The Community Development Division is dedicated to the shared vision of a well-planned Georgetown by working
in partnership with the community, building on our heritage and providing service through a customer friendly
process. This Division includes all Planning and Inspection functions.
This Division is funded through the General Fund.
05/06 07/08
04/05 05/06 PROJECTED ESTIMATED
ACTUAL BUDGET ACTUAL BASE
Code Enforcement 393,815 363,472 338,508 410,946 (21.4%)420,736
Building Inpections 666,685 746,880 746,880 819,222 (9.7%)800,288
Current Planning 735,522 855,679 796,835 870,042 (9.2%)844,527
Long Range Planning 211,521 427,551 427,551 549,089 (28.4%)357,195
Mapping Fund 24,486 46,028 46,052 69,163 (50.2%)36,388
Division Total 2,032,029 2,439,610 2,355,826 2,718,462 (15.4%)2,459,134
* Percent change of 06/07 Adopted from 05/06 Projected Actual
(% Change*)
Community Development
06/07
ADOPTED
Operations
29%
Personnel
71%
870,042
819,222
549,089
410,946
69,163
0 150,000 300,000 450,000 600,000 750,000 900,000
Mapping Fund
Code Enforcement
Long Range
Planning
Building Inpections
Current Planning
PERSONNEL SUMMARY
04/05
ACTUAL
05/06
ORIGINAL
BUDGET
05/06
FINAL /
ACTUAL
06/07
ADOPTED
07/08
ADOPTED
Code Enforcement 5/.5 5/.5 5/.5 6 6
Building Inspections 11 11 11 11 11
Current Planning 10 10 9 10 10
Long Range Planning 3 3 4 4 4
TOTAL 29/.5 29/.5 29/.5 31 31
52
Community Development
Inspection Services
Code Enforcement
DEPARTMENT DESCRIPTION
Code Enforcement department was integrated into Inspection Services
to create efficiency and provide better customer response for the
enforcement of adopted land use and development codes. Code
Enforcement's goal is to ensure quality and safe land use through the
enforcement of fire, building, nuisance and Unified Development Codes
and ordinances.
MAJOR DEPARTMENT GOALS
• Promote a positive image to the community by bringing services to the neighborhoods and soliciting community
involvement.
• Maintaining a comprehensive public education program designed to increase awareness, provide information,
and change behavior in order to manage natural hazards in the community.
• Ensure that quality and safe land use is maintained through integrative code enforcement activity within the
adopted ordinances.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2005/2006
• Implemented the 2003 International Fire Code and the International Property Maintenance Code.
• Implemented portable laptop computers for added efficiency in code enforcement field work.
• Continued code enforcement training with the Unified Development Code and additional ordinances within
Inspection Services and Community Development.
• Initiated the review of the existing nuisance codes for future update.
• Continued code enforcement in all areas of the present adopted codes in conjunction with the continued growth
of the city.
• Continued the research of the Natural Landscape Program.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2006/2007
• Continue the review of present adopted nuisance codes and ordinances for updating and re-adoption.
• Develop a more comprehensive strategy to improve the City’s image by reducing the amount of dangerous
buildings through the Dangerous Building ordinance.
• Enhance the program for routine fire inspections to achieve 100% commercial coverage annually.
• Implement a comprehensive strategy for community wide property maintenance enforcement. (Policy 2/Priority A)
• Improve the City’s image and public relations by increasing the number of code violations by 100% through
aggressive code enforcement.
• Study the feasibility of implementing a rental property inspection program.
CODE ENFORCEMENT VIOLATIONS
3,266
1,948 1,989
11,187 11,200
6,500
0
2,000
4,000
6,000
8,000
10,000
12,000
01/02 02/03 03/04 04/05 05/06 *06/07
*Projected
53
CODE ENFORCEMENT
04/05
ACTUAL
05/06
ORIGINAL
BUDGET
05/06
FINAL /
ACTUAL
06/07
ADOPTED
07/08
PROPOSED
Chief Code Enforcement Officer 1 1 1 1 1
Code Enforcement Officer 3 3 3 3 3
Fire Code Inspector 1/.5 1/.5 1/.5 2 2
TOTAL 5/.5 5/.5 5/.5 6 6
WORKLOAD MEASURES
ACTUAL
FY 03/04
ACTUAL
FY 04/05
BUDGETED
FY 05/06
PROJECTED
FY 05/06
PROJECTED
FY 06/07
1. Education presentations 175 185 190 188 190
2. Abandoned vehicle abatements 75 75 75 70 70
3. # of Code Enforcement
violations
1,989
11,187
5,000
11,200
6,500
5. # of inspections performed 1,365 1,053 1,800 1,500 1,800
6. # of children involved in “Risk
Watch”
7. Abatements
8. Certified Letters
9. Fire Code Development Plan and
Code review
N/A
14
100
N/A
2,800
22
103
N/A
2,700
20
115
120
2,523
15
120
300
0
20
150
300
PERFORMANCE MEASURES
ACTUAL
FY 03/04
ACTUAL
FY 04/05
BUDGETED
FY 05/06
PROJECTED
FY 05/06
PROJECTED
FY 06/07
1. % of Code Enforcement cases
processed within 2-7 days
2. Avg. # of cases per day
3. Avg. # of Fire Prevention
Inspections processed within 5
working days
N/A
N/A
N/A
N/A
N/A
N/A
85%
120
50
45%
110
52
65%
120
50
DEPARTMENTAL BUDGET: GENERAL FUND
MAJOR BUDGET CHANGES:
A Fire Code Inspector is upgraded from part-time to full-time in 2006/07.
05/06 07/08
04/05 05/06 PROJECTED 06/07 ESTIMATED
ACTUAL BUDGET ACTUAL ADOPTED BASE
294,551 289,835 264,871 Personnel 342,988 352,778
99,264 73,637 73,637 Operations 67,958 67,958
393,815 363,472 338,508 410,946 420,736
54
Community Development
Inspection Services
Building Inspections
DEPARTMENT DESCRIPTION
Inspection Services issues building construction permits and performs
inspections leading to the final Certificate of Occupancy (CO). This
department assists in the coordination between the City and the
construction industry with plan review, permitting and on-site
inspections. Inspection Services ensures that the construction phase of
the development process meets the expectations of the community for
the overall public health, safety and welfare through the administration
and implementation of applicable City codes and ordinances. This
department is also responsible for flood plain administration and review,
according to the regulations established by the Federal Emergency
Management Agency (FEMA).
MAJOR DEPARTMENT GOALS
• Ensure quality and safe housing through consistent administration of building code requirements.
• Promote a cooperative effort with the building community to provide long-lasting, quality structures and
encourage use of the most current building codes for the community to reduce insurance rates for the public.
• Promote the use of automated technology in the permit and inspection areas to streamline processes and
reduce costs.
• Ensure that special flood hazard areas are not impacted by development activities through the use of
Floodplain Management.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2005/2006
• Implemented the 2003 International Building Codes.
• Implemented the 2002 National Electrical Code and electrical registration requirements.
• Regulated construction in special flood hazard areas through the Flood Damage Prevention Ordinance.
• Maintained an acceptable level of service while experiencing an increase in construction activity of both
residential and commercial.
• Issued over 900,000 sq. ft. in non-residential building permits, including Wolf Ranch, Rivery and Tasus.
• Researched and assisted in the adoption of amendments for signs to the Unified Development Code.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2006/2007
• Continue to research workflow processes, development tracking and technological systems for construction
permitting and inspections to increase efficiency and reduce cost for all users.
• Conduct a public forum and ongoing educational sessions with developers and construction contractors to
review the permitting and inspection process, especially to assist in the area of affordable housing.
• Initiate a pubic review process for the adoption of the 2006 International and 2005 National Electrical Codes.
• Develop a program for obtaining miscellaneous permits for appliance replacement and repair with random/spot
inspections through the use of coupon books.
• Update the current Flood Insurance Rate Maps in coordination with Federal Emergency Management Agency
(FEMA), a division of Homeland Security.
BUILDING PERMITS
0
50,000,000
100,000,000
150,000,000
200,000,000
250,000,000
01/02 02/03 03/04 04/05 05/06 *06/07
Co
n
s
t
r
u
c
t
i
o
n
V
a
l
u
e
100
300
500
700
900
1,100
P
e
r
m
i
t
s
Value Permits *Projected
55
BUILDING INSPECTIONS 04/05
ACTUAL
05/06
ORIGINAL
BUDGET
05/06
FINAL /
ACTUAL
06/07
ADOPTED
07/08
PROPOSED
Inspection Services Director 1 1 1 1 1
Chief Building Inspector 1 1 1 1 1
Chief Plans Examiner 0 0 1 1 1
Combination Building Inspector 6 6 5 5 5
Permit Technician 2 2 2 2 2
Building Plans Examiner 1 1 1 1 1
TOTAL 11 11 11 11 11
WORKLOAD MEASURES
ACTUAL
FY 03/04
ACTUAL
FY 04/05
BUDGETED
FY 05/06
PROJECTED
FY 05/06
PROJECTED
FY 06/07
1. New Residential permits issued
Construction evaluation total
901
$166,395,702
930
$177,066,810
700
$140,000,000
1100
$200,000,000
960
$190,000,000
2. New Commercial, Industrial,
Tenant Finish Out (TFO) and
Remodel permits issued
Construction evaluation total
84
$39,783,258
132
$61,530,923
70
$39,389,246
140
$101,280,583
70
$41,000,000
3. Permitted non-residential sq. ft. 1,073,766 1,163,549 900,000 1,343,000 900,000
4. All other building permit types
Construction evaluation total
4,932
$7,625,105
4,965
$13,922,378
4,950
$14,500,000
5,000
$14,050,000
5,000
$14,500,050
5. Total # of inspections performed,
including Commercial, Residential
and all others
28,389
39,677
26,000
40,000
42,000
PERFORMANCE MEASURES
ACTUAL
FY 03/04
ACTUAL
FY 04/05
BUDGETED
FY 05/06
PROJECTED
FY 05/06
PROJECTED
FY 06/07
1. % of residential plans processed
within 10 days
97%
98%
98%
98%
98%
2. % of commercial plans processed
within 30 days
85%
90%
92%
92%
90%
3. % of inspections performed within
2 days
4. Avg # of inspections per day
5. Avg # of inspections per inspector
per working day
99%
110
17
93%
155
26
99%
160
27
98%
187
31
99%
170
28
DEPARTMENTAL BUDGET: GENERAL FUND
MAJOR BUDGET CHANGES/ISSUES:
Funds for contract inspections have been added in 2006/07 to better manage workload.
05/06 07/08
04/05 05/06 PROJECTED 06/07 ESTIMATED
ACTUAL BUDGET ACTUAL ADOPTED BASE
567,768 618,435 618,435 Personnel 654,892 675,958
98,917 128,445 128,445 Operations 164,330 124,330
666,685 746,880 746,880 819,222 800,288
56
Community Development
Current Planning
DEPARTMENT DESCRIPTION
The Current Planning section implements the development process with
the goal of ensuring quality land development for the future of Georgetown
and preservation of the community’s unique historic and environmental
features. The process includes providing public information, review and
recommendation on development applications, preparation of reports, and
participation in meetings of the City Council, Planning and Zoning
Commission, Historic and Architectural Review Commission (HARC) and
Zoning Board of Adjustment.
MAJOR DEPARTMENT GOALS
• Provide sound and timely advice to internal and external customers regarding the current planning process,
development regulations, and best development land use planning principles.
• Continuously seek input into the current planning process from key stakeholders, including real estate
developers, other government agencies, and utility providers.
• Support the implementation of a quality growth strategy which seeks to balance economic expansion, the
effective stewardship of natural resources, and quality of life concerns.
• Promote quality growth that enhances rehabilitation and preservation of historic structures.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2005 / 2006
• Continued site plan reviews for the Simon / Wolf Ranch and Rivery Developments.
• Completed annual amendments to the Unified Development Code (UDC).
• Completed Landscape Plan revision as part of the UDC amendment process.
• Processed the 8th Amendment to the Sun City Development Agreement
• Issued Certificates of Design Compliance for River Place, Library, Gold’s Department Store Building, Sunstar
Plaza and the Monument Cafe.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2006/2007
• Work closely with all stakeholders involved in the revitalization efforts for the Williams Drive Gateway
redevelopment project.
• Create development regulations to implement the Transit Oriented Development, Mixed Use and Williams Drive
Gateway land use categories. (Policy 4/Priority C)
• Continue work with the major stakeholders in the development of the Rivery Town Center, Wolf Ranch, Cowan
Springs and Sun City developments.
• Develop a Conservation Subdivision ordinance to promote community well-being and uniqueness through well-
planned land use and preservation of natural features.
• Develop and implement Historic Tax Exemption Program.
NEW LOTS PLATTED
0
200
400
600
800
1,000
02/03 03/04 04/05 05/06 *06/07
Single-Family Non-Single Family *Projected
57
CURRENT PLANNING
04/05
ACTUAL
05/06
ORIGINAL
BUDGET
05/06
FINAL /
ACTUAL
06/07
ADOPTED
07/08
PROPOSED
Planning Director 1 1 1 1 1
Administrative Assistant III 1 1 1 1 1
Staff Assistant 1 1 0 0 0
Planning Specialist 2 2 2 2 2
Planner III 0 0 0 1 1
Planner II 3 3 3 3 3
Planner I 2 2 2 2 2
TOTAL 10 10 9 10 10
WORKLOAD MEASURES
ACTUAL
FY 03/04
ACTUAL
FY 04/05
BUDGETED
FY 05/06
PROJECTED
FY 05/06
PROJECTED
FY 06/07
1. Preliminary plat applications 27 24 25 31 30
2. Final plat applications 27 30 25 57 30
3. Site plans 37 39 40 50 40
4. Variances to Board of Adjustment 19 14 15 16 15
5. Rezoning applications 21 32 20 57 35
6. # of new lots platted
Residential
Commercial
837
37
888
37
650
25
936
39
900
30
PERFORMANCE MEASURES
ACTUAL
FY 03/04
ACTUAL
FY 04/05
BUDGETED
FY 05/06
PROJECTED
FY 05/06
PROJECTED
FY 06/07
Final decision consistent with staff
recommendation:
1. Variances 90% 90% 90% 90% 90%
2. Zoning Map Amendments 90% 85% 85% 95% 95%
3. % Site plans approved
administratively
67%
70%
70%
100%
100%
4. % Council approval of P&Z plat
recommendations
100%
100%
100%
100%
100%
DEPARTMENT BUDGET: GENERAL FUND
MAJOR BUDGET CHANGES/ISSUES:
A Planner III position is added in 2006/07 for workload management.
05/06 07/08
04/05 05/06 PROJECTED 06/07 ESTIMATED
ACTUAL BUDGET ACTUAL ADOPTED BASE
536,752 598,015 539,171 Personnel 667,231 686,437
198,770 251,314 251,314 Operations 202,811 158,090
0 6,350 6,350 Capital
735,522 855,679 796,835 870,042 844,527
58
Community Development
Long Range Planning
DEPARTMENT DESCRIPTION
The Long Range Planning section is responsible for guiding the City’s long range planning efforts and the
implementation of the Century Plan, the City’s comprehensive plan for future growth and development. This
department also provides census and demographic information, in addition to growth and development information
to the community for projecting population, building, and development trends and impacts. In accordance with
growth management policies established by the comprehensive plan and the Council, the Long Range Planning
Department develops annexation policies and an annexation plan for the orderly growth of the city. The
department has developed a Geographic Information System (GIS) program as a planning tool for the Division, and
is leading the effort for City-wide implementation. This department also manages the City’s mapping special
revenue fund.
MAJOR DEPARTMENT GOALS
• Promote growth management strategies to guide the City’s land use, transportation, infrastructure, and
economic development decisions that will provide long-term quality of life.
• Provide long range planning perspective for annexation and extra-territorial jurisdiction development.
• Provide current information of demographic and development trends to project growth and plan for the
projected, future needs of the community.
• Provide leadership in the implementation of the GIS Plan.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2005/2006
• Initiated the Comprehensive Plan update process through consultant selection and contract negotiation.
• Amended the Overall Transportation Plan (OTP) Transportation Improvement Program process to work through
the Georgetown Transportation Advisory Board and created the Georgetown Transportation Enhancement
Corporation (GTEC) Board CIP Process.
• Coordinated inclusion of OTP model and road network into the approved Capital Area Metropolitan Planning
Organization (CAMPO) 2030 Plan.
• Worked to implement Year I of the revised Georgetown GIS Plan, to guide further development of the City’s
Geographic Information System.
• Completed Aerial Photography update.
• Completed Involuntary Annexation Process which brought an additional 4,870 acres into the City.
• Continued to work on ETJ agreements with neighboring jurisdictions.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2006/2007
• Manage consultant selected to update the transportation model and assist in the implementation of the OTP.
• Complete update of the City’s Comprehensive Plan with focus on Policy Plan and Future Land Use Plan in
2006/07 and create framework for overall plan update.
• Monitor and participate in regional planning efforts through the Austin-San Antonio Corridor Council, CAMPO,
Capital Area Planning Council of Governments (CAPCOG and Williamson County.
• Implement new GIS Plan: “Phase Two – Moving Toward Enterprise GIS”, including aerial photography update.
(Policy 1/Priority D)
• Complete process for involuntary annexation of approximately 5,000 acres in various locations contiguous to
the current city limits.
59
LONG RANGE PLANNING
04/05
ACTUAL
05/06
ORIGINAL
BUDGET
05/06
FINAL /
ACTUAL
06/07
ADOPTED
07/08
PROPOSED
Principal Planner 1 1 1 1 1
GIS Coordinator 1 1 1 1 1
GIS Technician 1 1 1 1 1
Planner I 0 0 1 1 1
TOTAL 3 3 4 4 4
WORKLOAD MEASURES
ACTUAL
FY 03/04
ACTUAL
FY 04/05
BUDGETED
FY 05/06
PROJECTED
FY 05/06
PROJECTED
FY 06/07
1. Century Plan amendments
processed
8
12
10
12
10
2. Annexation petitions 10 10 8 12 8
3. Acres annexed 721 665 400 5,100 5,500
4. New GIS data layers placed on
distribution drive
25
20
20
25
20
PERFORMANCE MEASURES
ACTUAL
FY 03/04
ACTUAL
FY 04/05
BUDGETED
FY 05/06
PROJECTED
FY 05/06
PROJECTED
FY 06/07
1. Century Plan amendments
completed
114%
171%
100%
120%
100%
2. Annexation petitions processed 200% 250% 100% 150% 100%
3. Total GIS data sets on network 75 95 115 120 140
DEPARTMENTAL BUDGET: GENERAL FUND
MAJOR BUDGET CHANGES/ISSUES:
A Planner I position was added at Mid year 2005 to assist in long-range planning efforts.
05/06 07/08
04/05 05/06 PROJECTED 06/07 ESTIMATED
ACTUAL BUDGET ACTUAL ADOPTED BASE
168,720 208,617 208,617 Personnel 257,264 265,370
42,801 218,934 218,934 Operations 291,825 91,825
211,521 427,551 427,551 549,089 357,195