HomeMy WebLinkAboutRES 990622-Xe :� +E • iN•.; ! • • !� • WHEREAS, a contract with the Texas Department of Economic Development on behalf of Rivery Partners, Ltd. was approved by the City Council on April 27, 1999; and WHEREAS, more stringent drainage requirements from the Texas Natural Resource Conservation Commission will result in increased drainage construction costs; and WHEREAS, it has been determined that a four -lane road is not necessary to support the project, so therefore, a two -lane road will be constructed; and WHEREAS, the resulting savings will be applied to the drainage construction. NOW, THEREFORE, • • OF *F GEORGETOWN, SECTION 1. The facts and recitations contained in the preamble of this resolution are hereby found and declared to be true and correct, and are incorporated by reference herein and expressly made a part hereof, as if copied verbatim. The City Council hereby finds that this resolution implements the following policy or policies of the Century Plan - Policy Plan Element: 1. Economic Development Policy End 1.0, which states: "Georgetown's economy is self - sustaining through diversified growth, a broad tax base with minimal impact from economic fluctuation, enhanced business opportunity and job creation." 1. Economic Development Focus End 1.1, which states: "Existing undeveloped sites in Georgetown are put to beneficial use." SECTION 2. The Georgetown City Council has reviewed and approves the following change by contract amendment to the original contract with the Texas Department of Economic Development on behalf of Rivery Partners, Ltd.: "Due to the increased drainage construction costs resulting from more stringent drainage requirements, and due to the fact that a four -lane road is not necessary to support the project, a two -lane road will be constructed, and the resulting savings will be applied to the drainage construction." Rivery Amendment Resolution No. 2 Page 1 of 2 SECTION 3. The Georgetown City Council hereby authorizes the Mayor to execute the amendment and otherwise act on the City's behalf in all matters pertaining to the submission of this contract amendment. SECTION 4. The Mayor is hereby authorized to execute, and the City Secretary to attest thereto this resolution on behalf of the City of Georgetown. SECTION 5. This resolution shall be effective immediately upon adoption. RESOLVED this 121 C day of Ayes: Nays: CITY OF GEORGETOWN: f. MaryEllen Kersch Mayor FTAI "i• 1090: 1 10 SWAN a I Lei • Marianne Landers Banks City Attorney Rivery Amendment Resolution No. V!Fo & 2.2 - Page 2 of 2 -j- ct oe 1999. Absent: ATTEST: Sandra D. Lee City Secretary Ur Ai*ifR mus SEC. Fe---1 CAR. H 51.10r 231 • r i!>ICHTON - LAND FArtat ej G"-fm f 9 4u-"Go C 62511, a • oe*so,w %% % I,- R - C 35.04, cs L v 949.9 . I' m3rn,321c C ® 049.59' 3S.117 ACKLES ct PARCEL '0' TEX-f5 PARKS ARV R(!CIIE-AT K)N Foumm.nom DOC NO. 9"39297 a • oe*so,w %% % I,- R - C 35.04, cs L v 949.9 . I' m3rn,321c C ® 049.59' 08/27/98 BUDGET JUSTIFICATION FOR TWO LANE ROAD COST REVISED TO REFLECT CURRENT CONSTRUCTION COST Revlsecl 8t32199 to Show Bireak 'Down ot Grant Funds, Deve r Funds and Tblal Project Cbst ACTIVITY I UNIT # OF TOTAL GRANT j PRICE UNITS COST FUNDS MISCELLANEOUS: j MOBILIZATION ; $5,000.00 L.S. $5,000.00 BONDS ` $7,004.00 L.S. $7,000.00 i CLEAN -UP AND FINAL GRADING $5,000.00 L.S. $5,000.00 E j SEEDING $1,000.00 L.S. $1,000.00 TOTAL MISCELLANEOUS j S98,ti.6{Y' IRiVERY BLVD. IMPROVEMENTS: j EXCAVATION /EMBANKMENT $7.00 18,400 S.Y. $128,800.00 CURB & GUTTER $12.50 4,800 L.F. $60,000.00 i SUBGRADE PREP. $1.50 8,004 S.Y. $12,000.00 j 22" COMPACTED BASE j $16.00 8,000 S.Y. $128,000.00 2 -1/7 HMAC $5.50 7,500 S.Y. $41,250.00 REFLECTIVE PVT. STRIPPING $4.20 9,200 L.F. $1,840.00 TOTAL RIVERY BLVD. IMPROV. j $371 89040, j DRAINAGE IMPROVEMENTS: AREA INLET $2,500.00 1 EA. $2,500.00 1p' INLET $4,000.00 6 EA. $24,000.00 15' INLET $5,000.00 1 EA. $5,000.00 R.C.P. STORM SEWER PIPE I $60.00 1,000 L.F. $60,000.00 JUNCTION BOX / MANHOLE j $3,500.00 4 EA. $14,000.00 CONCRETE HEADWALL { $3,004.00 3 EA. $9,000.00 WATER QUALITY POND � $35,000.00 3 EA. $105,040.00 j ENVIRONMENTAL (WPAP/TNRCC) $5,000.00 L.S. $5,000.00 ( TOTAL DRAINAGE IMPROVEMENTS 4,5MOO: !WATER IMPROVEMENTS: i I 6" C -900 WATER LINE $30.00 210 L.F. $6,300.00 8" C -900 WATER LINE $40.00 3,215.00 $128,600.00 6" GATE VALVE & BOX $850.00 1 EA. $850.00 v 8" GATE VALVE & BOX I $1,000.00 10 EA. $10,000.00 ` 16" x 8" WET CONNECTION j $6,500.00 L.S. $6,500.00 ( 5 -1/4" FIRE HYDRANT ASSEMBLY i $2,500.00 16 EA. $40,000.00 TOTAL WATER IMPROVEMENTS W,OWOO, $1.79,45O.M. j i j PROJEcfi COST SUBTOTAL (Grant Funds)' $55t;34titlti PROJECT COST SUBTOTAL (Pevefoper funds} $255,300.0 i - PROJECT COST S,Oi3t JTAL (Grant f E)eveicper Funds} $8i�6,�t i,f70 * Opinion of probable costs for public improvements shown represent the minimum necessary to provide service to the project site. * Costs shown reflect Davis -Bacon Wage Rates. C:\ 123R5Ntiw4RK \RiVERYIRVERYRT4.WK4 _ i � BUDGET JUSTIFICATION FOR TWO LANE ROAD COST REVISED TO REFLECT CURRENT CONSTRUCTION COST 08/27/98 Page 2 of 2 JI ACTIVITY UNIT # OF TOTAL L� PRICE UNITS COST i IWASTEWATER IMPROVEMENTS: 8" WASTEWATER LINE $50.00 1,450 L.F. $72,000.00 D. 4' DIA. MANHOLE $3,000.00 3 EA. $9,000.00 TOTAL WASTEWATER IMPROV. ' ENGINEERING: BASIC ENGINEERING $72,000.00 SPECIAL SERVICES $50,000.00 CONSTRUCTION INSPECTION $26,660.00 TOTAL ENGINEERING - — $146,660.00 °! T OJEC i COST: tsratt €Fun , s $?t 3,00{?.t#0` TdT'A# # JeCT- ?COST�** FiAinds) ,SM300.00 TOTAL PROJECT Gt3S ,(Grans+ r und i f, * Opinion of probable costs for public improvements shown represent the minimum necessary to provide service to the project site. * Costs shown reflect Davis -Bacon Wage Rates. " ~) Signature � Date Ci123R5MWORKXRtVERY\RVERYRT4.W K4 E rIq s * OPINION OF PROBABLE COST FOR FOUR LANE ROAD COSTS REFLECT CURRENT CONSTRUCTION COST ACTIVITY UNIT # OF TOTAL PRICE UNITS COST J MISCELLANEOUS: MOBILIZATION $10,000.00 L.S. $10,000.00 BONDS $14,000.00 L.S. $14,000.00 CLEAN -UP AND FINAL GRADING $10,000.00 L.S. $10,000.00 SEEDING $2,000.00 L.S. $2,000.00 TOTAL MISCELLANEOUS 3S,i 00.00: RIVERY BLVD. IMPROVEMENTS: EXCAVATIONIEMBANKMENT $7.00 18,400 S.Y. $128,800.00 CURB & GUTTER $12.50 8,800 L.F. $110,000.00 SUBGRADE PREP. $1.50 16,800 S.Y. $25,200.00 22" COMPACTED BASE $16.00 16,800 S.Y. $268,800.00 2 -1/2" HMAC $5.50 15,300 S.Y. $84,150.00 REFLECTIVE PVT. STRIPPING $0.20 19,000 L.F. $3,800.00 TOTAL RIVERY BLVD. IMPROV. i S2#1,7SU Ems: !DRAINAGE IMPROVEMENTS: I I AREA INLET $2,500.00 1 EA. $2,500.00 I 10' INLET $4,000.00 6 EA. $24,000.00 15' INLET $5,000.00 1 EA. $5,000.00 R.C.P. STORM SEWER PIPE I $60.00 1,000 L.F. $60,000.00 JUNCTION BOX/ MANHOLE I $3,500.00 4 EA. $14,000.00 CONCRETE HEADWALL ; $3,000.00 3 EA. $9,000.00 WATER QUALITY POND $35,000.00 3 EA. $105,000.00 C ENVIRONMENTAL (WPAP/TNRCC) $5,000.00 L.S. $5,000.00 TOTAL DRAINAGE IMPROVEMENTS $224.5W.00 I WATER IMPROVEMENTS: ^_- 6'C-900 WATER LINE $30.00 210 L.F. $6,300.00 8" C -900 WATER LINE $40.00 3,215.00 $128,600.00 j 6" GATE VALVE & BOX $850.00 1 EA. $850.00 8" GATE VALVE & BOX $1,000.00 10 EA. $10,000.00 16!'x 8" WET CONNECTION $6,500.00 L.S. $6,500.00 5 -1/4" FIRE HYDRANT ASSEMBLY $2,500.00 16 EA. $40,000.00 TOTAL WATER IMPROVEMENTS PROJECT COST 5116T0T L'(Page 1 of'2 }) $ -5W.00 * Opinion of probable costs for public improvements shown represent the minimum necessary to provide service to the project site. * Costs shown reflect Davis -Bacon Wage Rates. C: 5923R51MWCDRKIRNERYIRVERYRT5 .WK4