Loading...
HomeMy WebLinkAboutTransportation CIP FY 2014/2015 C ITY OF G EORGETOWN , TEXAS C APITAL I MPROVEMENT P LAN S TREETS /DRAINAGE /A IRPORT F ISCAL Y EAR 2014-15 Georgetown Transportation Advisory Board April 11, 2014 DR A F T Table of Contents Introduction ............................................................................................................... 1 Transportation Division Streets Introduction .......................................................................................... 2 Streets Projects ................................................................................... 5 Stormwater Introduction ........................................................................................ 12 Stormwater Projects .......................................................................... 15 Airport Introduction……………………………………………………………….. 20 Airport Projects……………………………………………………….…... 22 DR A F T Capital Improvement Plan The City of Georgetown annually updates and adopts a five-year Capital Improvements Plan (CIP) Schedule as part of the operating budget adoption process. Needed capital improvements are identified through system models, repair and maintenance records, and growth. The City uses a team approach to prioritizing capital improvement projects, whereby City staff from all operational areas provide input and ideas relating to each project and its effect on operations, such as: Fire and Police Services staff provides insight into a project’s impact on emergency traffic responses, public lighting issues and other public safety concerns. Planning & Development staff gives direction regarding new development and the infrastructure needs relating to this growth. Other utility departments, such as the Transportation Department, Electric Department and Water Services Department exchange information regarding each project and coordinated timing of many of the related projects in an effort to create less inconvenience for the citizens affected. The timeline for the CIP planning process is outlined below: By using this team approach, the City develops cooperation among the departments, identifies potential problem areas, and prioritizes financing issues. The Capital Improvements Projects (CIP) generally consists of infrastructure and related construction and do not include small capital items such as furniture, equipment and vehicles. Significant maintenance projects, such as street repairs are not included in the capital project schedules. These maintenance type projects are not capitalized as a fixed asset and are always cash funded; therefore, they are considered operational in nature and are included in the departmental operating budget. The CIP schedules consolidate the capital spending priorities for all operating activities of the City, including all governmental and enterprise activities that provide services to the citizens of Georgetown. The CIP Schedules are included as part of the annual operating budget. The first year of the list becomes the capital budget for the approved budget year. The following pages outline the CIP Schedule for each activity and include anticipated projects, current year project location and sources of funding. January Initial Department Meetings formulating projects in CIP February / March Division Meetings to coordinate projects in CIP Finalized funding plan May / June Present CIP to Boards and City Council September Adopted along with Annual Operating Plan Funding Operating Revenue 800$ Street Maintenance Sales Tax2,625 General Fund 947 Self Supporting Debt 2,305 General Obligation Bonds 835 Total Funding 7,512$ Project Costs Transportation Division Streets 3,570$ Stormwater Drainage 3,015 Airport Services 799 Debt Issuance Cost 128 Total Project Cost 7,512$ 2014 / 15 Capital Improvement Summary (in thousands) 1 DR A F T Transportation Services Introduction Transportation Services manages, maintains and repairs City streets and right-of-way. Some of the additional responsibilities of the Street Department include traffic control, emergency response operations, special events, and assistance in code enforcement. Daily responsibilities include inspection of roadways for sign repair, pavement management and removal of sight obstructions. Transportation Services has experienced a growth in demand for maintenance and rehabilitation of the City’s roadway system. The Street Department Capital Improvement Budget includes maintenance and rehabilitation of the City’s roadway system and support of new transportation construction projects. Funding for maintenance and rehabilitation from the City’s General Fund is approximately $875,000 annually. Street Maintenance Sales Tax In November 2002, voters passed a quarter- cent sales tax increase that became effective April 1, 2003. Proceeds from the new tax can only be used to make improvements to streets in existence at the time of the election and cannot be used for construction of new streets. Revenues from this tax equal approximately $2 million per year for maintenance and rehabilitation of City streets. The tax was reauthorized by voters in November 2010; the tax will be brought back to the voters for reauthorization in November 2014. This presentation assumes the quarter-cent sales tax will pass in November. Adjustments to this budget and projects will be made accordingly, if the tax is not reauthorized. Georgetown Transportation Enhancement Corporation In May 2001, voters approved a 4B half-cent sales tax for transportation improvements that provide economic benefit to the community. The 4B is known as the Georgetown Transportation Enhancement Corporation (GTEC). GTEC approves projects funded through this sales tax. Overall Transportation Improvement Plan The City adopted its Transportation Plan (OTP) to guide the City’s growth and development, a revision to the OTP is currently underway. It is through this plan that 2 DR A F T future road construction is projected. As part of this process, GTAB recommends potential projects to GTEC and the GTEC board approves its annual Transportation Improvement Plan (TIP) which includes projects identified in the City’s overall Transportation Plan that meet the GTEC eligibility requirements. The TIP is a five-year projection and is updated annually with year one being the annual GTEC budget this is approved by the City Council. The GTEC budget is not included in this CIP document. The OTP is reviewed by GTAB which makes recommendations to the City Council. In November 2008, voters authorized $46 million of General Obligation debt to be issued for road improvements. This CIP budget does not currently include improvements authorized in the bond. Historic Downtown In the past few years, several rehabilitation and maintenance projects have focused on the Historic Downtown Square Area. The City will continue efforts to maintain and rehabilitate Historic Georgetown, as well as keep pace with the growth of our community. GASB 34 – Modified Approach The Governmental Accounting Standards Board Statement Number 34 allows for an alternative to depreciation expense for certain infrastructure, termed the modified approach. The following conditions must be met:  The government manages the eligible assets using an asset management system to: o Keep an up-to-date asset inventory, o Perform condition assessments and report the results on a measurement scale, and o Estimate the annual amount to maintain and preserve the eligible infrastructure assets at the condition level established and disclosed by the government  The government must document that the eligible assets are being preserved approximately at or above the condition level established and disclosed by the government. The City completed its inventory and implemented its pavement management information system in February 2005. The initial assessment rated Georgetown’s street condition as “good” with a 90 pavement condition index. The Council has directed staff to incorporate a policy to maintain a minimum average PCI of 85. Current funding should adequately fund that level of PCI within Georgetown for near future. The PCI for fiscal year 2011 was 87.7. Growth factors, including the construction of major roads, such as Inner Loop, could impact that condition over time. This system will be monitored closely and reviewed in detail again in late 2014. The proposed CIP includes funding for an update of the Pavement Management System in 2015. 3 DR A F T 2014/15 2015/16 2016/17 2017/18 2018/19 Total (Thousands of dollars) Projected Annual Project Cost $3,570$3,625$3,775$3,900$4,050$18,920 Sources of Funding Street Maintenance Sales Tax $2,625$2,750$2,900$3,025$3,175$14,475 General Fund & Other $945$875$875$875$875$4,445 City of Georgetown, Texas Transportation Capital Improvement Program 2014/15 to 2018/19 ThecapitalbudgetincludesmajorrehabilitationoftheCity'sroadwaysystems.InNovember2002,votersfirstapprovedaquartercent salestaxformaintenanceofexistingCitystreets.Thissalestaxrevenueprovidesthemajorityoffundingforstreetrehabiliation projects.Thequartercentsalestaxmustbereauthorizedbythevoterseveryfouryears,itwillneedtobereauthorizedinNovember 2014. Street Maintenance Sales Tax General Fund & Other Combined 5 Year Estimated Funding Sources 4 DR A F T Prior Project Year 14/15 15/16 16/17 17/18 18/19 (Thousands of dollars) Current Projects: Street Rehabilitation 1,019 945 875 875 875 875 Chip Seal 539 378 300 482 500 550 Rejuvenate 483 501 326 452 600 650 Cutler Process 1,700 1,171 1,000 1,019 1,000 1,000 Point Repair - - 236 351 341 384 Arterials Reserves Arterials Reserves 819 575 888 596 584 591 Totals 4,560 3,570 $3,625 $3,775 $3,900 $4,050 Projected City of Georgetown, Texas Transportation Capital Improvement Program 2014/15 to 2018/19 $0 $1,000 $2,000 $3,000 $4,000 $5,000 $6,000 $7,000 $8,000 $9,000 08/0909/1010/1111/1212/1313/1414/1515/1616/1717/18 Th o u s a n d s Streets Capital Project Cost 5 DR A F T C.I.P. 2014-15Street Rehabilitation April 2014 U0 10.5 Miles Document Path: L:\Division\Gus\ENGINEERING SUPPORT\PROJECTS\CIP\2014-15\CIP 2014-15 Streets Rehab.mxd Project List2014 - 2015 Street Rehabilitation 2nd St Stadium-CR152 (Design Only) W 10th W 11th St Signal at Williams Dr/Jim Hogg Rd City Limits 6 DR A F T Responsible Division: Street Department Financial Plan (thousands of dollars) : Prior Budget Years 14/15 15/16 16/17 17/18 18/19 Total 819 575 888 596 584 591 4,053 Description : Funding Sources : Funded with Street Maintenance Sales Tax 14/15 15/16 16/17 17/18 18/19 Arterials 575 888 596 584 591 Operating Budget Impact (000):No Material Impact 14/15 15/16 16/17 17/18 18/19 Notes: Subprojects (000): Basis for Estimate City of Georgetown, Texas Capital Improvement Program Arterials Reserves Projected Arterials are a higher classification of roadway from residential and collector streets. Arterials are usually built to a higher standard to accommodate a high volume of residential and truck traffic. The heavy vehicles and high volumes on these roads can cause and exponential rate of deterioration when pavement scores begin to fall below acceptable levels. A higher priority is placed on this classification when evaluating scores for the funds to be spent here for treatment and maintenance. Photo / Map Placeholder 7 DR A F T Responsible Division: Street Department Financial Plan (thousands of dollars) : Prior Budget Years 14/15 15/16 16/17 17/18 18/19 Total 1,019 945 875 875 875 875 5,464 Description : Funding Sources : Funded with General Fund and Steets Maintenance sales tax. 14/15 15/16 16/17 17/18 18/19 Stadium -CR 152Austin Ave to Berry Springs44 375 - - - W. 10th Austin Ave to Church St 50 - - - - W. 11th St Main St to Rock St.231 - - - - Traffic Light installWilliams Dr @ Jim Hogg Rd320 - - - - 2nd St Myrtle to College 300 - - - - N. Myrtle St - 25 - 175 - N. Church St - 25 - 175 - CR 110 - 50 - 275 - Katherine St - 50 200 - - 17th St - 75 350 - - Main St - 75 - - 225 N. Main St - 160 - - - Others as Determined - 40 325 250 650 Operating Budget Impact (000):No Material Impact 14/15 15/16 16/17 17/18 18/19 Notes: Subprojects (000): Basis for Estimate City of Georgetown, Texas Capital Improvement Program Street Rehabilitation Projected Streets listed as subprojects under "Rehabilitation" were identified as being in most need of repair or rehabilitation because of their asphalt and subgrade failures, drainage problems and deteriorating curbs. Subgrade stabilization, valley gutter installation and curb and gutter addition or replacement are combined with surface treatments to bring the pavement condition back into the high 90s. Photo / Map Placeholder 8 DR A F T Responsible Division: Street Department Financial Plan (thousands of dollars) : Prior Budget Years 14/15 15/16 16/17 17/18 18/19 Total 984 501 326 452 600 650 3,513 Description : Funding Sources : Funded with Street Maintenance Sales Tax 14/15 15/16 16/17 17/18 18/19 Rejuvenator 501 326 452 600 650 Operating Budget Impact (000):No Material Impact 14/15 15/16 16/17 17/18 18/19 Notes: Basis for Estimate City of Georgetown, Texas Capital Improvement Program Rejuvenate Projected Subprojects (000): Application of asphalt pavement to provide ultraviolet protection and seal minute cracks and pavement flaws. Restores a uniform dark asphalt color to pavement covering the squeegee lines left after crack sealing. This process applied to pavement in moderately good condition can prolong the need for more costly applications. Photo / Map Placeholder 9 DR A F T Responsible Division: Street Department Financial Plan (thousands of dollars) : Prior Budget Years 14/15 15/16 16/17 17/18 18/19 Total 321 378 300 482 500 550 2,531 Description : Funding Sources : Funded with Street Maintenace Sales Tax 14/15 15/16 16/17 17/18 18/19 Chip seal 378 300 482 500 550 Operating Budget Impact (000):No Material Impact 14/15 15/16 16/17 17/18 18/19 Notes: Subprojects (000): Basis for Estimate City of Georgetown, Texas Capital Improvement Program Chip Seal Projected Oil and rock maintenance application to provide a seal and wear protection, sealing current cracks and making a self healing barrier for new cracks. Arterial streets include , Inner Loop 971 to SH29 & Belmont Dr to S Austin Ave., Airport Rd, Berry Creek drive (Airport Rd to SH 195) Local collector streets include Maple St, Inner Loop to Pennacle Sub., Church St. 15th to 21st St. Photo / Map Placeholder 10 DR A F T Responsible Division: Street Department Financial Plan (thousands of dollars) : Prior Budget Years 14/15 15/16 16/17 17/18 18/19 Total 858 1,171 1,000 1,019 1,000 1,000 6,048 Description : Funding Sources : Funded with Street Maintenace Sales Tax 14/15 15/16 16/17 17/18 18/19 Cutler Process 1,171 1,000 1,019 1,000 1,000 Operating Budget Impact (000):No Material Impact 14/15 15/16 16/17 17/18 18/19 Notes: Photo / Map Placeholder Basis for Estimate City of Georgetown, Texas Capital Improvement Program Cutler Process Projected Subprojects (000): Streets listed as subprojects under "Maintenance" were identified as being in most need of surface treatments with only minor repairs to roadways. Roadways are evaluated by history, condition, age and number and type of previous treatments performed. 11 DR A F T Stormwater Drainage Utility Introduction The Stormwater Drainage Utility manages and maintains stormwater infrastructure operations and facilities. Some of the additional responsibilities of the Stormwater Drainage Utility are assisting other Divisions in City code enforcement. Daily responsibilities include drainage and flood control when needed, right-of-way mowing and cleaning, street sign maintenance and street cleaning operations. The Stormwater Drainage Utility has been focusing on meeting the Environmental Protection Agency’s (EPA) Phase II regulations and requirements regarding stormwater control in municipalities. In 2015, the City expects to continue efforts to meet the forthcoming stormwater control mandates. The 2014/15 Five Year Capital Improvement Plan (CIP) includes projects aimed at improving stormwater drainage, erosion control and the compilation of stormwater assets. The Smith Branch buy-outs are a three year program to buy-out 16 homes in San Jose and Quail Valley neighborhoods. 12 DR A F T 2014/15 2015/16 2016/17 2017/18 2018/19 Total (Thousands of dollars) Projected Annual Project Cost $3,015$400$400$2,550$400$6,765 Debt Issuance Cost $90$0$0$90$0$180 Sources of Funding Operating Revenue $800$400$400$640$400$2,640 Utility Revenue Debt $2,305$0$0$2,000$0$4,305 City of Georgetown, Texas Stormwater Capital Improvement Program 2014/15 to 2018/19 TheCitywillbedeterminingasourceofrevenuetofundtheEPAPhaseIIregulations,theRegionalStormwaterPlan,and otherrequirementsregardingstormwatercontrolwithinmunicipalities.Themostlikelyrevenuesourceisthrougha combination of stormwater fees and developer fees paid in-lieu of onsite detention. Operating Revenue Utility Revenue Debt Combined 5 Year Estimated Funding Sources 13 DR A F T 1606 2207 1602 2304 1708 1604 1706 1600 TRAILSENDDR GR E E N B R A N C H D R QUAIL V A L L E Y D R Q U A I L M E A D O W D R LON G B R A N C H D R H U N TERSGLENRD R I F L E B E N D D R C.I.P. 2014-15Stormwater Drainage April 2014 U0 0.0250.0125 Miles Document Path: L:\Division\Gus\ENGINEERING SUPPORT\PROJECTS\CIP\2014-15\CIP 2014-15 StormwaterDrainage.mxd Smith Branch Buy-Outs 2207 HUNTERS GLEN DR 1708 GREENBRANCH DR 1706 GREENBRANCH DR 1606 GREENBRANCH DR 1604 GREENBRANCH DR 1602 GREENBRANCH DR 1600 GREENBRANCH DR 2304 TRAILS END DR City Limits 14 DR A F T Prior Project Years 14/15 15/16 16/17 17/18 18/19 (Thousands of dollars) New Projects: Curb and Gutter Replacements 765 300 300 300 300 300 Stormwater Infrastructure Upgrades 200 100 100 100 100 100 Smith Branch Buy-outs 885 2,215 - - - - Serenada Culvert Improvement - - - - 500 - NW Blvd Drainage - - - - 350 - Airport Road @ Pecan Branch - - - - 1,300 - Regional Flood Study - 400 - - - - Totals $1,850 $3,015 $400 $400 $2,550 $400 Projected City of Georgetown, Texas Stormwater Capital Improvement Program 2014/15 to 2018/19 $0 $500 $1,000 $1,500 $2,000 $2,500 $3,000 $3,500 08/0909/1010/1111/1212/1313/1414/15*15/16*16/17*17/18* Th o u s a n d s Stormwater Capital Project Cost 15 DR A F T Responsible Division: Stormwater Drainage Financial Plan (thousands of dollars) : Prior Budget Years 14/15 15/16 16/17 17/18 18/19 Total 765 300 300 300 300 300 2,265 Description : Funding Sources : Funded with cash from Drainage Utility 14/15 15/16 16/17 17/18 18/19 Curb and Gutter Replacement 300 300 300 300 300 Operating Budget Impact (000):No Material Impact 14/15 15/16 16/17 17/18 18/19 Notes: MAP OR PHOTO Basis for Estimate City of Georgetown, Texas Capital Improvement Program Curb and Gutter Replacements Subprojects (000): Projected This project will consist of replacing deteriorating stand-up curbs with curb and gutter. Stand-up curbs throughout the City will be evaulated on their condition and their potential to cause damage to roadways. The curbs identified in areas with the poorest drainage are most likely to contribute to road damage. These curbs will be targeted for replacement. These replacements will save the City from having to perform much more costly street rehabilitation. 16 DR A F T Responsible Division: Stormwater Drainage Financial Plan (thousands of dollars) : Prior Budget Years 14/15 15/16 16/17 17/18 18/19 Total 100 100 100 100 100 100 600 Description : Funding Sources : Funded with cash from Drainage Utility 14/15 15/16 16/17 17/18 18/19 Stormwater Infrastructure Upgrade 100 100 100 100 100 Operating Budget Impact (000):No Material Impact 14/15 15/16 16/17 17/18 18/19 Notes: City of Georgetown, Texas Capital Improvement Program Stormwater Infrastructure Upgrades Projected MAP OR PHOTO Subprojects (000): Basis for Estimate Rehabilitation of ponds above and beyond monthly mowing and trash or debris removal. Examples may include dredging of ditches, stormwater boxes or water quality / detention ponds; construction of end treatments, fencing and alterations of existing storm drain features; and removal and replacement of filtration devices. 17 DR A F T Responsible Division: Stormwater Drainage Financial Plan (thousands of dollars) : Prior Budget Years 14/15 15/16 16/17 17/18 18/19 Total 885 2,215 - - - - - 3,100 Description : Funding Sources : Funded with cash from Drainage Utility and utility revenue debt. 14/15 15/16 16/17 17/18 18/19 Smith Branch Buy-outs 2,215 - - - - Operating Budget Impact (000):No Material Impact 14/15 15/16 16/17 17/18 18/19 Notes: Basis for Estimate City of Georgetown, Texas Capital Improvement Program Smith Branch Buy-outs Subprojects (000): Map of Downtown Ponds Projected Three year phased program to buy-out 16 homes in San Jose and Quail Valley neighborhoods. Year 3 will include debt issuance. Smith Branch Watershed Master plan included several options ranging form channel improvements, on-site or off-site detention to buy outs. A 3 year buy-out option was selected by City Council. Includes Pre-disaster mitigation planning to potentially receive federal funding for 2013/14 and beyond to reduce local contribution. 18 DR A F T Responsible Division: Stormwater Drainage Financial Plan (thousands of dollars) : Prior Budget Years 14/15 15/16 16/17 17/18 18/19 Total 400 - - - - - 400 Description : Funding Sources : Funded with cash from Drainage Utility and grants. 14/15 15/16 16/17 17/18 18/19 Flood Study 400 - - - - Operating Budget Impact (000):No Material Impact 14/15 15/16 16/17 17/18 18/19 Notes: Subprojects (000): Basis for Estimate City of Georgetown, Texas Capital Improvement Program Regional Flood Study Projected Map of Downtown Ponds Staff has applied for a Texas Water Development Board grant to study and update the Flood Insurance Rate Maps (FIRM) and more accurately define floodplain limits within all of our major drainage basins. The grant is a 50/50 share. The State would reimburse $200K and the City would be responsible for the remainder (including in-kind contributions). 19 DR A F T Airport Services Introduction Airport Services manages, maintains and repairs City airport. Some of the additional responsibilities of the airport department include traffic control, emergency response operations and special events. Daily responsibilities include inspection of runways for sign repair, pavement management and removal of sight obstructions. Airport Services has experienced a growth in demand for maintenance and rehabilitation of the City’s runway system. 20 DR A F T 2014/15 2015/16 2016/17 2017/18 2018/19 Total (Thousands of dollars) Projected Annual Project Cost $799$200$0$0$0$999 Bond Issuance Cost $38$9$0$0$0$47 Sources of Funding General Obligation Bonds $835$200$0$0$0$1,035 Operating Revenues $2$9$0$0 $0$11 City of Georgetown, Texas Airport Capital Improvement Program 2014/15 to 2018/19 TheAirportfiveyearCapitalImprovementProgramfundingcomesfromacombinationofcashcontributionsand previous year-end excess funds. $0 $100 $200 $300 $400 $500 $600 $700 $800 $900 10 / 1 1 11 / 1 2 12 / 1 3 13 / 1 4 14 / 1 5 15 / 1 6 16 / 1 7 17 / 1 8 Th o u s a n d s Capital Project Cost 21 DR A F T Prior Project Year 14/15 15/16 16/17 17/18 18/19 (Thousands of dollars) Runway 1836 Runway 1836 Lights 111 - - - - - Parallel TW-A & MITL - 799 - - - - Airport Master Plan - - 200 - - - Totals 0 799 200 - - - Projected City of Georgetown, Texas Airport Capital Improvement Projects 2014/15 to 2018/19 22 DR A F T Responsible Division: Airport Financial Plan (thousands of dollars) : Prior Budget Year 14/15 15/16 16/17 17/18 18/19 Total 25 799 - - - - 824 Description : Funding Sources : Airport fund & General Obligation bonds 14/15 15/16 16/17 17/18 18/19 Runway 36 parallel 719 - - - - Fuel farm 80 Operating Budget Impact (000):No Material Impact 14/15 15/16 16/17 17/18 18/19 Notes: Subprojects (000): Basis for Estimate City of Georgetown, Texas Capital Improvement Program Parallel Taxi Way to Rw 36 Projected Photo / Map Placeholder Engineering/design for parallel TW to Runway 36. TxDOT Aviation project: 2014-0001 construction 2015 23 DR A F T