HomeMy WebLinkAbout11-TransportationTransportation
The Transportation Division encompasses all aspects of transportation, including maintaining and repairing existing
streets, roads, and sidewalks, the planning and financing of existing roads and future proposed roads. This division
will also interact with Federal, State, and County agencies to meet the current and future transit, mobility, and
transportation needs of the community. The department works with other utilities to insure a collective effort for all
utility maintenance prior to beginning roadway maintenance or new construction. Rehabilitation and maintenance of
roadways are funded by both an approximate $1.25 million annual general fund transfer and an approximate $3.2
million annual 1/4 cent sales tax collected and assigned to street maintenance. The department assists in
coordinating transportation projects and related issues, as well as, to provide support to both the Georgetown
Transportation Enhancement Corporation (GTEC) and the Georgetown Transportation Advisory Board (GTAB).
This Division is funded in the General Fund and GTEC.
Transportation
Stormwater Drainage
Page 156
Administration
Page 154
Streets
Page 158
06/07 06/07 07/08 PROPOSED BUDGET
AMENDED PROJECTED NEW %
BUDGET ACTUAL BASE PROGRAMS TOTAL CHANGE
General Fund
Administration 185,567 128,768 314,335 (N/A)
Streets 2,640,862 2,520,494 2,861,605 27,000 2,888,605 (14.6%)
total General Fund 2,640,862 2,520,494 3,047,172 155,768 3,202,940 (27.1%)
Other Enterprise Funds
Stormwater Drainage 965,421 1,001,223 951,883 36,505 988,388 (-1.3%)
total Other Ent. Funds 965,421 1,001,223 951,883 36,505 988,388 (-1.3%)
Division Total 3,606,283 3,521,717 3,999,055 192,273 4,191,328 (19.0%)
PERSONNEL
SUMMARY
PERSONNEL OPERATING CAPITAL TOTAL (FTE's)
General Fund
Administration 306,405 7,930 314,335 3
Streets 786,830 851,775 1,250,000 2,888,605 15.75
total General Fund 1,093,235 859,705 1,250,000 3,202,940 18.75
Other Enterprise Funds
Stormwater Drainage 268,223 701,165 19,000 988,388 5.5
total Other Ent. Funds 268,223 701,165 19,000 988,388 5.5
Division Total 1,361,458 1,560,870 1,269,000 4,191,328 24.25
Uses & Expenses
Transportation
07/08 PROPOSED BUDGET
154
Transportation
Administration
DEPARTMENT DESCRIPTION
The Transportation Division encompasses all aspects of transportation, including maintaining and repairing existing
streets, roads, and sidewalks, the planning and financing of existing roads and future proposed roads, as well as,
stormwater management. This division also interacts with Federal, State, and County agencies to meet the current
and future transit, mobility, and transportation needs of the community. The Administration department works with
other utilities to insure a collective effort for all utility maintenance prior to beginning roadway maintenance or new
construction. Rehabilitation and maintenance of roadways are funded by both an approximate $1.25 million annual
general fund transfer and an approximate $3.5 million annual 1/4 cent sales tax collected and assigned to street
maintenance. The department assists in coordinating transportation projects and related issues, as well as, to
provide support to both the Georgetown Transportation Enhancement Corporation (GTEC) and the Georgetown
Transportation Advisory Board (GTAB).
MAJOR DEPARTMENT GOALS
• Provide efficient and effective Transportation systems that serve the community and reflect its values.
• Explore financing options for Capital Improvement Projects (CIP) and Transportation expenditures that
presently do not have a funding source.
• Identify and implement economical maintenance techniques for city roadway maintenance.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2007/2008
• Create Transportation Division to update 10-year Transportation Plan process for GTEC.
• Hire Division Director to oversee new transportation projects, boards, and work with other governmental
agencies, as well as, to provide oversight to the City’s transportation and stormwater drainage systems within
the division.
• Develop and implement a traffic management plan.
• Assume responsibility for signalization of traffic lights within the city.
• Incorporate transportation organizational functions to enhance mobility within the city.
• Review administrative structure to ensure divisional needs are met.
• Evaluate costs for Traffic Signal Control and needed upgrades.
• Develop plan to assume respo9nsibility for signalization of traffic lights within the city, with expected
implementation before 2010. (Policy 9 / Priority B)
155
TRANSPORTATION
ADMINISTRATION
05/06
ACTUAL
06/07
ORIGINAL
BUDGET
06/07
FINAL /
ACTUAL
07/08
ADOPTED
08/09
PROPOSED
Transportation Director 0 0 0 1 1
Transportation Engineer 0 0 0 1 1
Project Manager 0 0 0 1 1
TOTAL 0 0 0 3 3
WORKLOAD MEASURES
ACTUAL
FY 04/05
ACTUAL
FY 05/06
BUDGETED
FY 06/07
PROJECTED
FY 06/07
PROJECTED
FY 07/08
1. Number of traffic signals N/A N/A N/A 3 1
2. Number of lane-miles N/A N/A N/A 529 540
3. Number of Transportation CIP
projects
N/A
N/A
N/A
8
6
PERFORMANCE MEASURES
ACTUAL
FY 04/05
ACTUAL
FY 05/06
BUDGETED
FY 06/07
PROJECTED
FY 06/07
PROJECTED
FY 07/08
1. % of projects completed within
budget
N/A
N/A
N/A
100%
100%
2. % of projects completed on
schedule
N/A
N/A
N/A
100%
100%
3. % of customers reporting
noticeable traffic improvement
N/A
N/A
N/A
60%
60%
DEPARTMENTAL BUDGET: GENERAL FUND
MAJOR BUDGET CHANGES/ISSUES:
2007/08 is the first year for this department. Previously, this function was included in Georgetown Utility Systems
(GUS).
06/07 08/09
05/06 06/07 PROJECTED 07/08 ESTIMATED
ACTUAL BUDGET ACTUAL ADOPTED BASE
Personnel 306,405 306,405
Operations 7,930 4,800
Capital
314,335 311,205
156
Transportation
Stormwater Drainage
DEPARTMENT DESCRIPTION
The Stormwater Drainage Utility addresses environmental concerns over
in-stream water quality, regulatory demands related to stormwater run-
off controls, infrastructure operation and maintenance, and
drainage/flood control related capital project needs. Other duties include
sign maintenance for the Street Department and assisting Police and
Fire Services on Code Enforcement issues.
MAJOR DEPARTMENT GOALS
• Utilize the Regional Stormwater Master Plan (RSMP) by building detention ponds and upgrading waterways as
needed within the city.
• Comply with Stormwater regulations.
• Reduce the threat of property damage and personal injury, and enhance public safety through proper
maintenance and operation of the city’s drainage system.
• Improve the cleanliness and appearance of the community through the sweeping of city streets.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2006/2007
• Constructed drainage structures along Railway to help alleviate flooding between 17th and Church Street.
• Began construction of two large water quality ponds serving the downtown area.
• Constructed drainage improvements at 18th and Pine to alleviate street flooding and improve appearance of
area.
• Began rehabilitation of historic retaining wall in San Gabriel Park.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2007/2008
• Develop and implement a on-going stormwater maintenance program that meets impending federal
regulations. (Pollution Prevention Plan)
• Contract engineering services to design the Maple Street culvert improvements and receive environmental
clearance.
• Design and install protective erosion control on the north bank of the San Gabriel River to prevent further
damage to the river banks and park land.
• Replace Oak Tree Drive low water bridge in Berry Creek to insure proper drainage and improve safety.
DETENTION PONDS MAINTAINED
0
5
10
15
20
25
03/04 04/05 05/06 06/07 *07/08
*Projected
157
STORMWATER DRAINAGE
05/06
ACTUAL
06/07
ORIGINAL
BUDGET
06/07
FINAL /
ACTUAL
07/08
ADOPTED
08/09
PROPOSED
Drainage Foreman 0 0 0 1 1
Light Equipment Operator 0 0 0 1 1
Heavy Equipment Operator 0 0 0 1 1
Street Sweeper Operator 0 0 0 1 1
Sign & Field Technician 0 0 0 1 1
Crewman I (P/T) 0 0 0 0.5 0.5
TOTAL (FT/PT) 0 0 0 5/.5 5/.5
WORKLOAD MEASURES
ACTUAL
FY 04/05
ACTUAL
FY 05/06
BUDGETED
FY 06/07
PROJECTED
FY 06/07
PROJECTED
FY 07/08
1. Miles of public right-of-way mowed
and cleaned
20.5
25
36
36
36
2. Hours of street sweeper operation 1,500 1,500 1,600 1,600 1,600
3. Linear feet of curb and gutter
installed/replaced city wide
11,467
19.672
25,000
16,575
17,800
PERFORMANCE MEASURES
ACTUAL
FY 04/05
ACTUAL
FY 05/06
BUDGETED
FY 06/07
PROJECTED
FY 06/07
PROJECTED
FY 07/08
1. # of times city streets swept
annually
7
7
8
8
8
2. Cubic yards of debris prevented
from entering waterways
1,350
1,250
1,350
1,600
1,600
3. # of detention ponds maintained 5 23 23 34 34
DEPARTMENTAL BUDGET: STORMWATER DRAINAGE FUND
MAJOR BUDGET CHANGES/ISSUES:
06/07 08/09
05/06 06/07 PROJECTED 07/08 ESTIMATED
ACTUAL BUDGET ACTUAL ADOPTED BASE
240,025 263,318 261,616 Personnel 268,223 268,464
625,235 698,388 698,384 Operations 701,165 680,129
3,715 41,223 Capital 19,000
865,260 965,421 1,001,223 988,388 948,593
158
Transportation
Street Department
DEPARTMENT DESCRIPTION
The Street department manages, maintains and repairs City streets and rights-of-way. Responsibilities include
traffic control, emergency response operations, special events, and assistance in code enforcement. Daily, the
department inspects roadways for sign repair, pavement management, and sight obstructions. The Street
department participates with the Safety Committee to provide safety-training workshops. The department also
oversees the management of revenues collected through the City’s ¼ cent sales tax for street maintenance.
MAJOR DEPARTMENT GOALS
• Continue work with Federal, State and County entities, adjoining municipalities, other departments and the
public to update and maintain a Comprehensive Transportation Plan with special attention to:
• Development of a plan to connect Northwest Boulevard to Austin Avenue.
• Development of a plan for the intersection at Del Webb Boulevard and Williams Drive.
• Protect the investment in the public transportation system through preventive maintenance and on-going
rehabilitation of streets and sidewalks.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2006/2007
• Rehabilitated the following proposed roadways using the ¼ Cent Sales Tax and General Fund:
• 16th Street (Virginia to Vine)
• 17th Street (Annie Purl to Hutto Rd)
• 16th Street (College to Ash)
• Ash Street (15th to 18th)
• College Street (12th to 18th)
• 18th Street (Myrtle to College)
• 10th Street (Bridge to MLK)
• Mimosa (16th to 18th)
• 16th Street (Hutto to Barcus)
• Park Lane (Central to Clay)
• Central Ave. (Park Ln. to Clay)
• Assumed maintenance responsibility for Austin Avenue from the Texas Department of Transportation (TxDOT).
• Expanded signal control from one to 7 signals.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2007/2008
• Work with the Georgetown Transportation Advisory Board (GTAB) to identify possible funding sources for
transportation improvement projects.
• Assist in development of a Transportation Division and restructuring of the Streets and Drainage department
identifying a signs, signals and traffic department.
• Continue implementation of maintenance programming identified by the recently implemented pavement
management system. List of Projects to include:
• 15th Street (Hart to Scenic)
• Leander street (22nd to 17th)
• Northwest Blvd. (Northwood to Hedgewood)
• San Gabriel Heights Subdivision
• Sierra Vista Subdivision
• Berry Creek (Section One < Airport Rd. to Oak Tree)
• Conduct second evaluation of over all pavement condition.
• Implement a change of focus for the 1/4 cent sales tax for street maintenance from rehabilitative to
preventative maintenance. (Policy 9 / Priority A)
159
STREETS DEPARTMENT
05/06
ACTUAL
06/07
ORIGINAL
BUDGET
06/07
FINAL /
ACTUAL
07/08
ADOPTED
08/09
PROPOSED
Transportation Services Manager 0 0 0 1 1
Streets Superintendent 0 0 0 1 1
Streets Foreman 0 0 0 1 1
Light Equipment Operator 0 0 0 8 8
Heavy Equipment Operator 0 0 0 4 4
Patching Crew 0 0 0 0 0
Street Maintenance Worker (P/T) 0 0 0 0.75 0.75
TOTAL (FT/PT) 0 0 0 15/.75 15/.75
WORKLOAD MEASURES
ACTUAL
FY 04/05
ACTUAL
FY 05/06
BUDGETED
FY 06/07
PROJECTED
FY 06/07
PROJECTED
FY 07/08
1. Lane miles of seal coated,
overlayed or microsurfaced streets
33.5
7
10
7
10
2. Square feet of roadway patching 30,000 32,000 35,000 35,000 35,000
3. Traffic signs repaired/installed 350 500 600 1,200 1,200
4. Lane miles of streets maintained 385 425 490 529 540
5. Linear feet of sidewalk installed 300 500 3,000 2,800 2,800
PERFORMANCE MEASURES
ACTUAL
FY 04/05
ACTUAL
FY 05/06
BUDGETED
FY 06/07
PROJECTED
FY 06/07
PROJECTED
FY 07/08
1. % of streets seal coated 1.5% 1.0% 2.0% 1.5% 1.5%
2. % of streets overlayed 2% 2% 4% 2% 2%
3. PCI** adopted for GASB 34 N/A N/A 90% 90% 90%
** PCI = Pavement Condition Index
DEPARTMENTAL BUDGET: GENERAL FUND
MAJOR BUDGET CHANGES/ISSUES:
06/07 08/09
05/06 06/07 PROJECTED 07/08 ESTIMATED
ACTUAL BUDGET ACTUAL ADOPTED BASE
587,346 738,701 738,688 Personnel 786,830 787,385
653,916 760,806 760,806 Operations 851,775 829,775
255,369 1,141,355 1,021,000 Capital 1,250,000 1,250,000
1,496,631 2,640,862 2,520,494 2,888,605 2,867,160