93
This page intentionally left blank.
COMMUNITY OWNED UTILITIES
94 ANNUAL OPERATING PLAN ELEMENT 1999/00