The Georgetown Utility Systems Division consists of Administration, Energy Services (Electric and AMR),
Transportation Services (Streets and Stormwater Drainage), Systems Engineering, Water Services (Pump
Maintenance, Wastewater Collection, Water Distribution, Reuse Irrigation and Wastewater and Water Treatment).
This division constructs, maintains, and operates the City's utility infrastructure. The Division is responsible to
maintain positive working relationships with outside organizations including, the Texas Natural Resources
Conservation Commission and the Texas Department of Transportation. The Division also coordinates contracts
with the private sector. This Division also oversees and coordinates the "Safe Place" children's program.
Georgetown Utility Systems
Administration
Energy Sevices
Electric
Page 82
IISCAag -SMR II
Systems Engineering
Page 88
Transportation Services
Stormwater Drainage
Page 90 11
Streets
Page 92
Water Services
Pump Maintenance
Page 94
II Water
Page 96 �I
Wastewater
Page 104
Georgetown
Utility Systems
00/01
01/02
02/03
99/00
00/01
PROJECTED
ADOPTED ESTIMATED
ACTUAL
BUDGET
ACTUAL
% Chan e'
BASE
Administration
324,537
354,335
354,335
490,051 (38.3%)
487,151
Electric
1,090,877
1,217,548
1,217,541
1,407,327 (15.6%)
1,414,227
AMR
249,540
249,540
517,779 (107.5%)
520,145
Electric Contracts
15,437,379
14,224,311
17,254,928
16,202,280 (-6.1%)
15,667,639
Pump Maintenance
406,373
422,404
422,323
451,485 (6.9%)
451,485
Stormwater Drainage
413,383
484,849
482,563
596,413 (23.6%)
600,025
Streets
1,044,247
1,549,175
1,508,628
2,109,076 (39.8%)
2,259,076
Systems Engineering
164,398
238,033
235,333
316,260 (34.4%)
316,260
Water Distribution
793,309
812,818
812,775
920,987 (13.3%)
920,876
Water Treatment
950,740
1,281,520
1,281,520
946,620 (-26.1%)
946,620
Water Contracts
2,087,096
2,251,724
2,136,065
3,078,762 (44.1%)
3,128,504
Wastewater Collection
479,893
658,949
658,860
699,307 (6.1%)
799,307
Wastewater Treatment
672,968
660,942
702,942
1,220,420 (73.6%)
1,481,384
Wastewater Contracts
929,993
833,685
870,504
980,095 (12.6%)
984,991
Reuse Irrigation
25,100 (N/A)
36,280
Division Total
24,795,193
25,239,833
28,187,857
29,961,962 (6.3%)
30,013,970
' Percent change of 01/02 Adopted from 00/01 Projected Actual
Electric Contracts
16,202,280
+
?
Capital
4%
Water Ops
5,422,954
Wastewater Ops2,899,822
y : > i
irN awl ,
Personnel
11%
Streets 2,109, 076
z
Electric Ops 1,925,106
O %e
Operations
85%-'
a
k u'.,¢ �k rs•� �A
*Support 806,311
tX 1 a 's'' �'�+ y',;t•
_
Stormwater 596,413L"
0 2,000,000
4,000,000 6,000,000 8,000,000 10,000,000
' Includes Administration & Systems Engineering
79
Georgetown Utility Systems
Administration
DEPARTMENT DESCRIPTION
The Georgetown Utility Systems (GUS) Administration Department manages financial operations and personnel
services for all departments in the division. The Department provides administrative support, including customer
relations, reception, record keeping, and secretarial services, to all departments within the division. Long-term
system planning is coordinated by this department. Administration is responsible for coordination and operation of
Utilities during Emergency Management situations.
MAJOR DEPARTMENT GOALS
• Provide reliable utility services and efficient, effective transportation systems that protect the community and
reflect its values.
• Promote a safe and positive working environment for employees.
• Ensure excellent customer service to the Georgetown community.
• Promote Consumer Education program for efficient utility use, conservation, and customer service.
• Maintain quality utilities and transportation systems that promote well planned development.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2000/2001
• Worked with Georgetown Independent School District to resolve neighborhood concerns related to the Benold
bus lane.
• Completed contracts with Calpine and Gentex Energy for 10% Power Option power purchases for stabilized
cost of electric service.
• Provided support for the City's Utility Rate Study to determine cost for providing services.
• Expanded negotiations with Chisholm Trail Special Utility District (CTSUD) to include a possible Joint
Operating Agreement (JOA).
• Successfully bid Pecan Branch Wastewater Treatment Plant and began construction process of the City's
fourth wastewater treatment plant.
• Coordinated with Williamson County to form the Shell Road Public Improvement District (PID) to fund
transportation infrastructure.
• Hosted Open House meetings related to the Capital Improvement Project 5 -Year Plan to receive public
comment.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2001/2002
• Successfully relocate Georgetown Utility Systems operations to the new complex on Industrial Avenue.
• Coordinate with other divisions in the City to revise personnel policies by May, 2002 to provide consistent
personnel guidelines for employees.
• Clearly identify cost benefit analysis of proposed annexation plan to identify potential revenue generation
related to utilities and transportation.
• Create regional stormwater facilities specific to drainage basins to reduce the threat of property damage and
increase public safety.
• Educate customers on efficient use of consumable utilities to reduce peak demands.
ADMINISTRATION
99/00
ACTUAL
00/01
BUDGET
00/01
ACTUAL
01/02
ADOPTED
02/03
PROJECTED
Assistant City Manager for Utilities
1
1
1
1
1
Administrative Manager
1
1
1
1
1
Administrative Assistant
1
1
1
1
1
Dispatcher Customer Service Coordinator
1
1
1
2
2
Secretary/Receptionist
1
1
1
1
1
Paralegal
0
0
0
1
1
Total
15
15
15
17
7
80
PERFORMANCE MEASURES
ACTUAL
ACTUAL
BUDGETED
PROJECTED
PROPOSED
WORKLOAD MEASURES
FY 98/99
FY 99/00
FY 00/01
FY 00101
FY 01/02
1. Work orders issued
15,317
12,785
16,000
16,589
17,000
2. Contracts negotiated
33
49
60
60
60
3. Purchase orders processed
N/A
N/A
1,200
1,305
1,400
PERFORMANCE MEASURES
ACTUAL
FY 98/99
ACTUAL
FY 99/00
BUDGETED
FY 00/01
PROJECTED
FY 00/01
PROPOSED
FY 01102
1. Consumer education program
contacts
N/A
N/A
2,016
2,016
6,552
2. Customer satisfaction of field
operations
N/A
N/A
N/A
90%
92%
3. Lost time injury/accidents
N/A
N/A
0
0
0
DEPARTMENTAL BUDGET: JOINT SERVICES FUND
00/01
99/00 00/01 PROJECTED
ACTUAL BUDGET ACTUAL
231,292 255,214 255,214
91,986 99,121 99,121
1,259
324,537 354,335 354,335
MAJOR BUDGET CHANGES/ISSUES:
02/03
01/02 ESTIMATED
ADOPTED BASE
Personnel 350,499 350,499
Operations 139,552 136,652
Capital
490,051 487,151
Georgetown Utility Systems' operations will relocate to the new municipal complex on Industrial Avenue as soon as
remodeling is completed. During construction in 2002, utility costs will be paid on both the current building and the
new complex, which accounts for the variance in operational costs.
A dispatch position is added in 2001/02 to expand service hours and enhance customer service, and a paralegal
position is also included to handle easement acquisitions and other right-of-way issues.
81
Georgetown Utility Systems
Energy Services — Electric Operations
DEPARTMENT DESCRIPTION
The Electric Department constructs and maintains a complete system of
electric conductors, switches, lines and transformers used for the distribution
of electricity purchased wholesale from the Lower Colorado River Authority
(LCRA) and Calpine Energy Services Corporation. In addition, the Electric
Department reviews plans for construction of new lines (overhead and
underground), and develops design specifications that meet all safety and
construction requirements. The Electric Department installs and maintains
streetlights and security lighting systems. The department administers a tree
trimming maintenance program to minimize outages and prevent damage to
electric distribution equipment and lines. The department promotes public
education and provides information through safety programs. In addition, the
department monitors proposed legislation related to electric deregulation and
evaluates its potential impact on the City of Georgetown and its customers.
MAJOR DEPARTMENT GOALS
NUMBER OF ELECTRIC CUSTOMERS
VM WW VW vim
Maintain a nationally recognized safety record for the City's electric and AMR departments.
Stay abreast of issues related to the Texas electric utility industry due to deregulation.
Explore viable options to control and reduce our purchased power expenses.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2000/2001
• Earned a First Place American Public Power Association award for safety accomplishments.
• Negotiated a 10% power supply contract with Calpine Energy Services, and experienced 10 mw of system
load growth.
• Constructed 40 miles of new underground lines and 11 miles of new overhead lines for system expansion.
• Installed 50 new streetlights and implemented a monthly street light patrol and repair program.
• Negotiated an exclusive Power Supply and Electric Distribution System maintenance agreement with
Southwestern University.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2001/2002
• Begin installation of SCADA controlled equipment in Georgetown and Chief Brady substations to allow for
improved identification of outage causes and locations that will aid in service restoration and troubleshooting.
• Develop and implement a line technician training program for all electric department personnel.
• Develop and implement a new construction specification manual to allow for standardized construction
practices.
• Complete new substation and feeder exits in conjunction with LCRA, to serve the growing load on the 1-35
corridor.
• Automate substation equipment to aid outage detection, service restoration and system reliability.
• Implement a yearly thermovision program for all electric facilities to increase system reliability.
• Develop a yearly electric meter testing program for all demand customers to ensure revenue reliability.
ELECTRIC
99/00
ACTUAL
00/01
BUDGET
00/01
ACTUAL
01/02
ADOPTED
02/03
PROJECTED
Energy Services Manager
1
1
1
1
1
1
1
Operations Team Leader — Electric
1
1
1
0
0
SCADA System Operator
1
1
1
2
2
Inspector - Electric
2
2
3
2
3
3
3
Crew Leader - Electric
3
3
3
Line Technician
3
6
3
6
3
6
6
6
Apprentice Line Technician
17
17
17
16
16
Total
82
WORKLOAD MEASURES
ACTUAL
FY 98/99
ACTUAL
FY 99/00
BUDGETED
FY 00/01
PROJECTED
FY 00/01
PROPOSED
FY 01/02
1. # of customers
12,412
13,482
14,182
14,314
15,150
2. Temporary power connections
624
1,050
875
1,100
1,275
3. Permanent power connections
351
1,050
875
1,200
1,400
4. # of street lights
2,000
2,095
2,150
2,180
2,250
5. Street light repairs
547
606
1,100
800
850
6. Underground locates
954
4895
3,500
4,900
5,000
7. Ft of 3 phase OH line constructed
N/A
42,250
62,000
40,000
52,000
8. Ft of 3 phase UG constructed
N/A
52,500
52,000
52,000
55,000
PERFORMANCE MEASURES
ACTUAL
FY 98/99
ACTUAL
FY 99/00
BUDGETED
FY 00/01
PROJECTED
FY 00/01
PROPOSED
FY 01/02
1. Compliance with ERCOT 95% LF
100%
100%
100%
100%
100%
2. % of system GPS
0%
10%
80%
95%
100%
3. Feeder line circuit maintenance
5%
10%
30%
25%
40%
4. Safety Incidence Rate:
6%
0%
0%
0%
0%
Total number of cases X 200.000
Total Worker -hours of exposure
5. Electric System training by TEEX
0%
70%
100%
100%
100%
DEPARTMENTAL BUDGET: ELECTRIC FUND
00/01
99/00 00/01 PROJECTED
ACTUAL BUDGET ACTUAL
688,582 790,417
401,724 427,131
571
790,410 Personnel
427,131 Operations
Capital
1,090,877 1,217,548 1,217,541
MAJOR BUDGET CHANGES/ISSUES:
01/02
ADOPTED
811,745
595,582
02/03
ESTIMATED
RASE
811,745
602,482
1,407,327 1,414,227
The SCADA System Operator was transferred to the newly created Automatic Meter Reading (AMR) department to
manage the department.
Right of Way maintenance is transferred to this department as an on-going maintenance function which was
previously accounted for in the Capital Improvements Program budget.
83
Georgetown Utility Systems
Energy Services - Electric Contracts
The Electric Fund transfers to the General Fund two percent of its gross billings for utility services. This transfer
has been viewed as a payment of franchise fees which would have been payable to the General Fund from a non -
City provider of such services.
This department also accounts for the contractual obligations not specific to an individual department of the fund,
such as purchased power costs paid to the City's wholesale provider. Special Projects and Services include
programs such as public education, energy and contracts not attributable to the Electric Department. Allocated
costs for administrative or support departments are also recognized. The City maintains 182 miles of overhead
electric distribution lines, 81 miles of underground distribution lines, and has a 100 -megawatt capacity.
ELECTRIC CONTRACTS BUDGET: ELECTRIC FUND
00/01 02/03
99/00 00/01 PROJECTED 01/02 ESTIMATED
ACTUAL BUDGET ACTUAL ADOPTED BASE
13,622,986
12,542,100
15,509,376
Purchased Power
14,238,000
13,700,000
400,889
459,299
413,258
General Fund Allocations
415,982
415,982
683,100
733,812
772,394
Joint Svc Allocations
976,621
976,621
432,247
405,300
463,900
Franchise Fees
441,300
435,800
298,157
83,800
96,000
Special Projects & Svcs
130,377
139,236
15,437,379
14,224,311
17,254,928
16,202,280
15,667,639
MAJOR BUDGET CHANGES/ISSUES:
Purchased power costs decrease in 2002 due to the predicted reduction of the fuel surcharge implemented by the
City's power provider in 2000.
84
GEORG
� o
ED
This page intentionally left blank.
85
Georgetown Utility Systems
Energy Services - SCADA Automatic Meter Reading (AMR)
DEPARTMENT DESCRIPTION
The SCADA-AMR Department is responsible for operation,
maintenance, and gathering of customer utility consumption data.
This is accomplished by operation of a fixed wireless network for use
by Utility Billing in preparing customers water, wastewater and
electric billings and by a power line carrier system for the City's large
commercial and industrial electric customers. The Department also
monitors and assists with controlling of the City's electric, pumping,
water and wastewater facilities via a SCADA wireless network. The
department currently monitors 4 -electric substations with 16
substation breakers, 22 -lift stations, 5 -pumping stations, 3 -water
treatment plants, 3 -wastewater treatment plant, 6 -well sites, as well
as the emergency notification sirens.
MAJOR DEPARTMENT GOALS
• Assist utility customers in conservation efforts by providing accurate, individualized water and electric
consumption data.
• Ensure that 95% of electric and water meters are read electronically and accurately.
• Expand the large commercial and industrial electric metering system.
• Expand deployment of water ERT's to new growth areas of the City's water system.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2000/2001
• Performed the AMR System Acceptance Test for the water and electric systems to complete installation of the
system.
• Completed study to be used for placement of current and future wireless infrastructure necessary to operate
the system efficiently and completed the GPS of the entire system.
• Brought AMR maintenance in house, improving communications within utility operations, and cost savings.
• Earned a First Place American Public Power Association award for safety accomplishments.
• Contracted for SCADA system maintenance and calibration services to aid in maintaining system reliability.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2001/2002
Begin installation of SCADA controlled equipment in Georgetown and Chief Brady substations to allow for
improved identification of outage causes and locations that will aid in service restoration and troubleshooting.
Expand SCADA system to allow for control of all substation breakers and line breakers and additional water
and wastewater facilities and other development within the service area.
Maintain 100% AMR deployment in electric and complete water deployment due to growth in 00/01.
86
99/00
00/01
00/01
01/02
02/03
AUTOMATIC METER READING (AMR)
ACTUAL
BUDGET
ACTUAL
ADOPTED
PROJECTED
AMR Systems Technician
0
2
2
2
2
1
AMR Meter Reader
0
1
1
0
1
1
1
AMR System Operator
0
0
1
1
SCADA System Operator
0
0
0
1
1
SCADA System Manager
0
0
0
3
6
1 6
Total
1 0
3
1
86
WORKLOAD MEASURES
ACTUAL
FY 98/99
ACTUAL
FY 99/00
BUDGETED
FY 00/01
PROJECTED
FY 00/01
PROPOSED
FY 01/02
1. Electric ERT's installed
10,500
894
2,000
2,000
1,321
2. Water ERT's installed
1,160
8,340
1,000
1,000
3,653
3. Itron CCU's installed
N/A
37
20
20
30
4. MCT's installed
N/A
73
20
20
45
5. Cannon Repeaters/CCU installed
N/A
N/A
4
4
2
6. RTU upgrades
N/A
1
3
3
3
7. RTU installs
N/A
2
2
2
5
PERFORMANCE MEASURES
ACTUAL
FY 98/99
ACTUAL
FY 99/00
BUDGETED
FY 00/01
PROJECTED
FY 00/01
PROPOSED
FY 01/02
1. Daily successful readings
N/A
90%
92%
92%
94%
2. Monthly water read frequency
N/A
N/A
86%
86%
95%
3. Monthly electric read frequency
N/A
N/A
94%
94%
95%
4. Monthly commercial read freq.
N/A
N/A
96%
96%
97%
5. CCU success rate
N/A
97%
98%
98%
99%
6. SCADA uptime
N/A
99.4%
99.7%
99.7%
99.7%
7. SCADA system remote controlled
N/A
83%
92%
92%
96%
DEPARTMENTAL BUDGET: ELECTRIC FUND
MAJOR BUDGET CHANGESIISSUES:
02/03
01/02 ESTIMATED
ADOPTED BASE
249,280 251,646
268,499 268,499
517,779 520,145
This department was created in Spring 2001, once the system was fully operational. The SCADA System Manager
was also transferred from the Electric Operations department to this department. A SACDA Operator and AMR
Operator are added in 2001/02 to enhance system efficiency and provide system operational coverage.
While the entire cost of operating this department is shown here for FY 2002, one half of the cost is allocated to the
Water fund and is shown as revenue to the Electric fund.
87
00/01
99/00 00/01
PROJECTED
ACTUAL BUDGET
ACTUAL
83,478
83,478 Personnel
52,062
52,062 Operations
114,000
114,000 Capital
0 249,540
249,540
MAJOR BUDGET CHANGESIISSUES:
02/03
01/02 ESTIMATED
ADOPTED BASE
249,280 251,646
268,499 268,499
517,779 520,145
This department was created in Spring 2001, once the system was fully operational. The SCADA System Manager
was also transferred from the Electric Operations department to this department. A SACDA Operator and AMR
Operator are added in 2001/02 to enhance system efficiency and provide system operational coverage.
While the entire cost of operating this department is shown here for FY 2002, one half of the cost is allocated to the
Water fund and is shown as revenue to the Electric fund.
87
Georgetown Utility Systems
Systems Engineering
DEPARTMENT DESCRIPTION
The Systems Engineering Department manages and maintains utility
system models for departments within the Georgetown Utility Services
Division: including Water, Electric, Stormwater Drainage, Streets and
Wastewater. This department coordinates and administers Capital
Improvement Projects (C.I.P.$) with outside engineering firms, handles
easement and right-of-way negotiations and acquisitions and manages
construction phases. The construction standards/specifications are
developed and maintained by Systems Engineering to regulate CIP and
Development construction. Systems Engineering supports the review of
approximately 150 development plans and reviews annually. The
department also provides engineering services related to grant
applications.
MAJOR DEPARTMENT GOALS
Provide the highest quality inspection and quality control for CIP and development related infrastructure
construction.
Establish and maintain successful asset management practices within Georgetown Utility Systems.
Apply modern technology to reduce the cost and disruption of utility service.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2000/2001
• Successfully staffed the Engineering Systems Department and consolidated the Development Infrastructure
inspection and the CIP inspection services under the direction of Systems Engineering.
• Directed Consultant design of 31 CIP projects and 6 Engineering Studies.
• Assisted in the preparation of a Transportation System Cost Analysis for support of the 1/2 cent sales tax.
• Revised the construction standards/details for utilization for infrastructure construction to reflect current
construction management practices and reduce long term maintenance.
• Utilized innovative construction techniques/practices to minimize environmental liability, increase customer
involvement and respond to customer related concerns during CIP construction.
• Successfully directed completion of the Regional Stormwater Drainage Study and Drainage Criteria Manual.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2001/2002
Implement Transportation Improvement planning for Georgetown 46 consideration.
Begin implementation of Phase I of the Regional Stormwater Drainage Plan to effectively manage the City's
drainage issues.
Develop an inspector certification program to upgrade inspection services.
SYSTEMS ENGINEERING
CIP PROJECT COSTS
00/01
BUDGET
00/01
ACTUAL
01/02
ADOPTED
02/03
PROJECTED
System Engineering Manager
1
1
1
1
1
1
1
C.I.P. Coordinator
0
0
0
1
1
1
Utility Systems Information Manager
1
sem0000
$
s.aw000
Chief Field Representative
1
1
1
a
�wep,co.�+-.mwoMc.
Field Representative
Provide the highest quality inspection and quality control for CIP and development related infrastructure
construction.
Establish and maintain successful asset management practices within Georgetown Utility Systems.
Apply modern technology to reduce the cost and disruption of utility service.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2000/2001
• Successfully staffed the Engineering Systems Department and consolidated the Development Infrastructure
inspection and the CIP inspection services under the direction of Systems Engineering.
• Directed Consultant design of 31 CIP projects and 6 Engineering Studies.
• Assisted in the preparation of a Transportation System Cost Analysis for support of the 1/2 cent sales tax.
• Revised the construction standards/details for utilization for infrastructure construction to reflect current
construction management practices and reduce long term maintenance.
• Utilized innovative construction techniques/practices to minimize environmental liability, increase customer
involvement and respond to customer related concerns during CIP construction.
• Successfully directed completion of the Regional Stormwater Drainage Study and Drainage Criteria Manual.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2001/2002
Implement Transportation Improvement planning for Georgetown 46 consideration.
Begin implementation of Phase I of the Regional Stormwater Drainage Plan to effectively manage the City's
drainage issues.
Develop an inspector certification program to upgrade inspection services.
SYSTEMS ENGINEERING
99/00
ACTUAL
00/01
BUDGET
00/01
ACTUAL
01/02
ADOPTED
02/03
PROJECTED
System Engineering Manager
1
1
1
1
1
1
1
C.I.P. Coordinator
0
0
0
1
1
1
Utility Systems Information Manager
1
1
1
Chief Field Representative
1
1
1
1
2
2
Field Representative
1
1
4
2
5
6
6
Total
1 4
1
1
88
WORKLOAD MEASURES
ACTUAL
FY 98/99
ACTUAL
FY 99/00
BUDGETED
FY 00/01
PROJECTED
FY 00/01
PROPOSED
FY 01/02
1. Information requests processed
1,900
1,900
2,300
2,300
2,500
2. Easement/Right-of-Way
N/A
N/A
100%
78%
100%
acquisitions
77
44
25
30
40
3. Capital Improvement Projects:
47,271
164,398
238,033
# of projects
14
22
40
22
38
Project payments
$4,600,000
$6,895,000
$14,818,658
$4,842,884
$15,693,400
4. Computer mapping, modeling
hours
250
260
260
300
300
DEPARTMENTAL BUDGET: JOINT SERVICES FUND
ACTUAL
ACTUAL
BUDGETED
PROJECTED
PROPOSED
PERFORMANCE MEASURES
FY 98/99
FY 99/00
FY 00/01
FY 00/01
FY 01/02
1. % CIP projects —design complete
N/A
N/A
100%
78%
100%
2. % CIP projects under construction
N/A
N/A
100%
55%
100%
DEPARTMENTAL BUDGET: JOINT SERVICES FUND
MAJOR BUDGET CHANGES/ISSUES:
In 2001, a Utility Inspector was transferred from Inspection Services in Development and Planning. In 2002, the
operational costs for the CIP Coordinator position were transferred from the Streets department. Other related
operational costs for vehicles and computers for both positions are also transferred in 2002.
89
00/01
02/03
99/00
00/01
PROJECTED
01/02
ESTIMATED
ACTUAL
BUDGET
ACTUAL
ADOPTED
BASE
123,038
205,824
205,824 Personnel
268,989
268,989
41,360
32,209
29,509 Operations
47,271
47,271
164,398
238,033
235,333
316,260
316,260
MAJOR BUDGET CHANGES/ISSUES:
In 2001, a Utility Inspector was transferred from Inspection Services in Development and Planning. In 2002, the
operational costs for the CIP Coordinator position were transferred from the Streets department. Other related
operational costs for vehicles and computers for both positions are also transferred in 2002.
89
Georgetown Utility Systems
Transportation Services - Stormwater Drainage
DEPARTMENT DESCRIPTION
The Stormwater Drainage Utility addresses environmental concerns over
in -stream water quality, regulatory demands related to stormwater run-
off controls, infrastructure operation and maintenance, and DETENTION PONDS MAINTAINED
drainage/flood control related capital project needs. Other duties include
assisting Police and Fire Services on Code Enforcement issues. ,a
76 n
MIN sm WM 011W
MAJOR DEPARTMENT GOALS
• Utilize the Regional Stormwater Master Plan by building detention ponds as needed within the City.
• Comply with Phase II Stormwater regulations by 2003.
• Reduce the threat of property damage and personal injury, and enhance public safety through proper
maintenance and operation of the City's drainage system.
• Improve the cleanliness and appearance of the community through the sweeping of City streets.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2000/2001
Installed warning lights at the Berry Creek low-water crossing bridge to enhance public safety.
Completed the Regional Stormwater Detention Plan for future drainage development needs.
Replaced inadequate stormsewer in Old Town and installed approximately 2,000 feet of curb and gutter.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2001/2002
• Implement a mowing schedule for all drainage conveyances, utilizing contract and in-house services.
• Contract with a structural engineer to evaluate the existing condition of the City's Park dams and retaining
wall and implement recommendations to correct deficiencies.
• Eliminate flooding of drainage conveyances along the railroad lines from Church Street to University Avenue.
• Determine realistic amount of curb and gutter to be installed annually and develop an implementation plan.
STORMWATER DRAINAGE
99/00
ACTUAL
00/01
BUDGET
00/01
ACTUAL
01/02
ADOPTED
02/03
PROJECTED
Supervisor/ Sign & Drainage
1
1
1
1
1
1
1
Sign & Drainage Field Technician
1
1
1
1
Heavy Equipment Operator
0
0
0
1
1
Light Equipment Operator
0
0
0
1
1
Street Sweeper Operator
1
1
1
1
Crewman 1 (P!n
Total FT/P
.5
3/.5
.5
3/.5
.5
3/.5
.5
5/.5
.5
5/.5
90
WORKLOAD MEASURES
ACTUAL
FY 98/99
ACTUAL
FY 99/00
BUDGETED
FY 00/01
PROJECTED
FY 00/01
PROPOSED
FY 01/02
1. Miles of public right-of-way mowed
BUDGET
ACTUAL
130,984
137,571
137,564 Personnel
and cleaned
20.5
20.5
20.5
20.5
20.5
2. Hours of street sweeper operation
1,500
1,500
1,500
1,500
1,500
3. Linear feet of curb and gutter
N/A
1,440
3,840
1,440
3,840
instal led/rep Iaced city wide
21,000
16,500
2,300
13,800
2,300
PERFORMANCE MEASURES
ACTUAL
FY 98/99
ACTUAL
FY 99/00
BUDGETED
FY 00/01
PROJECTED
FY 00/01
PROPOSED
FY 01/02
1. # of times city streets swept
BUDGET
ACTUAL
130,984
137,571
137,564 Personnel
annually
N/A
N/A
8.6
4
8.6
2. Cubic yards of debris prevented
from entering waterways
N/A
1,440
3,840
1,440
3,840
3. # of detention ponds maintained
14
15
18
18
18
DEPARTMENTAL BUDGET: STORMWATER DRAINAGE FUND
413,383 484,849 482,563
MAJOR BUDGET CHANGES/ISSUES:
02/03
01/02 ESTIMATED
ADOPTED BASE
206,037 206,037
390,376 393,988
596,413 600,025
The increased number of detention ponds in the City have caused maintenance costs to rise. Two additional
workers are added in 2001/02 to address the maintenance requirements of the City's drainage system
91
00/01
99/00
00/01
PROJECTED
ACTUAL
BUDGET
ACTUAL
130,984
137,571
137,564 Personnel
282,399
347,278
344,999 Operations
413,383 484,849 482,563
MAJOR BUDGET CHANGES/ISSUES:
02/03
01/02 ESTIMATED
ADOPTED BASE
206,037 206,037
390,376 393,988
596,413 600,025
The increased number of detention ponds in the City have caused maintenance costs to rise. Two additional
workers are added in 2001/02 to address the maintenance requirements of the City's drainage system
91
Georgetown Utility Systems
Transportation Services - Street Department
DEPARTMENT DESCRIPTION
The Street Department manages, maintains and repairs City streets and rights-of-way. Responsibilities include
traffic control, emergency response operations, special events, and assistance in code enforcement. Daily, the
department inspects roadways for sign repair, pavement management, and sight obstructions. The Street
Department participates with the Safety Manager to provide safety -training workshops.
MAJOR DEPARTMENT GOALS
Work with Williamson County Road and Bridge and Texas Department of Transportation to determine cost
sharing amounts on road improvements proposed within the City.
Protect the investment in the public transportation system through preventive maintenance and ongoing
rehabilitation of streets and sidewalks.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2000/2001
Created the Sidewalk Master Plan to provide guidance for sidewalk development.
Performed preventative maintenance on 37 lane miles of City streets extending the useful life of the
roadways.
Rehabilitated Main Street from 6'h to 9th improving streets and sidewalks on the downtown square.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2001/2002
Implement the Sidewalk Master Plan.
Perform maintenance upgrades to include:
• San Gabriel Park Roads;
• Airport from Lakeway to IH -35 frontage road;
• Old Town, mainly south of University Avenue;
• Between Business 35 and Lakeway Drive, and the San Jose, Riverhills and Spring Hollow
neighborhoods.
STREET DEPARTMENT
99/00
ACTUAL
00/01
BUDGET
00/01
ACTUAL
01/02
ADOPTED
02/03
PROJECTED
Transportation Services Manager
1
1
1
1
1
1
1
Streets Foreman
1
1
1
1
1
1
Heavy Equipment Operator/Crew Foreman
1
1
3
Heavy Equipment Operator
3
3
3
3
5
5
Light Equipment Operator
5
5
5
0
0
CIP Coordinator
Street Maintenance worker (P/T)
1
75
1
.75
1
.75
.75
.75
Total PT
12/.
.
12/75
11/.75
11/75
92
WORKLOAD MEASURES
ACTUAL
FY 98/99
ACTUAL
FY 99/00
BUDGETED
FY 00/01
PROJECTED
FY 00/01
PROPOSED
FY 01/02
1. Lane miles of sealcoated,
FY 98/99
FY 99/00
FY 00/01
FY 00/01
FY 01/02
overlayed or microsurfaced streets
33.5
32.00
33.5
33.5
33.5
2. Square feet of roadway patching
30,000
30,000
30,000
30,000
30,000
3. Traffic signs repaired/installed
200
200
200
275
275
4. Lane miles of streets maintained
335
335
335
335
335
5. Linear feet of sidewalk installed
1,773
300
2,900
2,896
2,900
DEPARTMENTAL BUDGET: GENERAL FUND
00/01
99/00 00/01 PROJECTED
ACTUAL BUDGET ACTUAL
02/03
01/02 ESTIMATED
ADOPTED BASE
415,460 434,048
ACTUAL
ACTUAL
BUDGETED
PROJECTED
PROPOSED
PERFORMANCE MEASURES
FY 98/99
FY 99/00
FY 00/01
FY 00/01
FY 01/02
1. % of streets seal coated
1.5%
1.5%
1.5%
1.5%
1.5%
2. % of streets overlayed
3%
3%
3%
3%
3%
3. % of streets microsurfaced
7%
7%
7%
7%
7%
DEPARTMENTAL BUDGET: GENERAL FUND
00/01
99/00 00/01 PROJECTED
ACTUAL BUDGET ACTUAL
02/03
01/02 ESTIMATED
ADOPTED BASE
415,460 434,048
434,005 Personnel
523,883
523,883
628,787 865,127
829,856 Operations
760,193
760,193
250,000
244,767 Capital
825,000
975,000
1,044,247 1,549,175
1,508,628
2,109,076
2,259,076
MAJOR BUDGET CHANGESIISSUES:
In 2002, over $600,000 of maintenance funds, including funding for seal coat, overlay and microsurfacing, were
moved to the Streets department from the Capital Improvements Program budget. The CIP Coordinator was also
transferred to Systems Engineering.
93
Georgetown Utility Systems
Water Services - Pump Maintenance
DEPARTMENT DESCRIPTION
The Pump Maintenance Department maintains booster and lift stations; city swimming pool pumps, motors, valves
and chlorine control systems; public water supply wells; water and wastewater service equipment. The
Maintenance shop is equipped with a Supervisory Control and Data Acquisition system (SCADA) to assist in
Operations & Maintenance activities. The Department shares workload with the Water/Wastewater Department
during peak times. Operators are on-call 24 hours a day to provide quality service. The Pump Maintenance
Department participates with the Safety Manager to provide safety training workshops. The Department also offers
tours of facilities and demonstrations to promote safety and conservation awareness.
MAJOR DEPARTMENT GOALS
• Operate and maintain all water/wastewater pumps motors, and facilities at peak operating efficiency.
• Operate and maintain all water production wells/pumps at the highest efficiency.
• Provide high quality service to our customers 24 hours a day with experienced well trained Water and
Wastewater system operators.
• Categorize a wastewater line mapping system and inspect all existing wastewater lines within a 5 -year period.
• Establish a safety -training program that will provide safety training to all departments within the GUS Division.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2000/2001
• Replaced #2 Pump at 15'h and Railroad Street Lift Station and eliminated sanitary sewer overflows.
• Rebuilt #1 and #7 Well Pumps and increased raw water supplies.
• Rebuilt #2 Booster Pump at Southside Booster and put new Leander Booster Station on line to maintain
existing water supplies to the west side of town.
• Completed Midway Lift Station Construction to Westinghouse Road.
• Rebuilt 3 blowers and motors at Dove Springs WWTP to maintain permit compliance.
• Installed a high capacity pump at Well #8 and increased irrigation supplies to Sun City.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2001/2002
• Implement a wastewater line mapping/categorizing system and begin an inspection program of all existing
wastewater lines.
• Begin operation of the Cimarron Hills lift station and wastewater treatment plant.
• Replace #4 pump control valve and rebuild #4 booster pump at the Southside Booster Station to increase
pumping capacity.
• Upgrade both lift pumps at Rock St. lift station and install high volume impellers and motor sheaves to handle
maximum daily demands of wastewater flows.
• Rebuild Pump #1 booster at the Sequoia Tank to restore water system capacity at Sequoia Trail West.
• Test 20% of wastewater lines annually to comply with TNRCC regulations.
PUMP MAINTENANCE
99/00
ACTUAL
00/01
BUDGET
00/01
ACTUAL
01/02
ADOPTED
02/03
PROJECTED
Pump Supervisor
1
1
1
1
1
1
1
Team Leader — Pumps
1
1
1
1
1
Pump Mechanic III
1
1
2
1
2
2
2
Pump Mechanic II
2
2
2
2
Pump Mechanic 1
Field Maintenance Worker (Seasonal — PM
2
.25
2
.25
.25
.25
.25
Total FT/P
7/.25
7/.25
7/.25
7/.25
7/.25
94
WORKLOAD MEASURES
ACTUAL
FY 98/99
ACTUAL
FY 99/00
BUDGETED
FY 00/01
PROJECTED
FY 00/01
PROPOSED
FY 01/02
1. Linear feet of wastewater lines
inspected by camera
28,000
15,000
20,000
17,000
20,000
2. Motor rebuilds & rewinds
23
20
15
15
15
3. Pump rehabilitations
25
18
25
20
15
4. H2S excursions
N/A
8
10
10
15
PERFORMANCE MEASURES
ACTUAL
FY 98/99
ACTUAL
FY 99/00
BUDGETED
FY 00/01
PROJECTED
FY 00/01
PROPOSED
FY 01/02
1. % of required testing of
wastewater lines completed
N/A
2%
5%
20%
20%
2. # of diagnostic tests performed
(pumps & motors)
N/A
5-6%
7-8%
8%
20%
3. % of lift stations checked daily
N/A
100%
100%
100%
100%
4. % of booster stations checked
daily
N/A
100%
100%
100%
100%
DEPARTMENTAL BUDGET: JOINT SERVICES FUND
00/01
99/00 00/01 PROJECTED
ACTUAL BUDGET ACTUAL
263,283 264,496 264,496
138,548 157,908 157,827
4,542
406,373 422,404 422,323
MAJOR BUDGET CHANGES/ISSUES:
02103
01/02 ESTIMATED
ADOPTED BASE
Personnel 285,888 285,888
Operations 165,597 165,597
Capital
451,485 451,485
The increase in wastewater line inspection is due to TNRCC regulations that require wastewater systems operated
within the Edward's Aquifer Recharge Zone to be inspected every five years.
The City's odor control program continues to require continuous monitoring at certain locations in the City. As the
wastewater system has grown, the need to monitor for hydrogen sulfide gas (1-12S) has increased throughout the
system. Pump Department personnel have taken responsibility to monitor and adjust the flow of chemicals to
mitigate the effects of H2S.
The City will develop an Industrial Pre -Treatment Program (IPP). The program is intended to verify that City
wastewater customers are in compliance with the current wastewater ordinance in terms of disposing of materials
into the wastewater system. The program is also a link to meeting the goals of the City's new wastewater permits,
recently issued by the TNRCC.
95
Georgetown Utility Systems
Water Services - Water Distribution
DEPARTMENT DESCRIPTION
The Water Distribution Department is responsible for routine inspection
of water distribution lines; installation of new water taps and meters;
rehabilitation and replacement of damaged or inefficient water lines,
meters, fire hydrants and valves. The Department performs water utility
locations and inspections for proper materials/methods. Staff advises
customers of non -City water problems, when discovered. The Water
Distribution Department takes routine water samples to test the safety
and efficiency of the system. The Department will continue to maintain
water system lines and equipment as well as continue to recognize,
follow, and meet all Environmental Protection Agency and Safe -
Drinking -Water Act regulations. The Water Department participates with the
Safety Manager to provide safety -training workshops, and with the
Building Inspection Department to ensure water system protection.
MAJOR DEPARTMENT GOALS
WATER LEAKS REPAIRED
sags 99M 00MI 01102'
• Ensure safe efficient delivery of water to the Georgetown Community.
• Maintain highest standard of water quality, meeting EPA and TNRCC standards.
• Minimize system losses due to aged infrastructure.
• Enhance customer service through efficient service.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2000/2001
Installed first phase of reuse water line at Georgetown Country Club to reduce use of treated water for
irrigation purposes.
Replaced 46 fire hydrants within the distribution system to increase fire flow protection.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2001/2002
Reduce current water loss rate by 5% by developing a leak detection program.
Decrease response rate to daily work orders to a minimum of 48 hours response time for all work orders.
Secure an annual maintenance contract to upgrade fire hydrants and defective services.
96
99/00
00/01
00/01
01/02
02/03
WATER DISTRIBUTION
ACTUAL
BUDGET
ACTUAL
ADOPTED
PROJECTED
Water Services Manager
1
1
1
1
1
Team Leader
1
1
1
2
2
Maintenance Worker II
1
1
1
1
1
Maintenance Worker 1
5
5
5
6
6
Total
8
8
8
10
10
96
DEPARTMENTAL BUDGET: WATER FUND
ACTUAL
ACTUAL
BUDGETED
PROJECTED
PROPOSED
WORKLOAD MEASURES
FY 98/99
FY 99/00
FY 00/01,
FY 00/01
FY 01/02
1. Water leaks repaired
395
485
595
700
600
2. Water taps installed
450
521
450
500
500
3. Line locations completed
975
4,900
1,400
2,000
2,000
4. Fire hydrant meters installed
105
60
120
150
150
DEPARTMENTAL BUDGET: WATER FUND
ACTUAL
ACTUAL
BUDGETED
PROJECTED
PROPOSED
PERFORMANCE MEASURES
FY 98/99
FY 99/00
FY 00/01
FY 00/01
FY 01/02
1. % reduction in work order call
ADOPTED
BASE
251,707
284,532
284,531 Personnel
backs
N/A
N/A
N/A
80%
10%
2. % contracted repairs
N/A
N/A
N/A
40%
10%
DEPARTMENTAL BUDGET: WATER FUND
MAJOR BUDGET CHANGES/ISSUES:
In 2001/02, a team leader and additional maintenance worker are added to assist in maintaining the growing
infrastructure of the system.
97
00/01
02/03
99/00
00/01
PROJECTED
01/02
ESTIMATED
ACTUAL
BUDGET
ACTUAL
ADOPTED
BASE
251,707
284,532
284,531 Personnel
389,477
393,466
395,017
420,286
420,244 Operations
423,510
419,410
146,585
108,000
108,000 Capital
108,000
108,000
793,309
812,818
812,775
920,987
920,876
MAJOR BUDGET CHANGES/ISSUES:
In 2001/02, a team leader and additional maintenance worker are added to assist in maintaining the growing
infrastructure of the system.
97
Georgetown Utility Systems
Water Services — Water Treatment
DEPARTMENT DESCRIPTION
The City of Georgetown operates four water treatment plants: the 7.5
MGD Lake Water Treatment Facility, the 5.45 MGD San Gabriel Park
Water Treatment Facility, the 0.5 MGD Berry Creek Facility, and the
3.0 MGD Southside Water Treatment Plant. The City of Georgetown
retains ownership of these plants and contracts for their operation with
a private contractor.
MAJOR DEPARTMENT GOALS
AVERAGE DAILY FLOW
WATER UTILITY CUSTOMERS
1..09a e0
13,so0 7s 9
7.08 710
13.000 7m
12.500 0
12.000 ee>
11,s0o en
11.000
10.soo e�
9899 91w OONI 01W
ee�CUMv� y-nww9eFM
• Provide a safe drinking water source for the Georgetown community.
• Stay abreast of changing regulations to meet the new drinking water standards.
• Continually upgrade the existing facilities to meet regulatory requirements, maintain quality service, and meet
the communities water -use needs.
• Operate facilities in a cost efficient manner to minimize water -usage rate increases.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2000/2001
Began operation of the Southside water treatment plant increasing treated water capacity.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2001/2002
Install turbidity monitors and upgrade the filter controllers at the San Gabriel Park water treatment plant to
maintain water quality.
Increase operator certification level and increase the number of dual certified operators to improve operational
efficiency.
98
WORKLOAD MEASURES
ACTUAL
FY 98/99
ACTUAL
FY 99/00
BUDGETED
FY 00/01
PROJECTED
FY 00/01
PROPOSED
FY 01/02
1. Water utility customers
11,570
12,038
13,000
13,100
13,500
2. Water usage (MGD):
N/A
N/A
$375
$372
$428
Average Flow
6.49
7.058
8.28
6.4
7.5
Peak Flow
13.11
12.5
13.28
15.3
15.5
Total Flow (MG)
2,370
2576
3,021
2,680
2,730
3. Water treated for Chisholm Trail
Special Utility District (MGD)
N/A
N/A
.200
.300
.300
DEPARTMENTAL BUDGET: WATER FUND
ACTUAL
ACTUAL
BUDGETED
PROJECTED
PROPOSED
PERFORMANCE MEASURES
FY 98/99
FY 99/00
FY 00101
FY 00/01
FY 01/02
1. Cost per million gallons treated
N/A
N/A
$375
$372
$428
2. % permit requirements met
N/A
N/A
95%
96%
97%
DEPARTMENTAL BUDGET: WATER FUND
MAJOR BUDGET CHANGES/ISSUES:
Variance relates to changes in allocations between the Water and Wastewater contracts for service.
99
00/01
02/03
99/00
00/01
PROJECTED
01/02
ESTIMATED
ACTUAL
BUDGET
ACTUAL
ADOPTED
BASE
950,740
1,281,520
1,281,520 Operations
946,620
946,620
950,740
1,281,520
1,281,520
946,620
946,620
MAJOR BUDGET CHANGES/ISSUES:
Variance relates to changes in allocations between the Water and Wastewater contracts for service.
99
Georgetown Utility Systems
Water Services - Water Contracts
The Water Utility transfers two percent of its gross billings to the General Fund. This transfer is a payment of
franchise fees which would have been payable to the General Fund from a non -City provider of such services.
Also included are allocated and shared administrative and support costs from other departments.
This department is also used to account for the contractual obligations not specific to any individual department of
the fund. Special Projects and Services include programs such as public education on water conservation, as well
as contracts and professional services.
This department also includes payments to the Brazos River Authority (BRA) for the City's surface water supply.
The City has water rights to 6,720 acre feet in Lake Georgetown and 15,488 acre feet in Lake Stillhouse Hollow,
and 6,944 acre feet for LCRA Alliance water. These water rights are expected to meet the needs of Georgetown's
current certificated water service area through full build out.
The City has entered into water supply agreements with Chisholm Trail Special Utility District (CTSUD) for 1.5
million gallons per day, and with Jonah Special Utility District for 1.0 million gallons per day
WATER CONTRACTS BUDGET: WATER FUND
00/01 02/03
99/00 00/01 PROJECTED 01/02 ESTIMATED
ACTUAL BUDGET ACTUAL ADOPTED BASE
150,000
240,000
124,770
AMR Maintenance
258,882
258,882
395,861
452,600
452,600
BRA - Water Purchases
1,243,952
1,343,307
178,704
157,000
170,100
Franchise Fee
187,160
194,810
156,495
179,146
155,354
General Fund Allocations
145,973
145,973
571,421
789,684
816,041
Joint Svc Allocations
1,039,570
1,039,570
488,030
134,865
119,200
Special Projects & Svcs
143,225
145,962
146,585
298,429
298,000
Capital
60,000
2,087,096
2,251,724
2,136,065
3,078,762
3,128,504
MAJOR BUDGET CHANGES/ISSUES:
The major variance in this department relates to the City's on-going negotiations with the Brazos River Authority
(BRA) for additional water rights through a regional alliance with other communities, as well as the BRA's
adjustment of the City's variable rates to the higher system -wide rate. The capital purchase in 2001 was the
contract for the City's new Customer Information System (CIS) and the integrated financial/human resources
systems. The installation will be completed in 2001/02.
100
�E OR G
� o
titi �
FD
This page intentionally left blank.
101
Georgetown Utility Systems
Water Services - Reuse Irrigation
DEPARTMENT DESCRIPTION
This department was created to manage the Irrigation Utility, which provides effluent and non -potable ground water
for large scale commercial irrigation customers. This department is managed through the Pumps Maintenance
Department.
MAJOR DEPARTMENT GOALS
• Promote use of effluent water supply for large volume irrigation needs.
• Conserve treated water usage.
• Reduce the demands of treatment plants for potable water.
• Reduce the cost of irrigation for large scale commercial customers.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2001/2002
Provide reuse water for Southwestern University to reduce the potable water demand.
Complete conversion of irrigation lines in San Gabriel Park from potable water to reduce cost for the City.
Expand the irrigation utility to Georgetown Country Club to increase treated water availability.
102
DEPARTMENTAL BUDGET: IRRIGATION FUND
99/00 00/01
ACTUAL BUDGET
00/01
PROJECTED
ACTUAL
0 0 0
MAJOR BUDGET CHANGES/ISSUES:
02/03
01/02 ESTIMATED
ADOPTED BASE
Operating 16,000 22,080
Franchise Fee 9,100 14,200
25,100 36,280
Expenses identified as irrigation operating costs during the 2001 utility rate study are shown here. Further costs
may be identified as the irrigation utility fully develops.
103
ACTUAL
ACTUAL
BUDGETED
PROJECTED
PROPOSED
WORKLOAD MEASURES
FY 98/99
FY 99/00
FY 00/01
FY 00/01
FY 01/02
1. # of irrigation customers
N/A
N/A
N/A
N/A
2
2. Gallons of reuse water pumped
N/A
N/A
N/A
N/A
0.4 MGD
DEPARTMENTAL BUDGET: IRRIGATION FUND
99/00 00/01
ACTUAL BUDGET
00/01
PROJECTED
ACTUAL
0 0 0
MAJOR BUDGET CHANGES/ISSUES:
02/03
01/02 ESTIMATED
ADOPTED BASE
Operating 16,000 22,080
Franchise Fee 9,100 14,200
25,100 36,280
Expenses identified as irrigation operating costs during the 2001 utility rate study are shown here. Further costs
may be identified as the irrigation utility fully develops.
103
ACTUAL
ACTUAL
BUDGETED
PROJECTED
PROPOSED
PERFORMANCE MEASURES
FY 98/99
FY 99/00
FY 00/01
FY 00/01
FY 01/02
1. Use of reuse water in lieu of
potable water (in gallons)
N/A
N/A
N/A
N/A
0.4 MGD
DEPARTMENTAL BUDGET: IRRIGATION FUND
99/00 00/01
ACTUAL BUDGET
00/01
PROJECTED
ACTUAL
0 0 0
MAJOR BUDGET CHANGES/ISSUES:
02/03
01/02 ESTIMATED
ADOPTED BASE
Operating 16,000 22,080
Franchise Fee 9,100 14,200
25,100 36,280
Expenses identified as irrigation operating costs during the 2001 utility rate study are shown here. Further costs
may be identified as the irrigation utility fully develops.
103
Georgetown Utility Systems
Water Services - Wastewater Collection
DEPARTMENT DESCRIPTION
The Wastewater Collection Department maintains and rehabilitates the
wastewater collection system, through routine inspections of system
facilities and restoration of broken or collapsed mains. The Department WASTEWATER TAPS INSTALLED
provides maintenance services including: the installation of wastewater
taps, the clearing, jet cleaning and camera inspection of lines, �
troubleshooting customer problems, and locating City wastewater lines. 4W
In addition, the Department performs preventive maintenance functions 3W
of the expanded collection system. This department coordinates with 2W
Building Inspection to ensure a safe and functioning wastewater 150
100
system.
0
aM aM 00J01 oiror
MAJOR DEPARTMENT GOALS
Maintain all public wastewater collection system lines in free-flowing condition to protect the public health and
environment.
Respond to customer requests regarding the collection system quickly and efficiently.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2000/2001
Completed Phase 1 of the Serenada wastewater project to meet annexation requirements.
Assisted in archeological assessment of Pecan Branch Wastewater Treatment Site.
Upgraded lines in Old Town to replace deteriorated lines.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2001/2002
• Reduce wastewater obstructions by 20% over the system, thus decreasing call for service through line
rehabilitation and replacement.
• Utilize studies for odor control and implement recommendations to benefit quality of life.
• Map all sewer lines, services and manholes in Old Town.
• Test all sewer facilities in system as required by State regulations.
WASTEWATER COLLECTION
99/00
ACTUAL
00/01
BUDGET
00/01
ACTUAL
01/02
ADOPTED
02/03
PROJECTED
Supervisor
1
1
1
1
1
Maintenance Worker III
1
1
1
1
1
Maintenance Worker II
1
1
1
1
1
Maintenance Worker 1
3
3
3
3
3
Maintenance Worker 1 (PT)
1
6/1
1
6/1
1
6/1
1
6/1
1
6/1
Total PT
1
1
1
104
WORKLOAD MEASURES
ACTUAL
FY 98/99
ACTUAL
FY 99/00
BUDGETED
FY 00/01
PROJECTED
FY 00/01
PROPOSED
FY 01/02
1. Sewer blockages cleared
165
200
324
300
300
2. Manholes repaired
6
5
6
10
10
3. Line locations completed
1,200
4,900
2,001
2,500
2,500
4. Wastewater taps installed
300
470
440
400
400
DEPARTMENTAL BUDGET: WASTEWATER FUND
ACTUAL
ACTUAL
BUDGETED
PROJECTED
PROPOSED
PERFORMANCE MEASURES
FY 98/99
FY 99/00
FY 00/01
FY 00/01
FY 01/02
1. % reduction in work order call
ADOPTED
BASE
203,577
197,105
197,016 Personnel
backs
N/A
N/A
N/A
80%
10%
2. % contracted repairs
N/A
N/A
N/A
40%
10%
DEPARTMENTAL BUDGET: WASTEWATER FUND
MAJOR BUDGET CHANGESASSUES:
This department began a project in 2001 through Capital Improvements Program funding to use cameras to inspect
all wastewater lines to be in compliance with state laws. This funding will take the project through the end of 2002
with on-going costs of $100,000 required in 2003.
105
00/01
02/03
99/00
00/01
PROJECTED
01/02
ESTIMATED
ACTUAL
BUDGET
ACTUAL
ADOPTED
BASE
203,577
197,105
197,016 Personnel
233,332
233,332
261,352
331,344
331,344 Operations
307,975
307,975
14,964
130,500
130,500 Capital
158,000
258,000
479,893
658,949
658,860
699,307
799,307
MAJOR BUDGET CHANGESASSUES:
This department began a project in 2001 through Capital Improvements Program funding to use cameras to inspect
all wastewater lines to be in compliance with state laws. This funding will take the project through the end of 2002
with on-going costs of $100,000 required in 2003.
105
Georgetown Utility Systems
Water Services - Wastewater Treatment
DEPARTMENT DESCRIPTION
The City of Georgetown operates three wastewater treatment plants: the
Dove Springs Wastewater Treatment Facility, rated at 1.25 million
gallons per day (MGD); the San Gabriel Wastewater Treatment Facility,
rated at of 2.5 MGD; and the Berry Creek Wastewater Treatment
Facility, rated at 100,000 gallons per day. The City of Georgetown
contracts with a private contractor to provide for the safe operation of the
wastewater plants. OMI conducts routine wastewater operations and
maintenance. The City continues to closely monitor and evaluate these
operations and retains ownership of the plants. The Pecan Branch
Wastewater Treatment Plant will be constructed in 2001/02 to provide
additional system capacity of 3.0 MGD to serve Sun City. The plant is
scheduled to begin operation in the summer of 2002.
AVERAGE DAILY FLOW
WASTEWATER UTILITY CUSTOMERS
�m
xsa D
6Poo <
� 9D9 a
.. 6,000 261
..000 2.6 9a0
sso
3 z.000 z a
o
9-9 99/00 OOA1 01=
=Cu
Operations will also begin on the wastewater treatment plant in the Cimarron Hills subdivision, which is outside the
City limits. The plant is being built through a Public Improvement District created by the developer and the City,
and will be fully owned by the City.
MAJOR DEPARTMENT GOALS
Meet regulatory requirements for effluent discharged from the wastewater facilities.
Operate all facilities in the most cost efficient manner possible while maintaining effluent quality.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2000/2001
Submitted water conservation application for effluent reuse to establish an Irrigation Utility.
Completed construction of the effluent pump station and storage tank for use by Irrigation Utility customers.
Installed bulk chemical storage for dechlorination to maintain TNRCC standards.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2001/2002
Begin operation of two additional wastewater treatment facilities (Pecan Branch and Cimarron Hills).
106
DEPARTMENTAL BUDGET: WASTEWATER FUND
00/01
99/00 00/01 PROJECTED
ACTUAL BUDGET ACTUAL
672,968 660,942 702,942 Operations
672,968 660,942 702,942
MAJOR BUDGET CHANGES/ISSUES:
02/03
01/02 ESTIMATED
ADOPTED BASE
1,220,420 1,481,384
1,220,420 1,481,384
Variance due to increases in cost of operations, as well as, changes in allocated costs between the Water and
Wastewater contracts.
107
ACTUAL
ACTUAL
BUDGETED
PROJECTED
PROPOSED
WORKLOAD MEASURES
FY 98/99
FY 99/00
FY 00/01
FY 00/01
FY 01/02
1. Wastewater utility customers
8,700
9,148
10,300
10,500
11,000
2. Average daily flow (MGD)
2.6
2.61
2.836
3.04
3.0
3. Peak daily flow (MGD)
5.0
8.0
9.7
8.9
9.5
4. Million gallons treated
949
954
1,035
1,108
1,100
DEPARTMENTAL BUDGET: WASTEWATER FUND
00/01
99/00 00/01 PROJECTED
ACTUAL BUDGET ACTUAL
672,968 660,942 702,942 Operations
672,968 660,942 702,942
MAJOR BUDGET CHANGES/ISSUES:
02/03
01/02 ESTIMATED
ADOPTED BASE
1,220,420 1,481,384
1,220,420 1,481,384
Variance due to increases in cost of operations, as well as, changes in allocated costs between the Water and
Wastewater contracts.
107
ACTUAL
ACTUAL
BUDGETED
PROJECTED
PROPOSED
PERFORMANCE MEASURES
FY 98/99
FY 99/00
FY 00/01
FY 00/01
FY 01/02
1. Cost per million gallons treated
N/A
N/A
$725'
$739'
$850'
2. % permit requirements met
N/A
N/A
95%
93%
95%
' Costs to be researched and updated
DEPARTMENTAL BUDGET: WASTEWATER FUND
00/01
99/00 00/01 PROJECTED
ACTUAL BUDGET ACTUAL
672,968 660,942 702,942 Operations
672,968 660,942 702,942
MAJOR BUDGET CHANGES/ISSUES:
02/03
01/02 ESTIMATED
ADOPTED BASE
1,220,420 1,481,384
1,220,420 1,481,384
Variance due to increases in cost of operations, as well as, changes in allocated costs between the Water and
Wastewater contracts.
107
Georgetown Utility Systems
Water Services - Wastewater Contracts
The Wastewater Utility transfers two percent of its gross billings to the General Fund. This transfer is a payment of
franchise fees which would have been payable to the General Fund from a non -City provider of such services.
Also included are allocated costs for shared administrative support.
This department is also used to account for the contractual obligations not specific to an individual department of
the fund.
WASTEWATER CONTRACTS BUDGET: WASTEWATER FUND
00/01 02/03
99/00 00/01 PROJECTED 01/02 ESTIMATED
ACTUAL BUDGET ACTUAL ADOPTED BASE
98,998
95,400
106,150
Franchise Fees
114,440
117,340
100,255
118,873
101,984
General Fund Allocations
92,133
92,133
666,106
574,412
594,570
Joint Svc Allocations
722,546
722,546
64,634
45,000
67,800
Spec. Svc / Legal
50,976
52,972
929,993
833,685
870,504
980,095
984,991
MAJOR BUDGET CHANGES/ISSUES:
108