HomeMy WebLinkAboutORD 2005-75 - Airport PUDOrdinance No. on `
An Ordinance of the City Council of the City of Georgetown, Texas, revising the Planned Unit
Development - Development Plan for the Georgetown Municipal Airport as originally adopted
by Ordinance No. 99-20 and amending part of the zoning district map adopted on the 4'" Day of
April 2002 in accordance with the Unified Development Code passed and adopted on the 110, day
Of March 2003, to change the base zoning district used in conjunction with the Planned Unit
Development District for the Georgetown Municipal Airport, being 518.997 acres in the David
Wright Survey, from RS, Residential Single-family District to IN, Industrial District; repealing
conflicting Ordinances and Resolutions; including a severability clause; and establishing and
effective date.
Whereas, an application has been made to the City Council for the purpose of amending the
PUD — Development Plan and changing the base zoning district classification of the following
described real property ("the property"):
Property Owned By The City Of Georgetown, Being 518.997 Acres In The David Wright
Survey, Located At 500 Terminal Drive And Known As The Georgetown Municipal
Airport, Hereinafter Referred To As "The Property'
Whereas, the City Council accepted an update to the Airport Master Plan on July 26, 2005;
and
Whereas, the updated Airport Master Plan identifies a Short, Medium and. Long -Range
Development Plan guiding the physical development of the airport for a 20 -year planning horizon;
and
Whereas, the updated Master Plan represents a major revision to the development plan
adopted with Ordinance No. 1999-20; and
Whereas, Section 4.04.030(A)(6) of the Unified Development Code requires that Major
Revisions to PUD - Development Plans be processed consistent with the initial PUD approval, and
Whereas, the updated Airport Master Plan recommends that the City initiate a rezoning of
the existing airport property to Planned Unit Developmentwith IN, Industrial as the underlying
base district; and
Whereas, the City Council has submitted the proposed change in the Development Plan and
Base Zoning District to the Planning and Zoning Commission for its consideration in a public
hearing and for its recommendation or report; and
pm 4.OP5.15
Airport PUD Amendment
P d 1 Of 3
Whereas, notice of such hearing was published in a newspaper of general circulation in the
City; which stated the time and place of hearing, which time was not earlier than fifteen (15) days
for the first day of such publication; and
Whereas, written notice was given not less than fifteen (15) days before the date set for the
meeting before the Planning and Zoning Commission to all the owners of the lots within two
hundred feet of the property, as required by law; and
Whereas, the applicant for such Development Plan revision and Base Zoning District
amendment placed on the property such sign(s) as required by law for advertising the Planning and
Zoning Commission hearing, not less than fifteen (15) days before the date set for such hearing; and
Whereas, the City Planning and Zoning Commission in a meeting held on November 1,
2005 recommended to the City Council Approval of the requested Development Plan revision and
Base Zoning District amendment, subject, for the above-described property.
Now, Therefore, Be It Ordained By The City Council Of The City Of Georgetown, Texas,
That:
Section 1. The facts and recitations contained in the preamble of this ordinance are hereby
found and declared to be true and correct, and are incorporated by reference herein and expressly
made a part hereof, as if copied verbatim. The City Council hereby finds that this ordinance
implements the following objective of the Georgetown Century Plan, Future Land Use and
Thoroughfare Plan:
s Objective 1.3: Ensure that new developments will be compatible with existing land uses in terms
of use, density, building heights, scale, and offsite effects.
Allowed uses within the recommended PUD -IN district are compatible with the
existing airport development.
0 Objective 1.5: Require zoning change requests to be consistent with the Future Land Use Plan,
The Future Land Use Plan designation for the site is "Public / Semi -Public", which
is appropriate for a municipal facility,
and further finds that the enactment of this ordinance is not inconsistent or in conflict with any
other Century Plan Policies, as required by Section 2.03 of the Administrative Chapter of the Policy
Plan,
OM A005�75
Airport PUD Amendment
Section 2. The Development Plan revision and Base Zoning District amendment of the City,
as well as the Zoning District for the Property shall be and the same is hereby changed from Cl,
Local Commercial district classification to C-3, General Commercial district classification, in
accordance with attached Exhibit A which is attached hereto and incorporated by reference herein,
is hereby adopted by the City Council of the City of Georgetown, Texas, subject to the following
condition(s):
Section 3. All ordinances and resolutions, or parts of ordinances and resolutions, in conflict
with this Ordinance are hereby repealed, and are no longer of any force and effect.
Section 4. If any provision of this Ordinance or application thereof to any person or
circumstance, shall be held invalid, such invalidity shall not affect the other provisions, or
application thereof, of this Ordinance which can be given effect without the invalid provision or
application, and to this end the provisions of this Ordinance are hereby declared to beseverable.
Section 5. The Mayor is hereby authorized to sign this Ordinance and the City Secretary
to attest. This Ordinance shall become effective and be in full force and effect on the date of final
adoption by City Council.
Passed and Approved on First Reading on the 8th day of November 2005.
Passed and Approved on Second Reading on the 22nd day of November 2005.
Attest:
Sandra D. Lee
City Secretary
Approved As To Form:
Patricia E. Carls
City Attorney
The City Of Georgetown:
Mayor
T: \ CUR_PLAN \ REZONE \ REPORT \ 2005 \ Airport PUD.ordinance.doc
Airport PUD Amendment
DEVELOPMENT PLAN
FOR THE
GEORGETOWN MUNICIPAL AIRPORT
PLANNED UNIT DEVELOPMENT (PUD)
1. DEFINITIONS
All definitions listed in Chapter 16 of the Unified Development Code of the City of
Georgetown (the "Code') shall govern interpretation of this Development Plan. Any
terms not defined shall be interpreted using Random House Webster's Unabridged
Dictionary, subject to the approval of interpretation by the Director of Planning and
Development Services.
The following terms are defined by this Plan:
• Taxiways - A defined path, from one part of an airport to another, selected and
prepared for the movement of aircraft.
• Structures - Anything constructed or erected on the ground. Flatwork will be
considered a structure.
■ Setbacks - Front Setbacks along internal streets will be measured from the edge
of a roadway pavement. Setbacks along external streets will be measured from
property lines. Setbacks not included above will also be measured from property
lines.
Z. PROPERTY
This Development Plan (hereinafter referred to as the "Plan") covers approximately
518.997 acres of land located between Airport Drive and Northwest Boulevard, north of
Lakeway Drive, within the City Limits of Georgetown, Texas. The site is the location of
the Georgetown Municipal Airport.
3. PURPOSE
The primary purpose of this Plan is the implementation of the Georgetown Municipal
Airport — Airport Master Plan Update (July 19, 2005), adopted as an Element of the
City's Comprehensive (Century) Plan. As an implementation document it is the intent
that this Plan support the purpose, goals and objectives outlined in the Master Plan
Update.
1
Georgetown Municipal Airport
Planned Unit Development (PUD)
Cl.,. i.�lnrmont Plan nnr1P 1 of R
4. APPLICABILITY OF CITY ORDINANCES
4.1 Zoning
The Property shall be regulated for purposes of zoning by this Plan. All aspects not
specifically covered by this Plan shall be regulated by applicable sections of the Code.
All uses and development within the Property shall generally conform to the
Development Plan as set forth herein. The PUD is designed to be used in conjunction
with the Industrial District (IN), which is the zoning designation most similar to and
compatible with the uses proposed for the PUD. All standards and requirements of
Industrial District (IN) shall apply unless specifically superceded by the standards and
requirements of this Development Plan,
4.2 Other Ordinances
All other Ordinances within the Code of Ordinances of the City of Georgetown shall
apply to the Property, except as clearly modified by this Plan and by the Georgetown
Municipal Airport Master Plan Update (dated July 19, 2005).
5. PERMITTED USES AND LIMITATIONS
The PUD is designed to be used in conjunction with the Industrial District (IN) which is
the zoning designation most similar to and compatible with the uses proposed for the
PUD. All standards and requirements of the Industrial District (IN) shall apply unless
specifically superceded by the standards and requirements of t1 -ds Development Plan.
The allowed land uses on the airport property shall be limited to those uses specifically
identified by the "Ultimate Airport Land Use Plan" (Exhibit C). The location of such
uses shall be consistent with the locations identified on Exhibits B ("Long Term
Development Plan") and C ("Ultimate Airport Land Use Plan").
The allowed land uses are:
• Airfield
■ Public / Semi -Public Use
® T -Hangar
Commercial /Business
■ Office / Avigation — Related Public Use
Corporate / Fixed Based Operator
■ Drainage / Water Detention
Sections 4.1, 4.2, 4.3, 4.4 and 4.5 of the Master Plan update, which identify the proposed
future development plans are attached for reference.
2
Georgetown Municipal Airport
Planned Unit Development (PUD)
Development Plan, Page 2 of 6
6. DEVELOPMENT STANDARDS
As stated above, the PUD is designed to be used in conjunction with the Industrial
District (IN). All standards and requirements of the Industrial District (IN) shall apply
unless specifically superceded by the standards and requirements of this Development
Plan,
6.1 Height Restrictions
All height restrictions established for the Industrial District (IN) shall apply to all
buildings within the PUD. The Industrial District (IN) restricts height of buildings to
sixty-five (65) feet. The determination of building height, as well as allowed exceptions,
shall be as prescribed by the Code.
6.1.1 Air Traffic Control Tower
The proposed Air Traffic Control Tower, the location of which is shown on
Exhibit B and detailed in Exhibit E, is exempt from the height provisions of the
base IN, Industrial zoning district. The Air Traffic Control Tower shall be
allowed a maximum height of eight -five (85') feet.
6.2 Stormwater Detention
The airport has provided for detention on a regional scale with one portion of the airport
property set aside specifically for detention purposes. Future detention will comply
with this overall regional design. Should additional area be needed, the Airport Master
Plan has provided for potential up -grading of the detention pond. Each application will
provide drainage information adequate to ensure that the regional drainage plan is
maintained, and to ensure that the quantity of storm water run-off can be handled by
this regional detention pond. Also, this data shall ensure that appropriate drainage
patterns are occurring on the individual lease spaces and along drainage routes to the
regional detention pond.
6.3 Impervious Cover Limits
Impervious coverage limits will be a maximum of 95 percent for individual lease spaces.
The overall maximum impervious cover for the total airport area is 60 percent. The
"Long Term Development Plan" (Exhibit A) will increase the overall impervious cover
at the airport to 22 percent, well below the allowed 60 percent.
3
Georgetown Municipal Airport
Planned Unit Development (PUD)
Development Plan, Page 3 of 6
6.4 Setbacks
Application
Location
Measured From
Setback Required
All Structures
Internal Streets
Edge of Pavement
35 feet
All Structures
External Street
( Property Line
25 Feet
All Buildings...—
Side and Rear
Lease Lines
10 feet
All Structures
Adjacent to
Taxi -Ways
NA
None
6.5 Parking Standards
Use
Parking Requirement
Office / Business Park
1 space for every 400 square feet of Office space
Commercial / Retail
1 space for every 200 square feet of Commercial / Retail
space
Hangars / Indoor
Repair Areas
Exempt
Food Service Facilities
, 1 space for every 100 square feet
6.6 Landscaping / Tree Preservation
Landscape and tree preservation requirements will be fulfilled within the front yard
setbacks along internal and external streets. This requirement will be calculated as
follows:
■ Determine the total square footage within the front setback areas along the
internal and external right-of-way.
■ Divide this total square footage by 600.
■ Multiply the sum by 2.
• The sum provided in item 3 above equals the total number of shrubs to be
planted within the front setback areas and along any building facade facing the
right-of-way.
• In addition to the shrubs to be planted, all trees 3 caliper inches or greater shall
be preserved in all front setback areas and no removal shall occur in these areas
without prior approval from the Development Services Division.
The crown area of existing trees to be preserved in the front setback may be deducted
from the total square footage within the front yard setback for the purposes of
11
Georgetown Municipal Airport
Planned Unit Development (PUD)
Development Plan, Page 4 of 6
calculating the number of shrubs required in the front yard setback. Existing trees not in
the front setback may be preserved if there is no conflict with safe flight operations. A
crown area credit to reduce the shrub requirement in the front yard will be given for
these as well.
6.6.1 Parking Lot Screening
Parking lot screening, as required pursuant to Section 8.05.010 of the Code, shall
be required within front yard setbacks when parking is situated between
buildings and the right-of-way.
These plantings required will be calculated separately from those required under
the landscape requirement.
6.7 Drive Access
Driveway access points will be permitted along Airport Road, a minor arterial, with a
separation of 300 feet between driveways. Internal streets on the Airport Master Plan are
considered to be local streets and will not require driveway separation. However, on corner
lots, drives shall be spaced 60 feet from any street intersection.
E
Georgetown Municipal Airport
Planned Unit Development (PUD)
Development Plan, Page 5 of 6
Exhibit "A":
Exhibit 'B":
Exhibit "C":
Exhibit "D":
Exhibit "E":
Georgetown Municipal Airport
Planned Unit Development (PUD)
Development Plan, Page 6 of 6
LIST OF EXHIBITS
Location Map
Long Term Development Plan
Ultimate Airport Land Use Plan
Summary of Future Development Plans
Air Traffic Control Tower
0
IT",
Legend
OSite C ici a irport
Parcel Boundaries David Wright Survey, 443 acres more or less
.�a (Property and boundary lines are approximate)
`! City Li
Georgetown Municipal Airport
Planned Unit Development (PUD)
(l oinlnr. mi...F OL.... r„L:L:a n
n
z
0
0
0
N
O
a
iCt uw. i.\V'x x.wr ..4n:µ4+ uxa:�w1 Givai - YJ yr vu 1 11 v.
11111�',�ttlii2t � ��"
hill: ttllilll i�� ;.
11111 (t[lillili�
illltt'�tikitilltil� � � /�
(illl1���lilllllli} ���
litil�a 11111111111 ��,
lltili llllitilllt
tl U tl�itlltlitiitt
iililt 'ltltllllliil
lllittt'tlllllltlltll ��
llllilt �-ttittiltlltlt
Mill llllllt
ilS�-it_?'1�t1�-'tti1111It11it1
Ittlll_9t'„l lllllitllilltll
tlli�t�•C�"? .illltltltlllllll
Itlill,l,lt ,�llilllltlllilll't
HIM it I III 11111111111
.H111 1l,tA,liiilitliitltllli,
lllllwkIITI Itilililllltitlii
IIIld,t41), 1Itii111t111111111'
lillii1i11C' Illllilillittlllt
;1. �' lllltt
r
w
Ci m
C =
C7
-c
w �
17 A
lltliltt
���llllilililL.1-1-1.111
tlililllilllt.l-1-liTiili
�1t11iiltiUlliilill'lliilliilli
ittliilliltiTTll111lititilliltlll
111 --"•y itltililll
It [ t Ilii
..�llllillllllllllltlli
`''litliltilliitlltiliilllli� l��t�i-rr
'^?'illililllillillltllitliititll
lliilttllliilll ll tttlililili
ililliililliillltliitlllli
llittlllillliilllilt
llllllllllllli
llititlll
, `� X
111D _ _
Georgetown Municipal Airport
Planned Unit Development (PUD)
rhve�h rmeo n+ Dlon r-vhihif (`
I �
a G
a a p
;apaa
�> a6 DDC
+ a a a Il L
i annaaL
a n a 8 p p L
npaaaaaL
".�nnaaaanL
r:IlannanaaL
`aa 66a Dana:'t
'b G a 6apna6'6L
r:ipaaanaan oq
r a a a p 6 n n p arrr
-�annnGar'r-r.rrr
�
a n n a p '° rrrrrr
p p p p hr^i'rrcrrrr :rrrrrrr
o a a nr
rFrrrrrrrrr
� n �..,-rrrrrrrrrrrrr
I I I I u
+ ,rrrrrr
-rrrrc
rrrr-r
x^ err
;^r -r
^It -I r
rr
-r
r
tea
' 'tllllilllllltillt lull
�llliililiilltiltttlldlit tilt ii
'�b lllllttill ll lllil111 llllllllll
ij:i>tlilllillllllllllld liltl�lllllliilli
llllitild11111ll ltlllil':llllt111111i
ill tillil�'Ylitt " litlil1l1111I11111i1111
}`. llitltllllll �.tllllllttlillilllllllltll
`1111�iitttll i1111ll1i111i11lllllttitil
�I�. ilillillltl,l�,� ilillililltiltlititiliililli
' tllllilllli 11il1tili11111111111iillillP
'�`�1 itlilliiti :� lillilllllllllllllllilll
?1� lilllillil - illlllllllllllillltll
” ii' llliiilli `illlllllllllllllll
�-�'• lllitil ',' llillilllliiii
i�
Y
gI
L
x
m
v
a
i
o
c
n
11111�',�ttlii2t � ��"
hill: ttllilll i�� ;.
11111 (t[lillili�
illltt'�tikitilltil� � � /�
(illl1���lilllllli} ���
litil�a 11111111111 ��,
lltili llllitilllt
tl U tl�itlltlitiitt
iililt 'ltltllllliil
lllittt'tlllllltlltll ��
llllilt �-ttittiltlltlt
Mill llllllt
ilS�-it_?'1�t1�-'tti1111It11it1
Ittlll_9t'„l lllllitllilltll
tlli�t�•C�"? .illltltltlllllll
Itlill,l,lt ,�llilllltlllilll't
HIM it I III 11111111111
.H111 1l,tA,liiilitliitltllli,
lllllwkIITI Itilililllltitlii
IIIld,t41), 1Itii111t111111111'
lillii1i11C' Illllilillittlllt
;1. �' lllltt
r
w
Ci m
C =
C7
-c
w �
17 A
lltliltt
���llllilililL.1-1-1.111
tlililllilllt.l-1-liTiili
�1t11iiltiUlliilill'lliilliilli
ittliilliltiTTll111lititilliltlll
111 --"•y itltililll
It [ t Ilii
..�llllillllllllllltlli
`''litliltilliitlltiliilllli� l��t�i-rr
'^?'illililllillillltllitliititll
lliilttllliilll ll tttlililili
ililliililliillltliitlllli
llittlllillliilllilt
llllllllllllli
llititlll
, `� X
111D _ _
Georgetown Municipal Airport
Planned Unit Development (PUD)
rhve�h rmeo n+ Dlon r-vhihif (`
I �
a G
a a p
;apaa
�> a6 DDC
+ a a a Il L
i annaaL
a n a 8 p p L
npaaaaaL
".�nnaaaanL
r:IlannanaaL
`aa 66a Dana:'t
'b G a 6apna6'6L
r:ipaaanaan oq
r a a a p 6 n n p arrr
-�annnGar'r-r.rrr
�
a n n a p '° rrrrrr
p p p p hr^i'rrcrrrr :rrrrrrr
o a a nr
rFrrrrrrrrr
� n �..,-rrrrrrrrrrrrr
I I I I u
+ ,rrrrrr
-rrrrc
rrrr-r
x^ err
;^r -r
^It -I r
rr
-r
r
tea
' 'tllllilllllltillt lull
�llliililiilltiltttlldlit tilt ii
'�b lllllttill ll lllil111 llllllllll
ij:i>tlilllillllllllllld liltl�lllllliilli
llllitild11111ll ltlllil':llllt111111i
ill tillil�'Ylitt " litlil1l1111I11111i1111
}`. llitltllllll �.tllllllttlillilllllllltll
`1111�iitttll i1111ll1i111i11lllllttitil
�I�. ilillillltl,l�,� ilillililltiltlititiliililli
' tllllilllli 11il1tili11111111111iillillP
'�`�1 itlilliiti :� lillilllllllllllllllilll
?1� lilllillil - illlllllllllllillltll
” ii' llliiilli `illlllllllllllllll
�-�'• lllitil ',' llillilllliiii
i�
Y
gI
AIRPORT MASTER PLAN UPDATE
SECTION FOUR GEORGETOWN MUNICIPAL AIRPORT
AIRPORT DEVELOPMENT PLANS I GEORGETOWN, TEXAS
This section provides a development plan for Georgetown Municipal Airport (GTU). The consultant
recommends a list of projects along with their sequencing over 20 years: short-term (0-5 years),
intermediate term (5-10 years), and long-term (10-20 years). The projects and sequencing are
reflected in Exhibits 4.1, 4.2 and 4.3. It is important to note that the exhibits represent the
consultant's recommended phasing of projects, but do not in all cases reflect the City's policy for
airport development. Some projects depicted in the exhibits fall into the category of projects for
which the City has no current plans or intention to fund or seek funding and therefore may not be
completed within the time frame shown on the exhibits.
These proposals were derived to meet anticipated aviation facility demands under the "W/O NCTA
& W/ATCT" scenario, as shown in Section Three, Future Facility Requirements. The development
costs associated with each project are included in this section.
Also addressed in this section are the existing airspace and ground conditions that might constrain the
development of the airport, and the corresponding recommendations. Additionally, the Airport
Layout Plan (ALP) drawings are briefly discussed in this section.
There are two types of projects recommended: (1) items relating to the safe and efficient
management of the airport, and (2) projects needed to provide aircraft parking, storage, and
maintenance.
Under (1) the following projects are recommended: construct ATCT, construct taxiway serving
Runway 11-29 (35 feet wide), construct then extend parallel taxiway (35 feet wide), relocate self
fueling station, relocate AWOS, relocate windcone and segmented circle, construct emergency road,
construct stub taxiways, land acquisition, install PAPI-4, relocate fencing, install signage.
Under (2) and under the "W/O NCTA & W/ATCT" scenario, there is a projected need over 20 years
for 114 more hangers and 35 tie -down spaces.
Georgetown Municipal Airport 4.1
Planned Unit Development (PUD)
Development Plan, Exhibit D, page 1 of 11
The recommendation over 20 years is for 8
Airport Master Plan Update
storage/maintenance hangers totaling 117,900 square feet, 2 storage buildings totaling 9,400 square
feet, 8 T -Hangers (one 8 -unit, one 10 -unit, one 12 -unit, one 14 -unit, and four 16 -unit), and a
32,380 square yard parking apron. All of these could be developed on the east side of the airport.
The numbers for W/NCTA are lower: projected need for 23 hangers and 6 tie -downs.
These recommendations, based on the City's current plans and intentions, can be divided into three
categories:
Those projects related to the safe and efficient management of the airport, which the City
plans to implement as FAA/TxDOT grants become available (these are shown, with projected
costs, in Tables 4.1, 4.2 and 4.3);
Those projects related to the safe and efficient management of the airport, which the City
does not plan to implement, unless it alters its plans and intentions at a later date (these are
listed, with projected costs but without project dates in Table 4.4); and
Those projects related to aircraft parking, storage and maintenance, which the City does not
plan to implement, but can be developed by private investment on leased airport land as
shown on the ALP (these are listed with projected costs but without project dates, since they
will be developed on a "as desired" basis, in Table 4.5).
Category One:
Projects related to the safe and efficient management of the airport, which the City plans to
implement as FAA/TxDOT grants become available.
4.1 SHORT-TERM DEVELOPMENT PLAN
During the short-term development period (0-5 years), the following projects will be implemented, as
grants are available (see Table 4.1):
• Construction of the ATCT, for which FAA/TxDOT grants funds have been approved, the
design and construction consultant engaged, and the site selected.
Georgetown Municipal Airport
Planned Unit Development (PUD)
Development Plan, Exhibit D, page 2 of 11
4.2
Airport Master Plan Update
Construct a full-length taxiway serving 11-29, connecting the southwestern apron with
existing Taxiway "B." This connection provides a direct taxi route to Runway 11 for traffic
originating from the south side of the terminal. It will encourage pilots to operate on Runway
11-29, which will alleviate heavy traffic on Runway 18-36.
a Relocate AWOS.
0 Relocate windcone and segmented circle.
® Install PAPI-4.
® Construct emergency road. This will allow access to the airport from fire station.
® Install signage.
Two other projects, including rehabilitation of airport fencing and rehabilitation of Runway 11-29,
are already listed in the City's airport improvement plan, and are not included here and in Table 4.1.
As discussed in Section Three, Future Facility Requirements, the available records of Runway 11-29
pavement strength were not consistent. It is recommended that professional pavement testing and
evaluation services be pursued to determine the current pavement strength of Runway 11-29.
Table 4.1 summarizes the estimated short-term development costs of projects in Category 1. It
should be noted that the participation shares shown listed in Table 4.1 were based on the current
federal and state funding programs, and are subject to revision if changes occur in the funding
programs during the short-term development period.
Georgetown Municipal Airport
Planned Unit Development (PUD)
Development Plan, Exhibit D, page 3 of 11
4.3
Airport Master Plan Update
Table 4.1
Project Development Cost — Short -Term (0-5 Years)
Source: GRW Willis, Inc.
4.2 INTERMEDIATE-TERM DEVELOPMENT PLAN
During the intermediate-term development period (5-10 years), the following projects will be
implemented, as grants are available (see Table 4.2):
O As shown in Exhibit 4.2, a taxiway parallel to Runway 18-36 with a centerline separation of
300 feet will be built, connecting Runway 18 end with the full-length taxiway serving Runway
11-29,
4 A new stub taxiway will connect the northern aircraft parking apron with Runway 11-36 by
crossing through the new parallel taxiway. Three pieces of pavement will be added to
Taxiway "A" at the Runway 18 end, to support two-way taxiways at the Runway 18 end. The
taxing route on the Taxiway "A" will be adjusted and marked accordingly. As a result of
these improvements, aircraft taxiing circulation will be significantly improved along the
building line, especially on the aircraft apron.
® Install signage.
Table 4.2 summarizes the estimated intermediate-term development costs of projects in Category 1.
It should be noted that the participation shares shown listed in Table 4.2 were based on the current
federal and state funding programs, and are subject to revision if changes occur in the funding
programs during the short-term development period.
Georgetown Municipal Airport
Planned Unit Development (PUD)
Development Plan, Exhibit D, page 5 of 11
4.5
Airport Master Plan Update
4.3 LONG-TERM DEVELOPMENT PLAN
During the long-term development period (10-20 years), the following projects will be implemented,
as grants are available (see Table 4.3):
As shown on Exhibit 4.3, on the airfield side, the parallel taxiway serving Runway 18-36 will
be extended to connect with Runway 36 end. Similar to Runway 18 end, by adding one
piece of pavement to the north edge of Taxiway "A" at the Runway 36 end, a simultaneous
two-way exit/entrance route is established.
Relocate fencing.
i Install signage.
Table 4.3 summarizes the estimated long-term development costs of projects in Category 1. It
should be noted that the participation shares shown listed in Table 4.3 were based on the current
federal and state funding programs, and are subject to revision if changes occur in the funding
programs during the short-term development period.
Georgetown Municipal Airport
Planned Unit Development (PUD) 4.7
Development Plan, Exhibit D, page 7 of 11
Airport Master Plan Update
Table 4.3
Project Development Cost — Long -Term (10-20 Years)
Extend Parallel Taxiway (35 feet wide)
$
392,000
$
352,800
$
39,200
Relocate Fencing
$
34,000
$
30,600
$
31400
Install Signage
$
71000
$
61300
$
700
INTERMEDIATE-TERM TOTAL
$
433,000
$
389,700
$
43,300
Note: Estimates are based on Year 2004 dollars
Source: GRW Willis, Inc.
Category Two:
Projects related to the safe and efficient management of the airport, which the City does not
plan to implement, unless it alters it plans and intentions at a later date (these are listed, with
projected costs but without project dates).
4.4 OTHER PROJECTS WITH NO CURRENT PLANS TO BE IMPLEMENTED
The consultant recommends the following projects related to the safe and efficient management of
the airport, which the City has no current plans or intentions of implementing. They are listed with
projected costs but without implementation dates in Table 4.5.
As shown in Exhibit 4.1, add a total of approximately 32,380 square yards of apron to the
existing aircraft parking apron. If combined with other proposals (especially the relocation of
the Avgas self -fuel stations, below), a total of 57 aircraft tie -downs could be installed on the
paved apron, and aircraft taxiing flow on the apron would be improved. A revised version of
this proposal as related to tie -downs could be developed with private funds, and is included
under 4.6.
Relocate the Avgas self -fueling stations, which are currently located near the middle of the
existing apron, to the north of the terminal, along with approximately 2,720 square yards of
apron.
m Acquire land (6.9 Acres) within the runway/taxiway Object Free Area (OFA), to be included
in the ultimate airport property. About seven residential land tracts, located along the
northwest airport boundary and adjacent to the ultimate property line, should also be
Georgetown Municipal Airport
Planned Unit Development (PUD)
Development Plan, Exhibit D, page 9 of 11
4.9
Airport Master Plan Update
acquired by the City. All residential structures and amenities would need to be removed
from these tracts.
While the City has no current plans or intentions to acquire these properties, it will seek to obtain
any that become available for purchase and the City will apply for all appropriate federal and state
funds to assist in the acquisition of these lands.
Additionally, to ensure a safe environment around the airport, the runway protection zones should
be protected. As discussed in Section Three, Future Facility Requirements, it is recommended that as
long-term ultimate development is implemented, the City must acquire avigation easements for all
property within the runway protection zones but outside the ultimate airport property line. All
residential and public gathering facilities within the proposed avigation easements must be removed.
Airport Layout Drawings (ALP), attached in Appendix "C," illustrates in details the proposed ultimate
airport property and avigation easements.
Table 4.4 summarizes the estimated development costs of projects in Category 2. It should be noted
that the participation shares shown listed in Table 4.4 were based on the current federal and state
funding programs, and are subject to revision if changes occur in the funding programs during the
short-term development period.
Table 4.4
Project Development Cost
Other Projects With No Current Plans to Be Implemented
Construct Aircraft Parking Aron
$ 1,1911000
$ 1,071,900
$ 119,100
Short-term
Relocate Self Fueling Station
$ 94,000
$ 84,600
$ 9,400
Short-term
Land Acquisition (6.9 Acres)
$ 1,431,000
$ 1,287,900
$ 143,100
Long-term
OTHER PROJECTS TOTAL
$ 2,7161000
$ 21444,400
$ 271,600
Note: Estimates are based on Year 2004 dollars
Source: GRW Willis, Inc.
Georgetown Municipal Airport
Planned Unit Development (PUD)
Development Plan, Exhibit D, page 10 of 11
4.10
Airport Master Plan Update
Category Three:
Projects related to aircraft parking, storage and maintenance, which the City does not plan to
implement, but can be developed by private investment on leased airport land as shown on the
ALP
4.5 PROJECTS TO PROVIDE AIRCRAFT STORAGE, MAINTENANCE AND PARKING, TO BE
IMPLEMENTED WITH PRIVATE FUNDS
The consultant recommends building a number of box hangers, storage buildings, T -hangers, and tie -
down spaces to accommodate the projected need over 20 years for 114 more hangers and 35 tie -
down spaces under the "W/O NCTA & W/ATCT" scenario: 8 storage/maintenance hangers totaling
117,900 sq. ft., 2 storage buildings totaling 9,400 sq. ft., 8 T -Hangers (one 8 -unit, one 10 -unit, one
12 -unit, one 14 -unit, and four 16 -unit), and a 32,380 sq. yd. parking apron.
Since the City does not plan to build or develop any aircraft parking (e.g., apron) or
storage/maintenance (T -hangers and hangers), this projected need will be met by private investment
on leased land, and on an "as desired" basis. The Land Use Map provides land for the development
of such projects in four distinct areas on the east side of the airport. Table 4.5 provides estimated
costs for these projects, but without implementation dates.
Table 4.5 summarizes the estimated development costs of projects in Category 3.
Table 4.5
Project Development Cost — Projects To Provide Aircraft Storage,
Maintenance And Parking, To Be Implemented With Private Funds
Source: GRW Willis, Inc.
Georgetown Municipal Airport
Planned Unit Development (PUD)
Development Plan, Exhibit D, page 11 of 11
4.11
Airport Master Plan Update
N.T.S
NOTE: Elevations (except Cab) and Intermediate Floor Levels
are subject to change for the final design of the ATCT.
Georgetown Municipal Airport
Planned Unit Development (PUD)
Development Plan, Exhibit E