HomeMy WebLinkAbout10-Georgetown Utility SystemsGeorgetown
Utility
Systems
Georgetown Utility Systems consists of Administration, Energy Services (Electric and AMR), Transportation
Services (Streets and Stormwater Drainage), Systems Engineering, Water Services (Pump Maintenance,
Wastewater Collection, Water Distribution, Reuse Irrigation and Wastewater and Water Treatment). This division
constructs, maintains, and operates the City’s utility infrastructure. The Division is responsible to maintain positive
working relationships with outside organizations including the Texas Commission on Environmental Quality
(formerly the Texas Natural Resources Conservation Commission) and the Texas Department of Transportation.
The Division also coordinates contracts with the private sector. This Division also oversees and coordinates the
“Safe Place” children’s program.
Operational funding for this division comes from the General Fund (Streets), Joint Services Fund (Administration),
Stormwater Drainage Fund, Electric Fund and Water Services Fund.
Georgetown Utility Systems
Transportation Services
Stormwater Drainage
Page 116
Streets
Page 118
Water Services
Energy Services
Electric
Page 108
SCADA - AMR
Page 112
Systems Engineering
Page 114
Wastewater
Page 120
Water
Page 122
Administration
Page 106
79
Georgetown Utility Systems
25,381,689
6,867,990
843,177
1,403,345
1,975,792
2,631,294
3,579,292
0 2,000,000 4,000,000 6,000,000 8,000,000 10,000,000
Stormwater
*Support
Streets
Electric Ops
Wastewater Ops
Water Ops
Electric Contracts
03/04 05/06
02/03 03/04 PROJECTED ESTIMATED
ACTUAL BUDGET ACTUAL BASE
Administration 586,620 658,958 658,820 749,449 (13.8%)744,514
Electric 1,351,778 1,613,226 1,597,256 2,015,801 (26.2%)1,985,801
Electric Contracts 19,858,264 21,115,792 23,169,549 25,381,689 (9.5%)26,160,289
AMR 577,536 621,207 621,207 615,493 (-0.9%)615,493
Systems Engineering 472,945 529,632 518,648 653,896 (26.1%)627,172
Stormwater Drainage 669,897 781,036 780,483 843,177 (8.0%)837,977
Streets 1,655,719 2,002,924 1,944,940 1,975,792 (1.6%)1,988,261
Wastewater 3,736,537 3,444,579 3,287,311 3,579,292 (8.9%)3,659,092
Water 5,082,116 6,388,134 5,988,386 6,760,790 (12.9%)7,131,787
Reuse Irrigation 94,155 105,900 105,900 107,200 (1.2%)107,200
Division Total 34,085,567 37,261,388 38,672,500 42,682,579 (10.4%)43,857,586
* Percent change of 04/05 Adopted from 03/04 Projected Actual
04/05
ADOPTED
(% Change*)
Personnel
10%
Capital
4%
Operations
86%
02/03 03/04 03/04 05/06
ACTUAL ORIGINAL FINAL / PROJECTED
PERSONNEL SUMMARY BUDGET ACTUAL
Administration 899 1 0
Electric 16 19 19 19
AMR 666 6
Systems Engineering 888 9
Stormwater Drainage 5/.5 5/.5 5/.5 5/.5
Streets 11/.75 14/.75 14/.75 14/.75
Wastewater Collection *10 10 9 10
Water Distribution *13 13 14 16
Total (FT/PT) 77/1.25 84/1.25 84/1.25 89/1.25
16
10
89/1.25
6
9
5/.5
14/.75
10
19
04/05
ADOPTED
106
Georgetown Utility Systems
Administration
DEPARTMENT DESCRIPTION
The Georgetown Utility Systems (GUS) Administration Department manages financial operations and personnel
services for all departments in the division. The Department provides administrative support, including customer
relations, reception, record keeping, management of Key Accounts, and secretarial services, to all departments
within the division. Long-term system planning is coordinated by the Department. Administration is responsible for
coordination and operation of all utilities during emergency management situations.
MAJOR DEPARTMENT GOALS
• Provide reliable utility services and efficient, effective transportation systems that protect the community and
reflect its values.
• Promote a safe and positive working environment for employees.
• Ensure excellent customer service to the Georgetown community.
• Promote consumer education programs for efficient utility use, conservation, and customer service.
• Maintain quality utilities and transportation systems that promote well-planned development.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2003/2004
• Completed right-of-way acquisitions for State Highway 29 at Wolf Ranch.
• Expanded Key Account Program through excellent customer service to industrial and commercial customer
base; forging strong business relationships with key account customers and expanding the industrial and
commercial customer base.
• Implemented regular and well-documented safety meetings and inspections.
• Increased administrative support to the Georgetown Transportation Enhancement Corporation (GTEC) and
Georgetown Utility System (GUS) Advisory Boards.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2004/2005
• Establish a franchise with the City of Round Rock for electric service north of FM 1431.
• Continue regional wastewater implementation for the San Gabriel Basin.
• Expand the Key Account Program to coordinate efforts with the City’s economic development efforts.
• Initiate phased implementation of improvements associated with Wolf Ranch.
• Implement 10-Year Transportation Plan for GTEC.
• Develop strategies for a centralized dispatch operations center.
• Update Strategic Plans for each functional utility area.
• Conduct a traffic feasibility study to improve traffic conditions to be implemented in future budget years.
• Facilitate property insurance claims in-house for increased efficiency and customer service.
ADMINISTRATION 02/03
ACTUAL
03/04
ORIGINAL
BUDGET
03/04
FINAL /
ACTUAL
04/05
ADOPTED
05/06
PROJECTED
Assistant City Manager for Utilities
Administrative Manager
Administrative Assistant
Dispatcher Customer Service Coordinator
Staff Assistant
Paralegal
Key Account Manager
Insurance Claims Adjuster
Secretary / Records Mgmt Specialist
Total
1
1
1
2
1
1
1
0
0
8
1
1
1
2
1
1
1
0
1
9
1
1
1
2
1
1
1
0
1
9
1
1
1
2
1
1
1
1
1
10
1
1
1
2
1
1
1
1
1
10
107
WORKLOAD MEASURES
ACTUAL
FY 01/02
ACTUAL
FY 02/03
BUDGETED
FY 03/04
PROJECTED
FY 03/04
PROPOSED
FY 04/05
1. Work orders issued 13,213 10,663 13,500 12,985 13,500
2. Contracts negotiated 77 81 85 106 85
3. Purchase orders processed 1,263 1198 1,375 1,250 1,300
PERFORMANCE MEASURES
ACTUAL
FY 01/02
ACTUAL
FY 02/03
BUDGETED
FY 03/04
PROJECTED
FY 03/04
PROPOSED
FY 04/05
1. Consumer education program
contacts
2. Customer satisfaction of field
operations
3. Lost time injury/accidents
17,480
90%
0
16,865
92%
2
17,700
94%
0
20,187
94%
7
18,000
95%
3
DEPARTMENTAL BUDGET: JOINT SERVICES FUND
MAJOR BUDGET CHANGES/ISSUES:
A Staff Assistant was added in 2003/04 to provide clerical support for GTEC and GUS Advisory Board. An
Insurance Claims Adjuster will be added in 2004/05 to provide coordination and customer service for the City’s
insurance claims processes.
03/04 05/06
02/03 03/04 PROJECTED 04/05 ESTIMATED
ACTUAL BUDGET ACTUAL ADOPTED BASE
391,806 455,701 455,563 Personnel 530,756 530,146
194,814 203,257 203,257 Operations 218,693 214,368
586,620 658,958 658,820 749,449 744,514
108
Georgetown Utility Systems
Energy Services – Electric Operations
DEPARTMENT DESCRIPTION
The Electric Department constructs and maintains a complete system of
electric conductors, switches, lines and transformers used for the
distribution of electricity purchased wholesale from the Lower Colorado
River Authority (LCRA), City Public Service of San Antonio, and
Constellation Power Source, Incorporated. In addition, the Department
reviews plans for construction of new lines (overhead and underground),
and develops design specifications that meet all safety and construction
requirements. The Department installs and maintains streetlights and
security lighting systems. The Department administers a tree trimming
maintenance program to minimize outages and prevent damage to electric
distribution equipment and lines. The Department promotes public
education and provides information through safety programs. In addition,
the Department monitors proposed legislation related to electric deregulation and evaluates its potential impact on
the City of Georgetown and its customers.
MAJOR DEPARTMENT GOALS
• Maintain a nationally recognized safety record for the City’s Electric and AMR departments.
• Stay abreast of issues related to the Texas electric utility industry due to deregulation.
• Explore viable options to control and reduce our purchased power expenses.
• Provide reliable, cost effective electric service for our customers.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2003/2004
• Completed construction of all underground feeders from the new Rivery Substation.
• Constructed 14 miles of underground lines and 2 ½ miles of overhead lines for system expansion.
• Received a First Place Safety Award from American Public Power Association for the department’s safety
accomplishments with no lost time or reportable accidents.
• Completed automation of breakers at Glasscock and Chief Brady Substations to aid in system reliability.
• Continued meter testing and thermovison of major electric facilities to insure revenue and system reliability.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2004/2005
• Continue to participate in LCRA’s Market Pricing Option for a minimum 10% of our energy requirements.
• Enter into discussions with LCRA, at their request, for 2016 contract discussions and negotiations.
• Continue to explore options for outage management software to enhance customer service in relations to
electronic system design programs by utilizing information from the City’s Global Information System (GIS) and
AMR databases for updating of the electric mapping database.
• Complete construction of major electric feeder tie lines between FM 971 and SH 29 along the new Inner Loop
Road, and from SH 1460 to Maple Street.
• Continue to convert overhead facilities to underground facilities within the downtown area.
ELECTRIC 02/03
ACTUAL
03/04
ORIGINAL
BUDGET
03/04
FINAL /
ACTUAL
04/05
ADOPTED
05/06
PROJECTED
Energy Services Manager
Operations Team Leader – Electric
Journey Line Technician
Inspector – Electric Crew Leader – Electric
1
1
1
1
3
1
1
1
1
4
1
1
2
2
4
1
1
2
2
4
1
1
2
2
4
Line Technician 3 4 3 3 3
Apprentice Line Technician 6 7 6 6 6
Total 16 19 19 19 19
NUMBER OF ELECTRIC CUSTOMERS
12,500
13,000
13,500
14,000
14,500
15,000
15,500
16,000
16,500
17,000
00/01 01/02 02/03 03/04 04/05*
*Projected
109
WORKLOAD MEASURES
ACTUAL
FY 01/02
ACTUAL
FY 02/03
BUDGETED
FY 03/04
PROJECTED
FY 03/04
PROPOSED
FY 04/05
1. # of street lights
2. Street light repairs
2160
270
2,250
850
2,270
850
2,330
780
2,375
800
3. Underground locates 3602 4,440 4,900 4,600 4,950
4. Ft of 3 phase overhead line
constructed
11,088 52,000 32,120 12,000 37,000
5. Ft of 3 phase underground
constructed
12,144 25,000 29,568 27,500 30,000
PERFORMANCE MEASURES
ACTUAL
FY 01/02
ACTUAL
FY 02/03
BUDGETED
FY 03/04
PROJECTED
FY 03/04
PROPOSED
FY 04/05
1. Compliance with ERCOT 95% LF*100%100%100%100%100%
2. % of system GPS 95%100%99%99%99%
3. Feeder line circuit maintenance 25%40%40%50%50%
4. Average System Availability Index N/A N/A 99.9 99.9% 99.9%
5. Electric System training by
TEEX**
100%100%100%100%100%
* ERCOT (Electric Reliability Council of Texas) Load Factor
** TEEX (Texas Engineering Extension Service)
DEPARTMENTAL BUDGET: ELECTRIC FUND
MAJOR BUDGET CHANGES/ISSUES:
Personnel costs increase from the prior year projections due to the full year of expense recognized for the
additional maintenance crew during 2004. Overall, maintenance costs have increased in direct correlation with the
growth in the system. Capital maintenance items, such as capacitor additions and meter upgrades, have been
moved to the department budget from the capital improvement program since they are maintenance programs
completed in-house.
03/04 05/06
02/03 03/04 PROJECTED 04/05 ESTIMATED
ACTUAL BUDGET ACTUAL ADOPTED BASE
761,699 1,005,615 990,520 Personnel 1,079,224 1,079,224
590,079 607,611 606,736 Operations 680,077 650,077
Capital 256,500 256,500
1,351,778 1,613,226 1,597,256 2,015,801 1,985,801
110
Georgetown Utility Systems
Energy Services - Electric Contracts
The Electric Fund transfers to the General Fund two percent of its gross billings for utility services. This transfer
has been viewed as a payment of franchise fees which would have been payable to the General Fund from a non-
City provider of such services.
This department also accounts for the contractual obligations not specific to an individual department of the fund,
such as purchased power costs paid to the City's wholesale providers. Special Projects and Services include
programs such as public education, energy and contracts not attributable to the Electric Department. Allocated
costs for administrative or support departments are also recognized. The City maintains 185 miles of overhead
electric distribution lines, 93 miles of underground distribution lines, and currently has a 130-megawatt capacity.
ELECTRIC CONTRACTS BUDGET: ELECTRIC FUND
MAJOR BUDGET CHANGES/ISSUES:
Revenue related expenses cause variances between years. These expenses are fully recovered through utility
revenues and a budget amendment at year end is typically proposed to address the weather and cost-related
expenses.
03/04 05/06
02/03 03/04 PROJECTED 04/05 ESTIMATED
ACTUAL BUDGET ACTUAL ADOPTED BASE
17,573,680 18,600,000 20,615,000 Purchased Power 22,612,500 23,377,500
421,251 443,934 469,543 General Fund Allocations 502,703 502,703
1,082,630 1,274,519 1,236,051 Internal Svc Fund Allocations 1,342,846 1,336,546
533,542 577,500 643,300 Franchise Fees 673,100 693,000
247,161 219,839 205,655 Special Projects & Svcs 250,540 250,540
19,858,264 21,115,792 23,169,549 25,381,689 26,160,289
112
Georgetown Utility Systems
Energy Services – SCADA-Automatic Meter Reading (AMR)
DEPARTMENT DESCRIPTION
The SCADA-AMR Department is responsible for operation,
maintenance, and gathering of customer utility consumption data. This is
accomplished by operation of a fixed wireless network for use by Utility
Billing in preparing customers’ water, wastewater and electric billings
and by a power line carrier system for the City’s large commercial and
industrial electric customers. The Department also monitors and assists
with controlling of the City’s electric, pumping, water and wastewater
facilities via a Supervisory Control and Data Acquisition (SCADA)
wireless network. The department currently monitors 5-electric
substations with 21 substation breakers, 27-lift stations, 6-pumping
stations, 3-water treatment plants, 3-wastewater treatment plants, 6-well
sites, as well as the emergency notification sirens.
MAJOR DEPARTMENT GOALS
• Assist utility customers in conservation efforts by providing accurate, individualized water and electric
consumption data.
• Ensure that 96% of AMR electric and water meters are read electronically and accurately.
• Enhance the control functions of the SCADA system as the City’s Water, Wastewater and Electric systems
continue to grow and benefit from automated controls.
• Expand the large commercial and industrial electric metering program in preparation to meet the Electric
Reliability Council of Texas (ERCOT) protocols for electric deregulation of Interval Data Recorder (IDR)
metering on customers with a peak demand greater than 1000kW.
• Expand deployment of water and electric Encoder Receiver Transmitter (ERT’s) to new growth areas of the
City’s utility system.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2003/2004
h Expanded SCADA system to allow for control of all substation breakers and additional water and wastewater
facilities within the service area.
h Maintained AMR deployment for new electric meters and expanded water deployment due to past system
growth.
h Upgraded control system and SCADA interface during the Berry Creek Wastewater Treatment Plant
expansion.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2004/2005
• Upgrade control system and add SCADA interface for the Dove Springs Wastewater Treatment plant
expansion.
• Complete audit process, which includes inspection of all electric and water meters and the installation of new
meter seals on all the electric meters.
• Install SCADA interface and controls for the new electric substation to allow for daily reporting of substation
and feeder loads, and to assist during power restoration.
AUTOMATIC METER READING (AMR)02/03
ACTUAL
03/04
ORIGINAL
BUDGET
03/04
FINAL /
ACTUAL
04/05
ADOPTED
05/06
PROJECTED
AMR Systems Technician
AMR Meter Reader
AMR System Operator
SCADA System Technician
Wireless Information System Manager
2
1
1
1
1
2
1
1
1
1
2
1
1
1
1
2
1
1
1
1
2
1
1
1
1
Total 6 6 6 6 6
ERT’s INSTALLED
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
00/01 01/02 02/03 03/04 04/05*
Electric Water *Projected
113
WORKLOAD MEASURES
ACTUAL
FY 01/02
ACTUAL
FY 02/03
BUDGETED
FY 03/04
PROJECTED
FY 03/04
PROPOSED
FY 04/05
1. Electric ERTs installed 14,990 15,725 16,600 16,650 17,150
2. Water ERTs installed 11,050 12,450 14,900 14,950 15,550
3. RTU upgrades 3 2 3 3 0
4. RTUs Installed 50 61 64 65 71
PERFORMANCE MEASURES
ACTUAL
FY 01/02
ACTUAL
FY 02/03
BUDGETED
FY 03/04
PROJECTED
FY 03/04
PROPOSED
FY 04/05
1. AMR meters read monthly 90%96%96%96%96%
2. AMR reads vs. CIS billed accounts 86%88%92%92%93%
3. CCU success rate (7/24/365)98%99%99%99%99%
4. SCADA uptime (7/24/365)99.7%99.7%99.7%99.7%99.7%
5. SCADA system remote controlled 88%93%98%98%98%
DEPARTMENTAL BUDGET: ELECTRIC FUND
MAJOR BUDGET CHANGES/ISSUES:
03/04 05/06
02/03 03/04 PROJECTED 04/05 ESTIMATED
ACTUAL BUDGET ACTUAL ADOPTED BASE
275,064 296,657 296,657 Personnel 306,347 306,347
302,472 292,350 292,350 Operations 309,146 309,146
32,200 32,200 Capital
577,536 621,207 621,207 615,493 615,493
114
Georgetown Utility Systems
Systems Engineering
DEPARTMENT DESCRIPTION
The Systems Engineering Department is responsible for the coordination
and installation of Capital Improvement Projects (CIP’s) using consultant
design engineering firms; assists in negotiations for the acquisition of
easements and rights-of-way; provides inspection, testing services and
contract management for these projects. The Department manages and
maintains utility system models for departments within the Georgetown
Utility Systems Division, including: Water, Electric, Stormwater Drainage,
Streets and Wastewater. The Department develops and maintains
construction standards and specifications for CIP and Development
construction projects. Systems Engineering supports the review of
development plans and provides inspection, testing and contract
management for the installation of these facilities.
MAJOR DEPARTMENT GOALS
Provide superior quality inspection and quality control for CIP and development infrastructure construction.
Establish and maintain successful asset management practices within Georgetown Utility Systems.
Apply modern technology to reduce the cost and disruption of utility service.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2003/2004
• Worked with the development community to revise City Construction Specifications and Standards.
• Successfully oversaw the completion of the Edwards Aquifer Recharge Zone (EARZ) Phase I wastewater line
rehabilitation projects in Old Town.
• Managed the review, selection and conversion process to a new Electric System connectivity software
modeling application.
• Managed all quarter-cent sales tax funded road projects, Georgetown Transportation Enhancement
Corporation (GTEC) funded projects and CIP projects.
• Oversaw and managed major infrastructure projects such as the Sun City Elevated Storage Tank, the Lake
Water Treatment Plant Expansion, the Berry Creek Wastewater Treatment Plant project and the Rivery Bridge
project.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2004/2005
• Develop standards and specifications for electronic documentation of infrastructure files and plans.
• Update the Wastewater Master Plan, in cooperation with Water Services.
• Create an Irrigation Master Plan, in cooperation with Water Services.
• Implement a pavement management plan, in cooperation with Transportation Services and Finance to comply
with GASB 34 requirements.
• Review and update the file structure for capital improvement projects.
• Improve efficiency and timeliness of transportation projects with the addition of a Transportation CIP
Coordinator.
SYSTEMS ENGINEERING 02/03
ACTUAL
03/04
ORIGINAL
BUDGET
03/04
FINAL /
ACTUAL
04/05
ADOPTED
05/06
PROJECTED
System Engineering Manager 1 1 1 1 1
C.I.P. Coordinator 1 1 1 1 1
Utility Systems Information Manager 1 1 1 1 1
Chief C.I.P. Field Representative
Transportation C.I.P. Coordinator
1
0
1
0
1
0
1
1
1
1
Field Representative
Systems Engineering Tech
3
1
3
1
3
1
3
1
3
1
Total 8 8 8 9 9
CIP PROJECT COSTS
$0
$2,000,000
$4,000,000
$6,000,000
$8,000,000
$10,000,000
$12,000,000
$14,000,000
$16,000,000
$18,000,000
$20,000,000
00/01 01/02 02/03 03/04 04/05*
Pr
o
j
e
c
t
C
o
s
t
s
0
5
10
15
20
25
30
35
40
45
#
o
f
P
r
o
j
e
c
t
s
Project Costs # of Projects *Projected
115
WORKLOAD MEASURES
ACTUAL
FY 01/02
ACTUAL
FY 02/03
BUDGETED
FY 03/04
PROJECTED
FY 03/04
PROPOSED
FY 04/05
1. Capital Improvement Projects:
# of projects 14 19 27 27 21
Project budget $20,579,191 $6,468.122 $16,240,900 $15,134,387 $10,435,000
Construction costs 19,206,157 $5,408,202 $14,701,906 $13,537,187 N/A
2. GTEC Projects
# of projects N/A 8 6 6 6
Project budgets N/A $3,934,771 $10,492,808 $10,492,808 $7,158,400
3. Development Projects:
# of projects 57 50 50 64 70
4. Easement/Right-of-Way:
Acquisitions/research 42 30 30 30 70
PERFORMANCE MEASURES
ACTUAL
FY 01/02
ACTUAL
FY 02/03
BUDGETED
FY 03/04
PROJECTED
FY 03/04
PROPOSED
FY 04/05
1. % CIP projects – design complete 65%80%80%100%100%
2. % CIP projects under construction 65%80%80%100%100%
DEPARTMENTAL BUDGET: JOINT SERVICES FUND
MAJOR BUDGET CHANGES/ISSUES:
A Transportation CIP Coordinator will be added in 2004/05 to facilitate the increased number of transportation
projects and needs. This position is partially funded through the Georgetown Transportation Enhancement
Corporation (GTEC), the City’s 4B Corporation.
03/04 05/06
02/03 03/04 PROJECTED 04/05 ESTIMATED
ACTUAL BUDGET ACTUAL ADOPTED BASE
385,240 449,838 438,854 Personnel 533,507 543,833
87,705 79,794 79,794 Operations 120,389 83,339
472,945 529,632 518,648 653,896 627,172
116
Georgetown Utility Systems
Transportation Services - Stormwater Drainage
DEPARTMENT DESCRIPTION
The Stormwater Drainage Utility addresses environmental concerns over
in-stream water quality, regulatory demands related to stormwater run-
off controls, infrastructure operation and maintenance, and
drainage/flood control related capital project needs. Other duties include
sign maintenance for the Street Department and assisting Police and
Fire Services on Code Enforcement issues.
MAJOR DEPARTMENT GOALS
• Utilize the Regional Stormwater Master Plan (RSMP) by building
detention ponds and upgrading waterways as needed within the city.
• Comply with Stormwater regulations.
• Reduce the threat of property damage and personal injury, and
enhance public safety through proper maintenance and operation of
the city’s drainage system.
• Improve the cleanliness and appearance of the community through
the sweeping of city streets.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2003/2004
• Contracted for the monthly mowing of detention ponds.
• Completed downtown improvements:
• Storm grates on 8th Street
• Curbing on Main Street
• Parking and two-hour parking projects.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2004/2005
• Construct drainage improvements on River Bend Drive from Mesquite to Gabriel View.
• Construct water quality ponds on 2nd Street, at Main and at College, to assist in the implementation of the
Downtown Master Plan.
• Implement a city-wide road striping contract.
STORMWATER DRAINAGE 02/03
ACTUAL
03/04
ORIGINAL
BUDGET
03/04
FINAL /
ACTUAL
04/05
ADOPTED
05/06
PROJECTED
Drainage Foreman 1 1 1 1 1
Sign & Drainage Field Technician
Heavy Equipment Operator
Light Equipment Operator
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Street Sweeper Operator 1 1 1 1 1
Crewman 1 (P/T) .5 .5 .5 .5 .5
Total (FT/PT) 5/.5 5/.5 5/.5 5/.5 5/.5
DETENTION PONDS MAINTAINED
0
5
10
15
20
25
00/01 01/02 02/03 03/04 04/05*
*Projected
118
WORKLOAD MEASURES
ACTUAL
FY 01/02
ACTUAL
FY 02/03
BUDGETED
FY 03/04
PROJECTED
FY 03/04
PROPOSED
FY 04/05
1. Miles of public right-of-way mowed
and cleaned 20.5 20.5 20.5 25 25
2. Hours of street sweeper operation 1,500 1,500 1,500 1,500 1,800
3. Linear feet of curb and gutter
installed/replaced city wide 16,500 11,467 4,285 27,643 12,000
PERFORMANCE MEASURES
ACTUAL
FY 01/02
ACTUAL
FY 02/03
BUDGETED
FY 03/04
PROJECTED
FY 03/04
PROPOSED
FY 04/05
1. # of times city streets swept
annually 7 7 7 8 8
2. Cubic yards of debris prevented
from entering waterways 1,350 1,350 1,350 1,350 1,500
3. # of detention ponds maintained 5 5 21 21 21
DEPARTMENTAL BUDGET: STORMWATER DRAINAGE FUND
MAJOR BUDGET CHANGES/ISSUES:
Maintenance costs increase in 2004/05 due to the additional drainage ponds being maintained by the City.
Personnel costs increase due to cost of living adjustments for staff, as well as increases in benefits-related
expenses.
03/04 05/06
02/03 03/04 PROJECTED 04/05 ESTIMATED
ACTUAL BUDGET ACTUAL ADOPTED BASE
208,548 231,232 230,679 Personnel 242,753 242,753
461,349 544,739 544,739 Operations 600,424 595,224
5,065 5,065 Capital
669,897 781,036 780,483 843,177 837,977
118
Georgetown Utility Systems
Transportation Services - Street Department
DEPARTMENT DESCRIPTION
The Street department manages, maintains and repairs City streets and rights-of-way. Responsibilities include
traffic control, emergency response operations, special events, and assistance in code enforcement. Daily, the
department inspects roadways for sign repair, pavement management, and sight obstructions. The Street
department participates with the Safety Committee to provide safety-training workshops. The department also
oversees the management of revenues collected through the City’s ¼ cent sales tax for street maintenance.
MAJOR DEPARTMENT GOALS
• Continue work with Federal, State and County entities, adjoining municipalities, other departments and the
public to update and maintain a Comprehensive Transportation Plan.
• Protect the investment in the public transportation system through preventive maintenance and on-going
rehabilitation of streets and sidewalks.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2003/2004
• Completed ¼ Cent Sales Tax Projects:
• 11th Street Rehabilitation 13th Street Rehabilitation
• Walnut Street Rehabilitation 16th Street Rehabilitation
• Riverside Drive Rehabilitation 17th Street Rehabilitation
• Airport Road Rehabilitation
• Completed Georgetown Transportation Enhancement Corporation (4B) Projects:
• Phase One Sidewalk Project
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2004/2005
• Determine the feasibility of assuming maintenance and control of traffic signals for the City of Georgetown.
• Implement pavement management (CarteGraph’s “Pavement View Plus”) to inventory, rate and prioritize street
conditions for the five-year strategic maintenance plan.
• Rehabilitate the following proposed roadways using the ¼ Cent Sales Tax and General Fund:
• Main Street •Ranch Road
• Parkway Drive •Maple Street
• Forest Street •Morrow Street
• College Street •Ash Street
• Vine Street •Laurel Street
• Olive Street
• Create an enhanced public perception, related to traffic congestion issues, by educating and informing the
public regarding the City’s actions to address congestion issues.
STREET DEPARTMENT 02/03
ACTUAL
03/04
ORIGINAL
BUDGET
03/04
FINAL /
ACTUAL
04/05
ADOPTED
05/06
PROJECTED
Transportation Services Manager 1 1 1 1 1
Streets Foreman 1 1 1 1 1
Heavy Equipment Operator/Crew Foreman 1 1 1 1 1
Heavy Equipment Operator 3 4 4 4 4
Light Equipment Operator 5 7 7 7 7
Street Maintenance Worker (P/T) .75 .75 .75 .75 .75
Total (PT/FT) 11/.75 14/.75 14/.75 14/.75 14/.75
119
WORKLOAD MEASURES
ACTUAL
FY 01/02
ACTUAL
FY 02/03
BUDGETED
FY 03/04
PROJECTED
FY 03/04
PROPOSED
FY 04/05
1. Lane miles of seal coated,
overlayed or microsurfaced streets 32 33.5 25 18 25
2. Square feet of roadway patching 30,000 30,000 30,000 30,000 30,000
3. Traffic signs repaired/installed 275 350 900 350 350
4. Lane miles of streets maintained 335 335 335 420 430
5. Linear feet of sidewalk installed 300 300 3,700 27,000*3,000
* Amount reflects the $500,000 GTEC Phase One Sidewalk Project
PERFORMANCE MEASURES
ACTUAL
FY 01/02
ACTUAL
FY 02/03
BUDGETED
FY 03/04
PROJECTED
FY 03/04
PROPOSED
FY 04/05
1. % of streets seal coated 1.5 %1.5%1.5%1%1.5%
2. % of streets overlayed 3%2%3%3%2.5%
3. % of streets microsurfaced 7%0%7%5.5%6%
DEPARTMENTAL BUDGET: GENERAL FUND
MAJOR BUDGET CHANGES/ISSUES:
03/04 05/06
02/03 03/04 PROJECTED 04/05 ESTIMATED
ACTUAL BUDGET ACTUAL ADOPTED BASE
427,450 600,970 581,986 Personnel 621,973 621,942
569,924 603,026 603,026 Operations 528,819 541,319
658,345 798,928 759,928 Capital 825,000 825,000
1,655,719 2,002,924 1,944,940 1,975,792 1,988,261
120
Georgetown Utility Systems
Water Services - Wastewater
DEPARTMENT DESCRIPTION
The Wastewater Department is responsible for the operation and
maintenance of infrastructure that provides wastewater for over 13,000
customers. Wastewater infrastructure includes 5 treatment plants (San
Gabriel, Dove Springs, Pecan Branch, Cimarron Hills, and Berry Creek)
totaling 5.74 MGD of capacity, 27 pumping stations, 2,800 manholes,
and 254 miles of wastewater collection mains. Department activities are
regulated by the Texas Commission on Environmental Quality (TCEQ)
and the Environmental Protection Agency (EPA). Department activities
include: periodic operational checks and preventive maintenance at
pumping facilities, Jet cleaning and camera inspection of collection
mains and manholes, and acceptance of new facilities constructed by
developers, repair and preventive maintenance of collection mains,
troubleshooting and repair of system blockages, marking of all
underground piping prior to excavation by contractors. The operation and maintenance of treatment facilities is
performed by the Brazos River Authority (BRA) under a five-year contract that began in October 2003.
MAJOR DEPARTMENT GOALS
• Maintain an adequate treatment capacity to allow for future growth of the community.
• Maintain or exceed EPA and TCEQ standards for wastewater service (discharge limits, system integrity).
• Operate and maintain the system in a cost efficient manner to provide for the lowest possible service rates for
our customers.
• Expand the wastewater system to provide service and minimize the proliferation of septic systems.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2003/2004
• Commenced operation of two new lift stations (Cimarron Hills and the Meadows of Georgetown).
• Completed repairs on all system flaws identified in the FY 02/03 Edwards Aquifer Testing Program.
• Completed the Global Positioning Systems (GPS) locating of system infrastructure for the FY 03/04 Edwards
Aquifer Testing Program.
• Increased the qualification level of department personnel by providing training that resulted in the initial or
upgraded TCEQ certification of six additional personnel.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2004/2005
• Implement the FY 04/05 CIP to expand the capacity of the Dove Springs Wastewater Treatment Plant and
make repairs to the collection system identified in the Edwards Aquifer Testing performed in FY 2003/2004.
• Establish a wastewater franchise area (CCN) following completion of the Regional Wastewater Study.
• Complete the update of the wastewater system master plan in cooperation with Systems Engineering to allow
for the proper development of future Impact Fee Studies and future five-year Capital Improvement Projects
(CIP) planning.
• Transfer the responsibility for Edwards Aquifer Testing from outside contractors to City Staff to reduce cost and
promote synergy with maintenance and repair efforts.
• Develop in-house line testing program for the on-going Edwards Aquifer Testing program.
WATER SERVICES - WASTEWATER 02/03
ACTUAL
03/04
ORIGINAL
BUDGET
03/04
FINAL /
ACTUAL
04/05
ADOPTED
05/06
PROJECTED
Supervisor 1 1 1 1 1
Team Leader 1 1 1 1 1
Senior Water Services Technician 1 1 2 2 2
Water Services Technician 1 3 2 2 2
Water Services Apprentice
Pump Maintenance Positions
2
4
4
0
3
0
4
0
4
0
Total (PT/FT) 10 10 9 ** 10 ** 10 **
** Reorganization of positions - Water/Wastewater Department
WASTEWATER SERVICE
CUSTOMERS AND WORK ORDERS
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
99/00 00/01 01/02 02/03 03/04 04/05*
Wa
s
t
e
w
a
t
e
r
C
u
s
t
o
m
e
r
s
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
W
o
r
k
O
r
d
e
r
s
Customers Work Orders *Projected
121
WORKLOAD MEASURES
ACTUAL
FY 01/02
ACTUAL
FY 02/03
BUDGETED
FY 03/04
PROJECTED
FY 03/04
PROPOSED
FY 04/05
1. Wastewater service customers 11,972 12,387 13,100 13,000 13,600
2. Wastewater treated (MG)894 973 1,053 1,350 1,250
3. Work orders 1,450 1,550 2,800 3,400 3,600
4. Locates completed N/A 4,439 1,375 4,000 4,500
5. Collection Piping Cleaned / Tested N/A 181,000 250,000 325,000 250,000
PERFORMANCE MEASURES
ACTUAL
FY 01/02
ACTUAL
FY 02/03
BUDGETED
FY 03/04
PROJECTED
FY 03/04
PROPOSED
FY 04/05
1. Maintenance work order backlog 35 35 50 45 50
2. Unauthorized discharges N/A N/A N/A 12 10
3. Sewer chokes N/A 127 200 90 85
DEPARTMENTAL BUDGET: WATER SERVICES FUND
MAJOR BUDGET CHANGES/ISSUES:
Maintenance cost increase for Edwards Testing will be offset by greater savings in CIP funding. Cimarron Hills
Plant will begin operations in FY 04/05 resulting in higher utility costs.
Staff were shifted between Water and Wastewater departments due to a reorganization of the utility. Two
apprentice positions will be added to begin in-house testing of City wastewater lines, as required by the Edward’s
Aquifer Recharge Zone regulations. This testing was previously funded as a Capital Improvement Project in the
capital program savings in the capital program fund this expense. The capital program now includes only the
capital repairs and replacement of noncompliant lines.
03/04 05/06
02/03 03/04 PROJECTED 04/05 ESTIMATED
ACTUAL BUDGET ACTUAL ADOPTED BASE
457,698 434,166 434,166 Personnel 481,771 481,771
594,983 490,533 490,533 Operations 517,360 517,360
8,606 2,000 2,000 Capital 50,000 50,000
1,061,287 926,699 926,699 Subtotal - Operations 1,049,131 1,049,131
1,492,984 1,480,252 1,363,840 Operations 1,435,302 1,535,302
108,007 120,500 117,100 Franchise Fees 128,700 134,800
94,256 110,580 116,959 General Fund Allocations 119,268 119,268
793,047 659,921 629,854 Internal Svc Fund Allocation 678,129 671,829
186,956 146,627 132,859 Spec. Svc / Legal 168,762 148,762
3,736,537 3,444,579 3,287,311 3,579,292 3,659,092
122
Georgetown Utility Systems
Water Services - Water
DEPARTMENT DESCRIPTION
The Water Services Utility is responsible for the operation and
maintenance of infrastructure that provides potable water for over
15,000 customers. Water infrastructure includes 4 treatment plants with
associated intake structures and wells (Lake Georgetown, San Gabriel
Park, Southside, and Berry Creek) totaling 27.5 MGD of capacity, 12
storage tanks with a total storage capacity of 13.4 MG, 8 water pumping
stations, 260 miles of water distribution piping including valves, 1,975
fire hydrants, and 15,387 meters. Department activities are regulated by
the Texas Commission on Environmental Quality (TCEQ) and the
Environmental Protection Agency (EPA). Department activities include:
periodic operational checks and preventive maintenance at pumping
facilities, inspection and acceptance of new facilities constructed by
developers, repair and preventive maintenance of piping and valves, testing and maintenance of system metering,
marking of all underground piping prior to excavation by contractors, and routine sampling of water for proper
process controls. The operation and maintenance of treatment facilities is performed by Operations Management
International under a five-year contract that began in October 2003.
MAJOR DEPARTMENT GOALS
• Maintain an adequate supply of water to allow for future growth of the community.
• Maintain or exceed EPA and TCEQ standards for water service (pressure, flow, and water quality).
• Operate and maintain the system in a cost efficient manner to provide for the lowest possible service rates for
our customers.
• Expand the system to provide water service throughout our franchise area.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2003/2004
• Commenced operation of the Lake Water Treatment Plant expansion (8.8 MGD), bringing the total capacity of
the plant to 17.568 MGD.
• Commenced operation of the Cedar Breaks water line, extending the west loop water line from Shell Road to
the Oak Crest subdivision.
• Commenced operation of Sun City Pump Station, reducing the peak demand on Sequoia Spur Pump Station.
• Increased the qualification level of department personnel by providing training that resulted in the TCEQ
certification of five additional personnel.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2004/2005
• Implement the FY 2004/2005 Capital Improvement Plans in cooperation with Systems Engineering and the
Street Department to improve water service.
• Implement rotational team assignments to establish a Valve and Hydrant maintenance program that meets or
exceeds American Water Works Association (AWWA) standards.
• Continue the implementation of the water storage tank maintenance plan by coordinating the rehabilitation of
the Leader Elevated Storage tank with Systems Engineering.
• Establish the 1065 pressure plane by placing the Jennings Branch EST and Sun City Pump Stations in service.
• Develop an in-house “locate” program to decrease maintenance calls due to construction excavation.
WATER SERVICES – WATER 02/03
ACTUAL
03/04
ORIGINAL
BUDGET
03/04
FINAL /
ACTUAL
04/05
ADOPTED
05/06
PROJECTED
Manager
Supervisor
Team Leader
Water Services Technician
Water Services Apprentice
Pump Maintenance Positions
Total
1
1
1
1
6
3
13
1
1
1
1
9
0
13
1
1
1
2
9
0
14 **
1
1
1
2
11
0
16 **
1
1
1
2
11
0
16 **
** Reorganization of positions - Water/Wastewater Department
WATER SERVICE CUSTOMERS
AND WORK ORDERS
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
18,000
00/01 01/02 02/03 03/04 04/05*
Wa
t
e
r
C
u
s
t
o
m
e
r
s
0
500
1,000
1,500
2,000
2,500
3,000
3,500
W
o
r
k
O
r
d
e
r
s
Customers Work Orders *Projected
123
WORKLOAD MEASURES
ACTUAL
FY 01/02
ACTUAL
FY 02/03
BUDGETED
FY 03/04
PROJECTED
FY 03/04
PROPOSED
FY 04/05
1. Water Service Customers 14,086 14,786 15,400 15,250 15,900
2. Annual Production (MG)3,096 3,133 3,269 2,938 3,300
3. Peak Production (MGD)16.4 18.1 18.5 18.5 18.5
4. Work Orders 3,129 2,624 3,300 3,300 3,300
5. Locates completed N/A 4,439 1,500 4,000 4,500
PERFORMANCE MEASURES
ACTUAL
FY 01/02
ACTUAL
FY 02/03
BUDGETED
FY 03/04
PROJECTED
FY 03/04
PROPOSED
FY 04/05
1. Maintenance Work Order Backlog 360 60 60 150 60
2. Production / Billing Ratio (%)80%74%80%77%82%
DEPARTMENTAL BUDGET: WATER SERVICES FUND
MAJOR BUDGET CHANGES/ISSUES:
Staff were shifted between Water and Wastewater Departments due to a reorganization of the utility. A Water
Services Apprentice will be added to address workload issues in the City'’ line locate program. The Operations
budget will decrease due to the reclassification of capital maintenance funding to the capital category.
03/04 05/06
02/03 03/04 PROJECTED 04/05 ESTIMATED
ACTUAL BUDGET ACTUAL ADOPTED BASE
406,069 554,664 554,664 Personnel 621,862 621,862
532,576 886,196 886,196 Operations 700,322 700,322
54,335 2,000 2,000 Capital 660,000 660,000
992,980 1,442,860 1,442,860 Subtotal - Operations 1,982,184 1,982,184
1,001,316 1,198,171 1,133,634 Plant 1,174,934 1,274,934
774,495 876,300 876,300 BRA - Water Purchases 1,026,821 1,180,844
188,012 210,300 203,250 Franchise Fee 213,000 218,300
172,368 178,396 188,687 General Fund Allocations 182,814 182,814
890,927 847,511 814,615 Internal Svc Fund Allocation 871,626 865,326
1,051,152 1,609,596 1,329,040 Special Projects & Svcs 1,309,411 1,427,385
10,866 25,000 Capital
5,082,116 6,388,134 5,988,386 6,760,790 7,131,787
124
Georgetown Utility Systems
Water Services – Reuse Irrigation
DEPARTMENT DESCRIPTION
The Reuse/Irrigation Department is responsible for the operation and maintenance of infrastructure that treats and
distributes reuse irrigation water to five major irrigation customers. Reuse Irrigation infrastructure includes 3 storage
tanks with a total capacity of 2.3 MG, 11 miles of piping and valves, and 3 major pumping stations. Department
activities are regulated by the Texas Commission on Environmental Quality (TCEQ) and the Environmental
Protection Agency (EPA). Department activities include: periodic operational checks and preventive maintenance
at pumping facilities, inspection and acceptance of new facilities, repair and preventive maintenance of piping and
valves, testing and maintenance of metering, marking of all underground piping prior to excavation by contractors,
and routine sampling of water for proper process controls.
MAJOR DEPARTMENT GOALS
• Maintain or exceed TCEQ standards for reuse irrigation service (water quality).
• Operate and maintain the system in a cost efficient manner to provide for the lowest possible service rates for
our customers.
• Expand the reuse irrigation system to reduce the dependence on potable water for irrigation.
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FISCAL YEAR 2003/2004
• Commenced operation of the Park Irrigation Pump Station and Storage tank to provide service to Georgetown
Country Club.
• Replaced the Variable Frequency Drive on the Airport Irrigation Pump Station and reprogrammed the system to
make operation more efficient.
MAJOR DEPARTMENT STRATEGIES FOR FISCAL YEAR 2004/2005
• Implement the FY 2004/2005 Capital Improvement Plan to complete the reuse irrigation line from the Pecan
Branch Treatment Plant to the Airport Irrigation Pump Station to provide reuse water to the station.
• Complete the update of the Reuse Irrigation System Master Plan, in cooperation with Systems Engineering, to
allow for the proper development of future five-year Capital Improvement Projects (CIP) planning.
125
WORKLOAD MEASURES
ACTUAL
FY 01/02
ACTUAL
FY 02/03
BUDGETED
FY 03/04
PROJECTED
FY 03/04
PROPOSED
FY 04/05
1. Average Daily Production (MGD).91 .84 1.10 .65*1.10
* Drop in production due to higher than average rainfall in the Spring and early Summer, 2004
PERFORMANCE MEASURES
ACTUAL
FY 01/02
ACTUAL
FY 02/03
BUDGETED
FY 03/04
PROJECTED
FY 03/04
PROPOSED
FY 04/05
1. Production / Billing Ratio N/A N/A N/A N/A 95%
DEPARTMENTAL BUDGET: WATER SERVICES FUND
MAJOR BUDGET CHANGES/ISSUES:
Increased utility costs due to rising electric rates cause the variance in Operations. Savings in Capital will be used
to fund the 2004 shortfall.
03/04 05/06
02/03 03/04 PROJECTED 04/05 ESTIMATED
ACTUAL BUDGET ACTUAL ADOPTED BASE
90,820 101,500 101,500 Operating 101,500 101,500
3,335 4,400 4,400 Franchise Fee 5,700 5,700
94,155 105,900 105,900 107,200 107,200