Loading...
HomeMy WebLinkAboutRES 960109-YRESOLUTION #, RESOLUTION OF ! OF OF GEORGETOWN,NG RESOLUTION NO.920450 ESTABLISHING LAND DEVELOPMENT, UTILITY CONNECT AND CONSTRUCTION PERMIT 1 ESTABLISHING W WHEREAS, it is the intention of the City Council to revise the City's local development fees; and WHEREAS, the City Council has determined that revising the development fees is in the best interest of the citizens and the businesses in the City of Georgetown; NOW, #' RESOLVED BY THE CITY COUNCILOF CITY OF !' # SECTION 1. The facts and recitations contained in the preamble of this resolution are hereby found and declared to be true and correct, and are incorporated by reference herein and expressly made a part hereof, as if copied verbatim. The City Council hereby finds that this resolution implements Economic Development Policy 5 of the Century Plan - Policy Plan Element, which states: "The City will take appropriate steps to have a self-sustaining economy" and Finance Policy 1 of the Century Plan - Policy Plan Element, which states "The City will conduct all municipal. operations in an efficient business -like manner"; and further finds that the adoption of this resolution is not inconsistent or in conflict with any other Century Plan Policies, as required by Section 2.03 of the Administrative Chapter of the Policy Plan. SECTION 2. The land development, utility connect, and construction permit fee schedules included in Exhibit "A" are hereby adopted as the new fees for the City of Georgetown. SECTION 3. This resolution shall be effective immediately upon adoption. RESOLVED this 9th day of January, 1996. ATTEST: 4j ej Sandra D. Lee City Secretary A-PP,ROVED AS TO FORM: Marianne Landers Banks City Attorney THE CITY OF GEORGETOWN: By: LEO W-06 Mayor "'ONSTRUCTION PERMIT FEES NEW CONSTRUCTION Application Fee Permit Fee Single Family Detached $100.00 $150.00 + .05/Sq. Ft. Other 100.00 150.00 + .08/Sq. Ft. ill 11TTI-19. _TFW_M11 11 F—ArereflUM210MINK01511 - Accessory Buildings over 144 Sq. Ft. $25.00 $50.00 + .01/Sq. Ft. *Plus individual trade permits as required and listed below Accessory Buildings under 144 Sq. Ft. 10.00 15.00 Re -Roofing 10.00 15.00 Fences 10.00 15.00 Back Flow Preventor Inspection 10.00 15.00 Signs 10.00 15.00 Fire Suppression Systems & Alarms 10.00 15.00 Certificate of Occupancy for - 30.00 existing buildings INDIVIDUAL TRADE PERMITS Inside City Outside City *Electrical $25.00 $50.00 *Plumbing 25.00 50.00 *Mechanical 25.00 50.00 New construction permit fees include individual trade permit fees. Individual Trade Permits are required for utility service rebuilds & appliance replacements. PLAN REVIEW FEE Typically assessed only when SBCCI, outside consultant, or City staff specialists conducts the review. This is generally applicable only to large construction projects and then the fee is set by the reviewer and assessed directly to the client. FLOODPLAIN REVIEW $50.00 Assessed only if an investigation is required to determine whether the proposed construction is located within the floodplain. , UVAIDOXV21101re"T SWIMMING POOL INSPECTION Private Public pa-Je- ,.i ii W LM I Ley A I Alt� REINSPECTION FEE Per Residential Inspection Per Commercial Inspection Water Meter Connections 31411 ill 1 1/2" 2" Greater than 2" $15.00 "Gallon capacity $45.00/Pump M291011WOE'Ano EREQ100,11011 Siam $350.00 500.00 650.00 950.00 50.00/Meter + actual cost of $500.00 650.00 800.00 1100.00 200.00/Meter + materials & labor PLUS Engineering and Inspection Fee Residential: Single Family $500.00/Dwelling unit Multi -Family (2 or more units) $250.00/Dwelling unit Non Residential $.20/Sq. Ft. area Sewer Tao Connections 411 $300.00 $450.00 611 450.00 600.00 811 650.00 800.00 Greater than 8" 50.00/Meter + 200.00/Meter + actual cost of materials & labor PLUS Engineering and Inspection Fee Residential: Single Family $500.00/Dwelling unit Multi -Family (2 or more units) $250.00/Dwelling unit Commercial $.06/Sq. Ft. area Industrial $.10/Sq. Ft. area Electrical Connections Single Phase Power 0-200 Amps 201-400 Amps Greater than 400 Amps Three Phase Power 0-200 Amps 201-400 Amps Greater than 400 Amps $400.00 600.00 Actual cost of materials & labor $1550.00 2500.00